Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
ATLAS MDT Electronics Mezzanine PCB Radiation Hardness Assurance Eric Hazen – Boston University.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Performance of SPIROC chips in SKIROC mode
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
Charge collection studies on heavily diodes from RD50 multiplication run (update) G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
Performances of the HV system out of Drawers Roméo Bonnefoy, Robert Chadelas, Christian Fayard, Marie-Lise Mercier, Eric Sahuc and François Vazeille (LPC.
The Tile PMTs From the PMT design studies to the production and QA tests François Vazeille LPC Clermont-Ferrand On behalf of many people who worked on.
Short news on the FATALIC project Wednesday Tile Upgrade meeting 2016 May 4 Roméo Bonnefoy and François Vazeille  Communication Main Board-Daughter Board.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Status of FATALIC and its MB Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team, in.
Information about Multi-conductor cables of the Remote HV option Wednesday Tile upgrade meeting 10 February 2016 François Vazeille (LPC Clermont-Ferrand)
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Discussion on the integrator specifications with comparison of the 3 options Debriefing meeting at LPC, 28 April 2016 François Vazeille  Summary of the.
PreShower Characterisations
RD50 CCE measurements and annealing studies on proton irradiated p-type MCz diodes Herbert Hoedlmosera, Michael Molla, Michael Koehlerb, Henri Nordlundc.
"Drawer Mechanics - MiniDrawer"
Tile Upgrade Workshop (CERN- February 2008, 8 and 9)
Upgrade activities at Clermont-Ferrand
Test bench for active bases for SATLAS Photomultipliers
of the High Voltage part of the on-detector electronics
TileCal issues and Combined Performance
ACTIVE DIVIDER for anode currents up to 10 microamps
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Mini-drawers, FE-ASIC , Integrator
Tilecal week (8 February 2012)
Status of upgrade works at Clermont-Ferrand
Compact readout unit for the EP-RADMON radiation monitoring sensors
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
First noise measurements in the FATALIC option
Presentation transcript:

Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique Pallin, Christian Fayard, Marie-Lise Mercier, Eric Sahuc.  Summary of previous progresses  Main results given in the Tilecal Note (Note not yet approved)  Missing electronics studies to do  Radiation hardness and next tests  First production for ITC scintillators  Conclusion 1

Summary of previous progresses Passive Dividers Active Dividers  Goal: To keep the Tilecal performances (Linearity, energy resolution) for the measurement of very high energies at the highest luminosities.  Proposed solution : Replacement of present “Passive Dividers” by “Active Dividers” keeping stable the voltage repartition in between every stage  Use of active components (Transistors and diodes) in the last 3 stages, in order to balance the current stream induced by Minimum Bias events.  Preliminary results previously shown [Tilecal meeting, 17 June 2011]. 2

Main results given in the Tilecal Note (The Note ATL-COM-TILECAL is not yet approved)  Pure electronics tests using the upgraded Divider Test Bench  Interdynode voltage comparisons without/with injected currents of 10 Passive and 20 Active Dividers.  Protocol for the certifications of productions.  Two series of tests  Full tests of Dividers associated to PMTs  Comparisons for a given AC light (Signal) of 20 sets ″PMT-Passive Divider-Active Divider″ in function of the injected DC light (Minimum Bias). No other BE electronics than a scope Test Bench of batch of 10 Dividers Passive Active 3

 Summary of specifications ATLASsATLAS TilecalITCTilecalITC Maximum anode current(µA) Maximum non-linearity 1%  1% 4

 Summary of results for currents up 120 µA  Examples of comparison PMT-Passive Divider for 2 current ranges - NL can reach 40%. - NL < 1% at 2 µA PMT#AB2484, Divider# PMT-Active Divider for 2 current ranges - Only 5 sets show a small NL tendency other sets have a NL  0%. PMT#9F23Q1 Divider#2 PMT#AA0061 Divider#1 5

 General results from the 20 sets  Passive Dividers : Results and comparison s of the means to simulations  Active Dividers Max anode current 5 bases15 bases 50 µANL < 0.5%NL  0% µANL < 1%NL  0% - The behavior differences are likely due to the PMT behaviors. - The Active Dividers fit all ATLAS (Crack  8µA) and sATLAS (Tilecal  10 µA and Crack  40 µA) specifications, with an improved PMT working and a large safety everywhere. - Simulations at 20 µA: NL < 0.2%. - Passive Dividers fit the ATLAS conditions: NL < 1% as requested. - Very good agreement with simulations. 6

 Gain dispersion  Comparison of absolute gains without DC currents Active Dividers give a gain 22% higher than Passive Dividers. Precisely: (21.9  1.8) % 20 Active Dividers coupled to the same PMT at the same HV  Gain dispersion < 0.7%: a very good working homogeneity. 7

Missing electronics studies to do and completion of the Divider Note As proposed by comments on the Divider Note: Noise studies Comparisons of Passive and Active Dividers on the PMT working  After this Stockholm meeting. 8

Radiation hardness and next tests  Full application of the ATLAS radiation policy TID (Gammas): Gray NIEL (neutrons): 1 MeV eq.n/cm 2 SEE (protons): >20 MeV h/cm 2  Requested tests of 20 Dividers following the ATLAS protocol, likely TID and NIEL only.  First indications - LHCb tests on 4 Dividers: no failure up to the maximum tested dose of 870 Gy and the whole LHCb preshower still working. - Argonne tests (See Gary’s results) on 4 Dividers: still working.  Most pessimistic estimates (LB) while waiting for a new ATLAS policy. 9 RadiationSFsimSFldrSFlotSRL/LHCRTC/LHCSRL/sLHCRTC/sLHC TID NIEL SEE

 Clermont-Ferrand set-up - 20 Dividers: whole last 3 stages + resistors simulating the other ones Transistors alone + 8 Diodes alone (with direct/inverted polarities). - Everything supplied at the right HV and on-line monitored. Last 3 stages Transistors DiodesResistors PCB to be irradiated  Special PCB to irradiate: active components within a square 7x7 cm 2.  Complete Test bench with on-line monitoring Power Supply Mux/DAQ USB interface PCB - Hardware ready. - Software almost ready + working tests to do. - Needs only the connection to a laptop under labview. 10

 Experimental sites for tests ?  Interest of having a whole on-line monitoring Testing up to the maximum doses with a permanent monitoring enables to know the Divider status at intermediate doses: - from ATLAS to SATLAS, - for Tilecal and ITC channels, - for softer new ATLAS radiation rules (Yesterday Liq Ar talk).  First considered option : X-generator at Clermont-Ferrand (250 keV max) long investigations and discussion with CERN experts (Federico Faccio and Philippe Farthouat)  Big calibration difficulties in the dose estimates.  Preferred option: Gamma rays  smaller mis-estimates of the doses.  AIDA Transnational Access  support for tests in 5 European sites (DESY, CERN, JSI, KIT, UCL) 11 But, are there possibilities in other Tilecal Institutes ?

First production for ITC scintillators  Batch of 350 Dividers soon delivered at CERN  Clermont-Ferrand orders to selected Cies (PCB, component placements, cables) through CERN.  Certification will be made at Clermont-Ferrand. - Set of 10 dividers takes about Half an hour for testing  A quality sheet. - About 1 week for the whole production. 12

Conclusion  The Passive Dividers fit the ATLAS specifications for Tilecal PMTs, but not fully for Crack scintillators.  The Active Dividers fit the sATLAS specifications for both Tilecal and Crack scintillators, within a wide range going well above the expected Luminosities.  The linearity (and the energy resolution) will be improved /ATLAS.  They could equip all the PMTs.  A very good agreement of electronic simulations and results, for both Passive and Active Dividers.  The Divider Test bench has been upgraded and can welcome Passive/Active Dividers.  A batch of 350 Active Dividers will equip now the Crack scintillators. 13

 Remaining studies to do - Noise studies. - Completion of the Divider Note. - Radiation tests, despite promising results (LHCb, Tilecal Argonne)  Complete radiation tests are scheduled  Clermont-Ferrand radiation test bench soon operational.  Ready to provide it to other Institutes for dedicated radiation tests with the on-line monitoring of the Divider working. 14