Drilling Rig URB-10-2SH property of. 2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method.

Slides:



Advertisements
Similar presentations
Zeki Aydan / / 1 of 19 FIT FOR THE FUTURE ???
Advertisements

O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
Since 1991 we have been planning and providing ad hoc solutions for a safe working environment acting therefore as a reliable and purposeful partner for.
Environmental Drilling By: Josh Humphreys October 8,2006.
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Xxxxxxxxxx TXD. TXD Design Goals Alternative to a “Big-Rig” Shallow oil/gas and CBM applications Handle range 3 casing Quick and easy set-up and breakdown.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF MECHATRONICS ENGINEERING STAIR CLIMBING WHEELCHAIR Prepared by: supervisor: Dua’a Dmadi.
Mechanisms. What is a Mechanism? A mechanism is the part of a machine which contains two or more pieces arranged so that the motion of one compels the.
Gateway To Technology Building Mechanisms Mechanisms
PACE Collaborative Project: Emerging Market Vehicle Transmission Design Team member: Anthony Smith Kevin Scott Decorian Harris Jacque Thornton Advisor:
Mechanisms Mechanisms PLTW Gateway
Hardinge Universal Turret Senior Design Project Project Sponsor: Hardinge Inc.
Introduction to Mechatronics and Mechatronics in Real Life Mariya Popovchenko 3 April 2006 JASS 2006, St. Petersburg.
Senior Design: Validation of Design December 15, 2008.
MANUFACTURING TECHNOLOGY UNIT – V Machine Tools. Manufacturing Technology.
Mechanical Transmissions
Drilling Engineering – PE311 Rotary System
Mechanisms Mechanisms Gateway To Technology®
TAFORGE A.S. COMPANY PRESENTATION
Scientific and production company “ALTERNATIVE TECHNOLOGIES”, CJSC Russia, Novosibirsk region, Koltsovo, 14 Tel./Fax: (383)
Chapter 20 Fundamentals of Machining/Orthogonal Machining (Part I Review) EIN 3390 Manufacturing Processes Spring,
Prepared by Mahmoud F. Elbatta Ahmad Alyazgi Amjad Alaskary Akram abo Twahina Roshdi tambora.
“Uralmash Oil and Gas Equipment Holding” LLC
AHTD Symposium - Micron April 4-5, 2006 Howard Horn How to Win with Danaher Motion!
THE NEW COMACCHIO TUNNEL MULTIPURPOSE DRILLING RIG
Lathe Machine.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
DRIVING INNOVATION © Poclain Hydraulics – 2010 Confidential.
AIR BEARING SYSTEM.
Advanced Advanced Aluminium Aluminium Technology Technology.
SEMINAR ON HIGH SPEED MACHINING (HSM). CONTENTS  Introduction  Definition of HSM  Advantages  Application areas  Machining system  Some recommended.
Purpose of transmission. Objectives 1. Explain and secure destination of transmission 2. Tell about structure and principle of the transmission 3. Talk.
Mechanisms. What is a Mechanism? A mechanism is the part of a machine which contains two or more pieces arranged so that the motion of one compels the.
New sliding gates gearmotor C721 (24 Vdc). Summary  Why a new 24Vdc operator?  USPs  Technical specifications.
MOTORS PUMPS GEARBOXES VALVES CONTROLS NAHI, LLC - MAIN OFFICE : PROVIDING CUSTOMER DRIVEN SOLUTIONS - LOW SPEED, HIGH TORQUE MOTORS Made.
Presentation of Drilling Rigs GBU-5M “Wasp” and GBU-7M “Colibri”
Abstract There is a high amount of necessity in third world countries for many concepts in mechanical engineering to inspire learning and choosing engineering.
fischertechnik Mechanisms
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
Linear Mechanical Systems Sizing & Estimating Life of a Positioning System.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
ME 4182 Mid-Term Presentation The Likus Group 6/21/00 Philip Reale, Group Leader Matt Berrell Justin Disney Anthony Godfrey Gwyneth Smith Lisa Smith The.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
After Service Introduction
Robotics for Tomorrow
MANUFACTURING ENGINEERING DEPARTMENT
Presentation on Hooke's joint
SERVO TECHNO SYSTEM CO.,LTD DC Motor with Br ush Introduction of N ew Products 1.37.2 dia. Planetary gear head 2.30 dia. Planetary gear head 3. Introduction.
CNC FEED DRIVES Akhil Krishnan G M.Tech 1. CONTENTS 1.Introduction 2.Requirements of CNC feed drives 3.Servo motor 3.1 Servo drive control 3.2 Components.
CNC FEED DRIVES.
Types of material handling equipment
Kazan Helicopters PJSC
“RAM” LLC and its Nano-Diamond Chrome (NDC) cover technology
RAM LLC and its Nano-Diamond Chrome (NDC) cover technology
Quick Steel Coil Mover in the Large Steel Plate Production Line
Waldemar Janicki, Adam Adamkowski
Mechanisms Mechanisms Gateway To Technology®
UNIT-I SLOTTING MACHINES
HYDRAULICS & PNEUMATICS
Hydraulics Motor.
Dipl. eng. Leonov D., PhD Ivanov A., Phd Lilov I.
Mechanisms Mechanisms Gateway To Technology®
My engineering project tipping swarf bin
Outlines : Introduction . Construction . Control .
Graduation project ii: 3-axis cnc milling machine
MECHANICAL ENGINEERING
Multi Stage Engineering
Mechanisms Automation and Robotics VEX
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Steel Tubing: A Flexible Product for a Broad Range of Market Needs
Presentation transcript:

Drilling Rig URB-10-2SH property of

2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method of 3D-simulation with computer strength testing

3 LLC “INNCOR” (innovative constructor developments) is the team of experts – industrial engineers who gained broad experience from Russian military-industrial complexes, and young constructors, well- informed about all the advanced technologies in the sphere of complex equipment developments as well as creating machine building factories. The project of multipurpose drilling rig “Buran” is realized jointly with “GOTEK” Group.

4 Basic ideas put in the concept of the drilling rig “Buran”: Multipurpose; Multipurpose; Production Efficiency; Production Efficiency; Reliability; Reliability;

5 Comparative characteristics of Russian drilling rigs and “Buran”: “Buran” has no analogues in the set of characteristics in the Russian Federation. URB-10-2SH URB-2А-2URB-5АGURB-2MGBU-5PBU-2 τ.max(kg*m) / Q(rot/min) / Winch G(kg) F(kg) D(mm) ,5

6 Structural peculiarities and advantages of the drilling rig “Buran” Lantern pinion drive mechanism for carriage provides: High pull force (10 pf up/down) in combination with high speed movement of the carriage (1,28 m/s); High reliability and operation durability under field conditions; Low load on mast frame in comparison with traditional schemes; Possibility to use built-up or jack- knife mast while maintaining the ability to move rotator along the mast; Simplicity and maintainability; Possibility to use mast bearing frame with locked design, that provides high strength and stiffness of structure. Developed drive mechanism for carriage is the unique construction which has no analogues not only in Russian but elsewhere in the world.

7 Structural peculiarities and advantages of the drilling rig “Buran” Mast: For the fist time designed by the method of complete 3D- simulation with computer strength, stiffness, hardness testing. Result: strong and light design

8 Structural peculiarities and advantages of the drilling rig “Buran” Operational turnover range of rotator’s output shaft enables to realize drilling by different tools, from screw conveyor (diameter 600mm) to diamond tool (max rotary velocity 1700r/min) P(kg) Rotator DownUp ,248 T(kg*m) 10…116,450…56630…348150…1700 V(r/min) 14,634,881U Spindle №2Spindle №1

9 Structural peculiarities and advantages of the drilling rig “Buran” Hydraulic planetary drill winch with free fall: application of planetary reducer in winch drive mechanism raises its durability and control accuracy. Winch Client chooses hydromotor yes Free fall 0,07…1,7 V(m/sec) P(kg) Hydromotor

10 Structural peculiarities and advantages of the drilling rig “Buran” Structural efficiency which exceeds domestic and foreign analogues is the result of carriage’s locked power design usage. Maximum load capacity kg Rotator’s angle of deflection relatively to horizontal axis - 75° Maximum geometrical drilling diameter – 600mm 12m8m8mDepends on client’s needs 0,015…0,3730,053…1,28V(m/sec) 40,311,76U Gear №2 Gear №1 Feed Mast height (from ground to crown block’s axis)

11 Multipurpose drilling rig “Buran” High speed of the carriage – 1,28 m/sec; angle of deflection relatively to horizontal axis 75° Ease and high speed of makeup and breakout operations with rotator’s angle of deflection relatively to horizontal axis 75°; Mast height – up to 12m; Free fall winch – pull force 3 pf. “Buran” easily drills water well with depth up to 250m with great efficiency! Water Well Drilling

12 Multipurpose drilling rig “Buran” Site investigation Torque – 700 kg/m ; Borehole diameter – up to 800 mm; Possibility of directional drilling – mast fixation from 0° to 45°; Static penetration test – bottom hole pressure – 10 pf; Regular carriage movement with min. speed 1 m/min; Possibility to use diamond tool – max. rotator’s turnover 1700 r/min. Drilling rig “Buran” provides highly efficient and safe site investigation.

13 Our service and support: 24 month guarantee; 24 month guarantee; Operating instruction, logbook, complete electronic catalogue of details and units; Operating instruction, logbook, complete electronic catalogue of details and units; After-sales service according to contract; After-sales service according to contract; Emergency repairs – delivery of repair parts and maintenance team support during 72 hours on terms of after-sales contract; Emergency repairs – delivery of repair parts and maintenance team support during 72 hours on terms of after-sales contract; Parts depot. Parts depot.

14 Status Finished design documentation of the prototype; Finished design documentation of the prototype; Signed contracts with suppliers; Signed contracts with suppliers; Scheduled prototype manufacturing; Scheduled prototype manufacturing; Signed contracts with the outsourcing companies; Signed contracts with the outsourcing companies; Preparation for machine-tool attachments finished by Preparation for machine-tool attachments finished by

Thank you for your attention! LLC “INNCOR”