Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.

Slides:



Advertisements
Similar presentations
Superconducting rf test facility STF Mechanical grinding development Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Advertisements

SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
TOC & HPR Data Acquisition SM18 Raul Valera Teruel Rev
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
CAVITY TREATMENT (BCP, HEAT TREATMENT & HPR) Sergio Calatroni with many contributions from: Rama Calaga, Leonel Ferreira, Antonio Mongelluzzo LHC CCEM,
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
Page 1 F. Peauger High Gradient preparation - Team Meeting – CERN – 12/12/07 High Gradient Preparation of a 30 GHz HDS-Thick structure 1.Physical arguments.
LHC vacuum chamber dust High Pressure pure water rinse –Developed at CERN for LEP sputtered SCRF NEG Coating –Most likely must be re-applied Nozzles and.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Hao Guo LINAC Department Institute of Modern Physics.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. CLEAN ROOM SPECIFICATIONS FOR PROJECTS TTC topical workshop on clean.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
OUTCOME OF FIRST CAVITY TESTS With help of T. Junginger, N. Schwerg, K. Liao, P. Maesen, M. Gourragne, A. Benoit, O. Brunner SPL Seminar 2012 at CERN 112/07/2012Mathieu.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Field emission in SRF Cavities
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
Update on the PSB Cooling and Ventilation Systems
Tongming Huang (IHEP) On behalf of the power coupler working group
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
Assembly of Crab Cavities couplers in SM18 clean room
RF-SRF Infrastructure: Operation,Maintenance&Upgrades
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
Cleanroom Upgrade in SM18 Optical Inspection bench
DISCUSSION Flashback Diagram flow Dream world Main points
Operating SRF systems reliably in a “dirty” accelerator
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Mathieu, Gabriel, Max, Spyros, Guillaume
S0 Status report from KEK
Definition of work flow for string DESY Example on critical operation
Acceptance criteria for cleanroom infrastructure
Effort Torwards Improving Large Scale Production for SC Cavities
EZ Infrastructure for SC cavities production
Degradation and possible sources Statistic of resonators
INSTITUTE OF HIGH ENERGY PHYSICS
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1

Reminders: Why ?: – Cleanliness becomes very important for gradient > 20 Mv/m Upgrade based on coupler experts recommendations (March 2010) (1) : – Get the needed infrastructure into one location – Class10 / ISO 4 is a must for gradient >25MV/m – SM18 facility has the best potential for high gradient component manufacturing Visit of CEA-Saclay and DESY cleanroom facilities (1): E. Montesinos, SPL Main power Coupler (SPL-MC) Cleanroom requirements, May 17 th, /11/2010J. Chambrillon - CERN BE/RF2

26/11/2010J. Chambrillon - CERN BE/RF3 Existing facility at SM18 Cleanroom facility RF facilities Magnet Cryogenic

26/11/2010J. Chambrillon - CERN BE/RF4 Existing facility at SM18 Outer working place Personnel access Class Air shower Class 10 Control room Air supplier Baldaquin Class 100 What is missing for high gradient resonators? -High Pressure Rinsing (HPR) -Ultra Pure Water (UPW) -Clean space dedicated to the cleaning operations -Better cleanliness -More space Useful space = 13m×2.10m Magnet equipment storage

26/11/2010J. Chambrillon - CERN BE/RF5 Upgrade proposal Outer working place Personnel access, with air shower Class Class 100 Ionized air shower Class 10 Control room Air supplier Baldaquin 1 Class 100 Baldaquin 1 Class 100 Cleaning & rinsing room Class 100 HPR system UPW production Baldaquin 2 Storage area Class 100 Baldaquin 2 Storage area Class 100 ClassPrice per m² (€) to to 8 000

26/11/2010J. Chambrillon - CERN BE/RF6 Ultra Pure Water (HPW) UPW, new machine with monitoring of the water quality (1,2,3) – Particle counting – Water resistivity (>18 MΩ.cm) – Total organic carbon measurement (TOC < 60 ppb) – Bacteria analysis – Expensive equipment (1): Quality control at the TTF-Cleanroom infrastructure for cavity-processing, N. Krupka, T. Ebeling, K. Escherich, A. Matheisen, Morales Zimmermann, B. Petersen, D. Reschke, N. Steinhau-Kuehl, F. Zhu (2): Clean-room facilities for high gradient resonator preparation, K.Escherich, A.Matheisen, N.Krupka, B.Petersen, M.Schmökel, contribution to the SRF2005, Ithaca, New-York, USA (3): Quality control update of the cleanroom for superconducting multi cell cavities at DESY N. Krupka, K. Escherich, M. Habermann, K. Harries, A. Matheisen, B. Petersen, contribution to the SRF2005, Ithaca, New-York, USA

HPR: nozzle moving through a rotating cavity – Collaboration with DESY (4) is welcome (but XFEL remains priority) – New HPR in Brookhaven and Saclay – Expensive equipment Control done at outlet used as cleanliness indicator: - Water resistivity - TOC measurement - Particle counting (limited by bubbles in water) - Analysis of a filter at water outlet under microscope (2h long by analysis, up to 6 analyss per cavity) 26/11/2010J. Chambrillon - CERN BE/RF7 High Pressure Rinsing (HPR) DESY’s HP rinsing system (4): A new high pressure rinsing system established at DESY, A. Matheisen, K. E scherich, R. B andelmann, H. M. Zimmermann, N. K rupka,DESY

1 st step: Cleanroom upgrade + HPR + UPW => 90% of the total refurbishment cost If we obtain good results with CERN’ HPR on SPL prototype  New HPR can be postponed  1 st step cost drops to 58% of the total refurbishment cost 26/11/2010J. Chambrillon - CERN BE/RF8 Comments:

Developed at KEK/Kyoto (5) : – Study cavity surface defects – In use at DESY (under improvement) 26/11/2010J. Chambrillon - CERN BE/RF9 Optical inspection of cavities Kyoto cavity inspection system (5): Review of optical inspection method and results, K. Watanabe, KEK, Ibaraki, Janpan

EquipmentsComments Air monitoring system / Particle counterControl air quality, online monitoring Temperature & humidity sensorsPermanent control O 2 monitoring systemSurvey of the O 2 level, online monitoring Fog generatorStudy and check air flow movement (6) Ultrasound cleaning bathRemoval of dust Air tight boxes & cabinets Long term storage of clean component, have to be in stainless steel Primary & secondary vacuum pumpsOil free Leak detection systemHe test 26/11/2010J. Chambrillon - CERN BE/RF10 Additional equipment Flow pattern at power coupler port at DESY (argon overlay flow from cavity switched on) (6): Quality control at the TTF-Cleanroom infrastructure for cavity- processing, N. Krupka, T. Ebeling, K. Escherich, A. Matheisen, Morales Zimmermann, B. Petersen, D. Reschke, N. Steinhau-Kuehl, F. Zhu

Acknowledgments: Colleagues from CERN Berry Stéphane, CEA-Saclay Aderhold Sebastian, DESY Schlander Felix, DESY The end Thank you for your attention 26/11/2010J. Chambrillon - CERN BE/RF11

ISO ,1 µm0,2 µm0,3 µm0,5 µmUS FED STD 209E ISO ISO ISO 31, Class 1 ISO 410,0002,3701,020352Class 10 ISO 5100,00023,70010,2003,520Class 100 ISO 61,000,000237,000102,00035,200Class /11/2010J. Chambrillon - CERN BE/RF12 Reminders: Cleaner