Jason Hade, Regional Planner Kern COG Workshop – November 21, 2002 High-Speed Rail for the Kern Region Kern Council of Governments.

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager 2011 MN State Planning Conference September 29, 2011.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Commission Electric Vehicle Activities Pat Perez California Energy Commission Joint.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
1 Trade Corridor Improvement Fund March 5, 2008 Southern California Consensus Group.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
California Integrated Waste Management Board Biennial Review Process.
SB4 Implementation & Kern County Oil and Gas EIR Update Air and Waste Management Association – Golden Empire Chapter Western States Petroleum Association.
October  AB 32 (2006)  Target: Greenhouse Gas (GHG) emissions at 1990 levels by 2020 and maintain reductions  Authorized the Cap and Trade Program.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
December 3,  Summarize how the bond act affects  The attributes of the high-speed rail system  The timing and sequence of construction.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Anaheim Regional Transportation Intermodal Center Project Update.
Analysis of the High Speed Rail in California Daniel Montanez 1, Antonio Castro 1 1 Napa Valley College, Napa, CA Abstract: San Francisco and Los Angeles.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
Destination 2030 Regional Transportation Plan Timeline and Process January 2004.
Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Division of Budgets August 22, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 14.
California Energy Commission Personal and Commercial Vehicle Choice High-Speed Rail Inputs and Assumptions for Transportation Energy Demand Forecasts Rosenfeld.
1 PLEASE NOTE: This information was presented during previous Economic Recovery Workshops. Since then, the information has been updated. Please refer to.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Workshops on Discussion Draft of Guidelines December 2014.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
TOWN & PARISH SEPTEMBER TRAINING SESSION. Agenda Overview of precept setting process Overview of Tax Base calculation Explaining the Council Tax calculation.
You are here.. Kern Council of Governments PM 10 Control Measures Workshop: Identifying the Best Available Control Measures to Local Government for Mobile.
LA Metro’s Highway Program May 29, 2014
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
Metropolitan Bakersfield High- Speed Rail Terminal Analysis and Evaluation A Presentation to the California High-Speed Rail Authority By the Kern Council.
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
Recent and Upcoming Activities for LIEE and CARE November /10 - IOU Budget Applications Adopted D )11/10 - IOU Budget.
Department of Transportation Submittal of Comments to Caltrans Regarding the Draft Environmental Impact Report/Environmental Impact Statement and Proposed.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Kern Council of Governments Triennial Performance Audit Workshop July 19, 2001.
CAHSR Board Meeting August 6, 2009 Section Update Los Angeles to San Diego (via the Inland Empire) Slide 1 of 10.
Harnessing Clean: Sameer Ranade Washington Environmental Council/Alliance for Jobs and Clean Energy.
Pre-State Allocation Board Meeting October 26, 2011 Presented By California Department of Education.
1 Spring Business Meeting Regional Haze SIP Development Survey San Francisco, California April 9, 2003.
Kern Council of Governments KERN REGIONAL BLUEPRINT PROJECT March 16, 2006.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Renewable Energy Planning Commissioner David Hochschild, California Energy Commission Margaret Cederoth, Sustainability Manager Board Meeting: Agenda Item.
City Council Meeting Tuesday, October 22, Background March 5, 2013: Marinship 101 to Council May 7, 2013: Council formed Steering Committee to work.
Recent Activities for LIEE and CARE November 2007 Proposed decision submission (R ) Proposed decision submission (R ) IOU reporting.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Connecting and Transforming California
Evaluation of FY12 Tracking and FY13 Planning Process
Community Impact Presentation to Board of Directors
Southwest LRT Project Craig Lamothe, AICP Senior Project Manager
Brackish Water Desalination Project
Vermillion River Greenway - Hastings MASTER PLAN
2014 Annual Program Evaluation (APE) Status Update
Presentation transcript:

Jason Hade, Regional Planner Kern COG Workshop – November 21, 2002 High-Speed Rail for the Kern Region Kern Council of Governments

Workshop Overview California High-Speed Rail Authority Progress Metropolitan Bakersfield High-Speed Rail Terminal Impact Analysis Upcoming Issues Resources/Questions

High-Speed Rail Authority Progress Rail Authority required to prepare a plan for the construction and operation of a high-speed train system for the state capable of achieving operating speeds of, at least, 200 mph Screening report for Sacramento- Bakersfield corridor approved by Authority on January 16, 2002

Environmental Review Process 2002/2003 state budget includes $7.05 million for Authority to prepare draft program EIR/EIS Draft program EIR/EIS scheduled for completion in August 2003 Final program EIR/EIS expected to be completed by December 2003

Metropolitan Bakersfield High-Speed Rail Terminal Impact Analysis Purpose of study is to analyze terminal impacts and benefits to assist with building consensus for final terminal site recommendation Three sites to be evaluated within Metropolitan Bakersfield: 7 th Standard Road/West of S.R. 99; Golden State/”F” Street to “M” Street; and Truxtun Avenue and “S” Street/Union Avenue. Wilbur Smith Associates to conduct study

Potential Terminal Sites

Project Timeline

Upcoming Issues Senate Bill 1856 – Authorizes a $9.95 billion general obligation bond for the November 2004 ballot –$9 billion would create state’s share of construction costs for San Francisco – Los Angeles segment of system Senate Bill 796 – eliminates the Authority’s December 31, 2003 sunset date Final alignment and terminal decisions to be made by Authority upon completion of environmental studies (December 2003)

Resources/Questions California High-Speed Rail Authority - SB 1856 and SB 796 information – Jason Hade, or (661)