VERSO. Verso Paper Corporation and OSIsoft Enterprise Agreement and Managed PI Presented by John Hume VERSO. Maine The Way Life Should Be.

Slides:



Advertisements
Similar presentations
Distributed Data Processing
Advertisements

Introduction Updates & Reminders Telephone Directory Impact of Consolidations on Websites.
ESafe Reporter V3.0 eSafe Learning and Certification Program February 2007.
Copyright c 2004 OSIsoft Inc. All rights reserved. Jon Peterson Andy Singh Brian Young Benny Gallardo Denis Vacher The Foundation of Real Time Performance.
1 Iowa Microsoft Class Action Settlement Teleconference June 6, 2007.
QAD On Demand Operational Delivery Kory D. Johnson QAD Explore 2012.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Managing the Information Technology Resource Jerry N. Luftman
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
Remote Control DBA Why Remote Database Support is the solution you have been looking for.
Introduction <Header Title> Last saved: YYYY-MM-DD
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 7: Planning a DNS Strategy.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
Guide to Operating System Security Chapter 2 Viruses, Worms, and Malicious Software.
1 © 2006 OSIsoft, Inc. – Company Confidential Enterprise Agreement (EA) Offering And Benefits May 2007 Value Now, Value Over Time.
© 2008 OSIsoft, Inc. | Company Confidential Panel : Business Value to the Enterprise of the PI System Real-time Infrastructure Moderator: Dr. Gretchen.
Empowering Business in Real Time. Taking PI Forward with the Enterprise Agreement Regional Seminar Series Raleigh Jim Alford Corporate PI Administrator.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
Copyright © Yokogawa Electric Corporation 13 th February Exaquantum R2.70 Enhancements.
Global Acquisitions and Mergers: Keeping PI in Focus OSI Users Conference 2003 May 12-14, 2003 Jamie Andrews Stan Megraw.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Monitoring the paper mill operations, production quality and KPI’s.
Empowering Business in Real Time. One.PI – Leveraging the Enterprise Agreement for Standardization Regional Seminar Series Richmond Nancy Whitlock Corporate.
Task Scheduler Pro Managing scheduled tasks across the enterprise Joe Vachon Sales Engineer.
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
Sumit Kumar Archana Kumar Group # 4 CSE 591 : Virtualization and Cloud Computing.
DTS Web Hosting, Rates And Services Web Hosting Internet Services Unit May 2006.
A Copper Bullet for Software Quality Improvement Michael Blaha Computer (IEEE), Volume: 37 No. 2, Feb
© 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008.
CA ARCserve and CA XOsoft Simplified Pricing Program October 2007.
SCSC 311 Information Systems: hardware and software.
Migrating Operations Applications to PI, by Rayan Hafiz – 2005 OSIsoft User Conferences, Frankfurt.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
© 2011 IBM Corporation 1 Definition Optional add on to standard Base Support (SWMA/Support Line, Warranty/HWMA) that delivers the following 1.Personalized.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
AURA MOWG EMOS & IST Re-Engineering 2 October 2007 Pat Johnson.
SAP Business Connector Integrating R/3 to Global Web Deployment Using XML and Business Connector.
OSIsoft User Conference Monterey, March 2002 PI ICE Deployment Industrial Evolution’s Experience with PI ICE Implementations Roland Heersink, CEO Sylvain.
SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.
If you are looking for a solution to your training administration nightmares, look no further! For a once off fee (starting at the salary for a reasonably.
Yokogawa Global MES Solution Centre (GMSC)
1 Session Number Presentation_ID © 2002, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for Security and Virtual Private Network.
PI System High Availability : Interface Redundancy and Disconnected Interface Startup Andy Singh, Ph.D., OPC Team Tony Cantele, Uniint Team Leader.
Enterprise PI With Remote Management By Alton Loe.
PI Notifications and ProcessBook 3.1
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
2 © 2005 OSIsoft, Inc. – Company Confidential PI Utilization: Strategies for Leveraging Existing Technologies in Refining.
PI System High Availability : Interface Redundancy and Disconnected Interface Startup Andy Singh, Ph.D., OPC Team Tony Cantele, Uniint Team Leader.
Real Time Goes Mainstream Dr. J. Patrick Kennedy, CEO and Founder OSIsoft Inc.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Real Time Information and Dynamic Response Dr. J. Patrick Kennedy, CEO and Founder OSIsoft Inc.
Michael Mast Senior Architect Applications Technology Oracle Corporation.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
Introduction to System Administration. System Administration  System Administration  Duties of System Administrator  Types of Administrators/Users.
1 Limited Distribution – © 2006 – OSIsoft, Inc. The PI Protocol Converter Connecting PI Client Products and PI to PI with DeltaV.
Oracle 10g Administration Oracle Server Introduction Copyright ©2006, Custom Training Institute.
«My future profession»
Unix Server Consolidation
VIRTUALizing the lab Richard Toeniskoetter
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Microsoft Braindumps Questions Answers
Introduction to System Administration
Introduction to System Administration
EIN 6133 Enterprise Engineering
Cisco Real Exam Dumps IT-Dumps
SharePoint Essentials Toolkit
COGNOS 8 BI - Introduction and Architecture Cognos CoE
Supports launch of cloud-based endpoint management service
Presentation transcript:

VERSO. Verso Paper Corporation and OSIsoft Enterprise Agreement and Managed PI Presented by John Hume VERSO. Maine The Way Life Should Be

VERSO. Verso Paper Corp - Androscoggin Mill  One of four Coated Paper Mills in the Verso Group  Produce 500,000 ton/year Coated Paper and Pulp for Magazines and Periodicals  Consume 1.2MM tons of wood/yr and 40Mgal/day of water.  Produce 125MW electricity  Annual Sales $1,628.8 million (2007)  Publicly traded as VRS

VERSO. History 1999 IP buys Corpora te PI Licenses 2000 Andro’s first PI Installed: 4 Servers, 5K process points, 10K scanner points servers, 130K points, 47 interface systems, 65 interfaces Aug 2006 IP Divests 4 Coated Paper Plants; Verso purchases EA FEB 2008 Sartell Mill installs Manage d PI MAR 2008 Andro begins mPI Install MAY 2008 mPI Install Comple te

VERSO. Enterprise vs. Old Corporate Agreement Similar Features  Both get unlimited PI points  Both get all standard interfaces  Both have 24x7 access to technical support

VERSO. Enterprise vs. Old Corporate Agreement What’s New?  OSIsoft will upgrade/patch/tune all PI components  OSIsoft will monitor and alert Verso and/or fix problems detected by the Managed PI system  Single Point of Contact for managing Verso and OSIsoft’s relationship  Access to the Center of Excellence (CoE) for strategic and tactical advice to get more value out of PI  UC Vouchers  Training Vouchers

VERSO. Enterprise vs. Old Corporate Agreement Why does it matter?  10 servers – all 2+ major version back  65 interface instances  Version inconsistent  Require frequent reboots  5 legacy interfaces  OPC and DCOM and XP  ABB Quaker Link Moore ICI & GE Cimplicity  1 PI Administrator

VERSO. EPM Planning at Androscoggin  1 month to survey  2 months to build detail system drawing  Implementation plan developed from analysis & drawing  Decided on an “On the Fly upgrade” approach  No scheduled shutdown  Areas prepared for intermittent PI outages

VERSO. Why? Enterprise vs. Old Corporate Agreement

VERSO. Week 1: Roll-Out  2 Field Service Engineers  1 Enterprise Project Manager turned temporary FSE  Final Planning Session  PI Administration, Plant Process Management and OSIsoft  Set Scope  Develop schedule  Plan reboots  Each server needs 2 upgrades - Known Issue 17138OSI8  3.xx to to  Add Managed PI and SMTP to OSIsoft NOC  Perform 1 st upgrade to set timing for rest of week

VERSO. Week 1: Results  Double PI Server version upgrades take 2.5 hrs/server  10 PI servers upgraded  All servers tuned & tested  Queues  Backups  Time Zone  Trust Table  Clients installed (PB/DL/SMT)  Debugging (Dr. Watson/MS Debug)  SDK  Managed PI installed and configured  mPI on 2 Interface Systems  OPC interfaces upgraded  PItoPI upgraded - 16 instances  MCN installed

VERSO. Week 2: Roll-Out  Interface Computers  31 remaining  Upgrade interfaces  Tune  Install Managed PI  15 interface types  OPC  APACS  RSLinx  HTML  ABB Quaker Link  ABB DIU  Moore  Modbus Plus  PI-Batch  GE-Simplicity  UNIX Fox-AIS  Fox XP  ABB 1180  PItoPI  Ulma

VERSO. Week 2: Results  3 OSIsoft Field Support Engineers  Averaged 10 interfaces / day  UNIX not monitored  2 Interface systems merged  Managed PI installed but follow up required  NOC monitoring 57 of 65 interface instances

VERSO. Week 3+: Follow-up  Continue resolving missing Managed PI information  NOC monitoring 57 of 65 interface instances  2 NT systems cannot be monitored  1 Ulma interface not in production  Home grown interface not monitored  1 UNIX  3 in process

VERSO. NOC Support Results  Low memory alerts  Unresponsive Interfaces  Tags reporting I/O Timeout  Follow the sun support via VPN  Perth, Singapore, San Leandro, Czech Republic, Montreal, Germany, Bahrain  Provided NOC with instructions for determining priority alerts  Working to help NOC discern real problems from process down time  NOC has become primary Interface support with VERSO as Secondary  Took 3 week vacation – NO PROBLEMS!

VERSO. Value Now!  3 weeks to PI Done Right!  Without the EA, time to upgrade/patch/tune is indefinable  Stable PI environment  OSIsoft updated systems for recent Security Patch  OSIsoft Eyes & Ears  More ZZZ’s at night  Shift activities from fighting fires to adding value

VERSO. Value Over Time!  Next Steps: Involve Center of Excellence  Lower cost of ownership by evaluating and restructuring complex PI architecture  Implement High Available Servers and Redundant interfaces  Automatic PI software updates  Explore VM  Explore Web Based PI access  Hold Value Realization Process to identify business and process initiatives where PI can add value

VERSO. Operations at a Glance mPI

VERSO. mPI Area at a Glance

VERSO. Questions