F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.

Slides:



Advertisements
Similar presentations
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
Reduced Gun Simulations 1. Comparison 60MV/m Gun vs 50MV/m Gun, Flat Top Laser Pulse 2. Comparison for the worst case: Gun50+Gauss Laser Pulse 3. Summary.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
The Fermilab Photo-Injector Jean-Paul Carneiro (Fermilab & Université Paris XI) For the A0 group (N. Barov, M. Champion, D. Edwards, H. Edwards, J. Fuerst,
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
Transverse emittance Two different techniques were used to measure the transverse emittance. The multislit mask in the injector 9 MeV Quadrupole scan for.
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
Round-to-Flat Beam Transformation and Applications Yine Sun Accelerator System Division Advanced Photon Source Argonne Nation Lab. International Workshop.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Michael Röhrs On-crest slice emittance measurements Michael Roehrs.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Round-to-Flat Beam Transformation and Applications
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
X-band Based FEL proposal
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
Injector Cyclotron for a Medical FFAG
Have a chance to operate your own beam at CERN
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Junji Urakawa (KEK) for ATF International Collaboration
Damping Ring Kicker Tests at AØ
MIT Compact X-ray Source
Intra-Pulse Beam-Beam Scans at the NLC IP
Electron Source Configuration
Injector: What is needed to improve the beam quality?
Center for Injectors and Sources
Simulation Calculations
Injector Topics for Discussion
Test of Booster at UITF Reza Kazimi (12/12/18)
Simulations for the LCLS Photo-Injector C
Coupler Effects in High Energy Part of XFEL Linac
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Update on ERL Cooler Design Studies
Fast kicker beam dynamics simulations
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

f Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May 31, 2007

f S. Nagaitsev 2 NML injector layout 1 – Gun cavity, 2 – Coaxial rf coupler, 3 – dark current kicker and air-core steerers, 4 – laser mirror cross, 5 – current monitor & BPM, 6 - collimator, 7 – Tesla cavity (CC1), 8 – Tesla cavity (CC2) Dimensions: Cathode to kicker(mid. point ): ~ 750 mm Kicker (flange to flange): 300 mm Kicker (mid. point) to collimator: ~ 800 mm

f Kicker functions 1.Dark current removal 2.Fast beam inhibit  A fast kicker is combined with a dc air-core steering coil, which normally deflects the beam vertically down onto a collimator. The kicker pulse allows to pass the bunch through the hole in the collimator. S. Nagaitsev 3 Steerer, no kick Beam Collimator Steerer with kick BeamCollimator 20 mrad 1.6 cm

f Beam parameters at the kicker (mid. point)  For a 3.2 nC bunch  Beam energy: pc = 5 MeV  Emittance (norm, rms): 6 µm  Beam size: ~3 mm  Uncorrelated beam angular spread: 0.2 mrad S. Nagaitsev 4

f Injector simulation by P. Piot S. Nagaitsev 5 Kicker location

f Steerer  The steerer needs to deflect a 5-MeV/c beam by 40 mrad (max), 20 mrad (nominal)  Coil length: 20 cm  B = 35 G  Pulse-to-pulse stability (rms): better than 0.1% S. Nagaitsev 6

f Kicker (prelim.)  Strip-line geometry  Dist btw plates: 35 mm  Effective length: 250 mm S. Nagaitsev 7

f  Analytic (2-d) approximation for a stripline kicker Deflection angle S. Nagaitsev 8 φ b +V -V k is the geometry factor, depends on b and φ; ~1-1.2 for our geometry. For L = 25 cm, b = 17.5 mm and θ = 20 mrad, the voltage ampl. is V = 3 kV Pulse-to-pulse stability required (rms): 0.1%

f Timing and Flattop Requirements  Flattop width: 40 ps or more  Flattop variation: < ± 0.6% over ± 20 psec for emittance growth < 10%  Rate: 3 MHz  Number of pulses in a macropulse: up to 3000  Macropulse rate: 5 Hz S. Nagaitsev 9

f Calculation of Attenuation of Dark Current by Kicker and Collimator S. Nagaitsev 10 RF phase (deg) Time distribution of dark current at the photocathode (yellow curve)

f Transverse Wake from a Round Collimator S. Nagaitsev cm dia: peak wake = 750 V/pC/m 1.2 cm dia: peak wake = 520 V/pC/m 1.4 cm dia: peak wake = 370 V/pC/m 1.6 cm dia: peak wake = 270 V/pC/m 1.8 cm dia: peak wake = 200 V/pc/m 2.0 cm dia: peak wake = 160 V/pC/m Calculated with program ABCI Requirement: Limit transverse jitter of downstream beam to <.1  y    jitter <20  rad. Using average wake field ~ ½ peak wake field; Q=3.2 nC; P=4.7 MeV/c 2 cm dia. collimator: amplifies kicker jitter by 4%; collimator position must be stable to < 370  m 1 cm dia. collimator: amplifies kicker jitter by 20%; collimator position must be stable to < 80  m Requirement: Limit emittance blowup of downstream beam to < 10%. emittance increase from offset collimator adds in quadrature with initial emittance  collimator should be centered on beam to within 1 mm (for 1 cm dia. collimator) Beam travelling off-center through a round collimator (iris), will experience a transverse kick due to the wake field. Position jitter at the collimator due to kicker jitter will be amplified by the collimator.