Doc.:15-09-0417-00-wng0 Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid.

Slides:



Advertisements
Similar presentations
NIST Interoperability Framework for the Smart Grid
Advertisements

1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
TG4g - SUN May 2009 Brian K. Seal, Electric Power Research Institute doc.: IEEE g Project: IEEE P Working Group for Wireless Personal.
Smart Grid Interoperability Standards George W. Arnold, Eng.Sc.D. National Coordinator for Smart Grid Interoperability National Institute of Standards.
Doc.: IEEE xxxxx Submission doc. : IEEE doc. : IEEE pac Nov 2012 Slide 1 Project: IEEE P Working.
Doc.: IEEE TG4a January 2006 Pat Kinney - Kinney Consulting LLC.Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission January, 2004 Patrick Kinney, Kinney Consulting LLCSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0095r1 Submission Jan 2005 Gregg Rasor, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 1 Project: IEEE P Working Group for Wireless.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
1 Re-energizing America: Establishing Standards for a Nationwide Smart Grid Dean Prochaska National Coordinator for Smart Grid Conformance National Institute.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG 6tisch Opening/Closing.
Doc.: IEEE /349r0 Submission November 2000 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Interoperability Standards and Next Generation Interconnectivity Pankaj Batra Chief (Engineering) CERC.
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
May 2006 doc:IEEE wng0 Slide 1 Submission Liang Li, Vinno Technologies Inc. Bob Heile IEEE WG. Project: IEEE P Working Group.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE SCWNGSlide 1 July 2012 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Consistent, Standardized.
Doc.: IEEE e SG4e Jan 2008 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE u Submission Amarjeet Kumar, Procubed Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: b Submission January 2006 Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: b Submission November 2004 Robert Poor, Ember Corp.; Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG 6tisch Closing Report for.
Doc.: IEEE wng0 SCWNGSlide 1 July 2011 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal.
IEEE g Sub missi on July 2010 Klaus Bender, PE, Utilities Telecom Council Sli de 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE SCWNGSlide 1 September 2012 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE xxxxx Submission doc. : IEEE Slide 1 Junbeom Hur and Sungrae Cho, Chung-Ang University Project: IEEE P
Doc.: IEEE g TG4g - SUN November 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
Doc.: IEEE g TG4g Presentation Jan 2010 C.S. Sum1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)‏
Doc.: IEEE g Submission March 2011 Xing Tao (SIMIT/WSNIRI), Khanh Tuan Le (TI) Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE wng0 SCWNGSlide 1 May 2012 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE g Submission March 2010 Kuor Hsin Chang, Monique Brown (Elster Solutions, M.B. Brown Consulting) Project: IEEE P
Doc.: IEEE Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE
14 March 2002 doc.: IEEE /152r1 Gregg Rasor, MotorolaSlide 1Submission Project: IEEE P Working Group for Wireless Personal Area Networks.
14 March 2002 doc.: IEEE /152r2 Gregg Rasor, MotorolaSlide 1Submission Project: IEEE P Working Group for Wireless Personal Area Networks.
Smart Grid Interoperability Standards
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
March 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Agenda November 2017 Plenary] Date.
Submission Title: [MC EventsList] Date Submitted: [11Jul00]
DOE Smart Grid Activities
doc.: IEEE <doc#>
November 18 Nov 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4e Closing Report for Atlanta.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
November 18 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4d Closing Report for Hawaii July 2007.
<month year> <Sept 2018>
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: z Comments on ax Coexistence Assurance.
平成31年2月 doc.: IEEE /424r1 November 2008
Submission Title: Monterey e/ Liaison Report.
January 2003 doc.: IEEE /056r0 May 2004
February 19 Nov 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4d Closing Report for Dallas.
平成31年2月 doc.: IEEE /424r1 November 2007
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Submission Title: [Frame and packet structure in ]
<month year> <Nov 2018>
July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [UTC Presentation to IEEE802] Date Submitted:
Rick Alfvin (Linespeed Events LLC)
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
November 2017 Project: IEEE P Working Group for Wireless Speciality Networks (WSN) Submission Title: SG a November 2017 Closing Report.
平成31年7月 doc.: IEEE /424r1 March 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Call.
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
平成31年7月 doc.: IEEE /424r1 November 2007
Presentation transcript:

doc.: wng0 Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Roadmap] Date Submitted: [13 May, 2009] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [251 Clair View Ct, Lake Zurich, IL, USA] Voice:[ ], Re: [In response to WNG call for presentations] Abstract:[Roadmap of US Smart Grid.] Purpose:[Informational as to the status of Smart Grid efforts in the USA Notice:This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P

doc.: wng0 Submission, Slide 2 Wireless Next Generation SC Smart Grid Puzzle: How do the pieces fit together?

doc.: wng0 Submission, Slide 3 Agenda Introduction Smart Grid Overview – D Hart, Elster Electricity Smart Grid Roadmap – P Kinney, Kinney Consulting ZigBee SE – J Buffington, Itron g – P Beecher, Beecher Communications Consultants P2030 – R Heile, ZigBee Alliance Conclusion

doc.: wng0 Submission, Slide 4 4 The National Institute of Standards and Technology (NIST) is the U.S. National Measurement Laboratory -- Mission: to develop and promote measurement, standards, and technology -- support objectives of federal participation in the development and use of voluntary standards. Who is NIST?

doc.: wng0 Submission, Slide 5 5 Energy Independence and Security Act (EISA) of 2007 Title XIII, Section Smart Grid Interoperability Framework The Framework: Protocols and standards that shall further align policy, business, & technology solutions Enable connection of all electric resources, including demand-side resources, into an efficient, reliable grid Seek input from: –FERC, DoE OE & Smart Grid Task Force, Smart Grid Advisory Committee, and other relevant Federal agencies –GWAC, IEEE, NEMA NIST Roles in Smart Grid NIST “… shall have primary responsibility to coordinate development of a framework that includes protocols and model standards for information management to achieve interoperability of smart grid devices and systems …”

doc.: wng0 Submission, Slide 6 6 Scope of framework: –Flexible, uniform, technology-neutral –Needs to accommodate traditional generation and transmission distributed generation, renewables, energy storage, energy efficiency enabling devices and systems flexibility to accommodate –regional and organizational differences –new technologies –Should include voluntary standards for electric appliances and equipment for homes and businesses that Enable emergency response or demand response for –load reduction –adjustment to load to provide ancillary services –response to crisis or load shedding to preserve grid reliability NIST Roles in Smart Grid (cont’d)

doc.: wng0 Submission, Slide 7 7 NIST EISA organization chart DOE Smart Grid Task Force NIST Executive NIST Smart Grid Interoperability Framework Stakeholders Group GWAC, IEEE, NEMA, FERC, EPRI Domain Expert Working Groups B2GI2GH2G Cross-cut Domain Interface T&D Outside contractor support (KB and meetings facilitators) Outside technical and administrative support Wider EISA interaction NIST Smart Grid Working Group

doc.: wng0 Submission, Slide 8 8 NIST work plan summary for (June - Sept 08) Review the current state of Smart Grid related standards and interoperability and present this in an overview Landscape Map tied to a detailed standards knowledge base. This will become a platform for developing consensus on where interoperability gaps exist and priorities for addressing those gaps. 2.(Sept 23-25) Present this information at GridWeek and invite participation in a NIST Interoperability Standards Workshop at GridInterop (Nov 11) that will be focused on evaluating a roadmap for addressing standards gaps and path toward interoperability. 3.NIST is also working to develop domain expert working groups to help with Gridweek and the workshop as well as to guide and sustain action on standards development and harmonization activities.

doc.: wng0 Submission, Slide 9 9 December 2007 EISA enactment Ongoing Standards coordination December 08 progress report Sept 23-25, DC GridWeek Meetings with NIST Stakeholders Website up and work plan available Nov. 11 Atlanta GridInterop NIST SG Workshop SG Knowledge Base development Development of Domain Expert Working Groups (DEWGs) DEWGs input on draft standards interoperability roadmap Roadmap presentation and review in domain breakouts Work with stakeholders: Roadmap design GridWeek and workshop planning Landscape Map prep June Present SG Knowledge Base and Landscape Map at GridWeek NIST EISA Work Plan schematic 2008 March December 2008 progress report will include: Introduction with EISA directions and scope Summary of completed work efforts Standards Landscape Map and overview of Smart Grid KB. Smart Grid Standards Roadmap version 1.0 Summary of stakeholder input Future year plans

doc.: wng0 Submission, Slide 10 NIST Summary 2007 EISA has mandated that NIST lead the coordination of a interoperability framework of object model standards and protocols DEWGs are being established to identify standards needs in Smart Grid domain areas A one-day NIST Interoperability Standards Workshop will be held in November co-joined with the GridInterop conference A report will be published in December on the status of interoperability standards for the Smart Groups

doc.: wng0 Submission, Slide 11 NIST/EPRI Slides from EPRI web site

doc.: wng0 Submission, Slide 12 Smart Grid Roadmap for 2009 As part of the Obama Administration’s commitment to moving the nation towards energy independence, the National Institute of Standards and Technology (NIST) has contracted with the Electric Power Research Institute, Inc. (EPRI) to help it develop an interim “Roadmap” for Smart Grid standards interoperability. To allow various industry stakeholders to provide comments and suggestions to the Roadmap, NIST is organizing a workshop on April to review the high-level principles for the Roadmap and a second workshop on May to review the draft findings and recommendations from the Roadmap. The first Roadmap Workshop was held at the Hyatt Regency at Reston Town Center, 1800 Presidents Street in Reston, Virginia. The second Roadmap workshop's location will be held at Gaylord National Resort & Convention. Both workshops are open to the public and free of charge Utilities Executive and Technical Staff, Regulators, Vendors, Builders, State and Federal Government Personnel, Consumer Advocates, Engineers, Planners and Integrators are strongly recommended to attend. NIST welcomes your participation in both of these events to provide input to the draft Roadmap.

doc.: wng0 Submission, Slide 13 Smart Grid Roadmap for 2009 (cont’d) The purpose of the Smart Grid Interoperability Workshop on May is to provide an opportunity for the NIST Domain Expert Working Groups (DEWGs) and other industry stakeholders to meet face to face for a second time to continue the consensus building process for a Smart Grid Standards Interoperability Interim Roadmap. The key objective of this exercise is to use this consensus based process to select a particular set of interoperable standards for key interfaces between domains that make up the Smart Grid Systems of Systems. Support high priority Smart Grid applications such as the four priority functionalities from the FERC Draft Smart Grid Policy: Demand Response, Wide Area Situational Awareness, Electric Storage, and Electric Transportation