Earned Value Management Guidelines Tony Finefield Finefield Consulting 714-642-8795 CPM Webinar 5 September 2012 1.

Slides:



Advertisements
Similar presentations
The Topics that will be addressed in this Module include:
Advertisements

Module 8: Government Required Reports
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
1 Copyright 2007 blueVisions Management Pty Ltd Project Performance Measurement Approach In Road Construction Industry Using EVPM
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Dr. L. K. Gaafar The American University in Cairo
BlueVisoins Management Pty Ltd
Chapter 10: Monitoring and Controlling Change
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Earned Value Management (EVM) Fundamentals
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
FASTER DECISIONS. BETTER DECISIONS.  PRICE S YSTEMS LLC Earned Value Concepts Course.
Princeton University Plasma Physics Laboratory EVMS Certification Review EVMS Implementation on NSTX-U Steve Langish October 4 - 6, 2011.
Dave Bachman DAU / CDSC September 9, 2004
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
1 Cost Benefit EVM at DOT Presented to: Joint Industry – Government NDIA PMSC session Presented by: H. Giovanni Carnaroli Associate CIO, IT Policy Oversight.
1 Program Management Systems Committee Joint Industry/Government Meeting May 21, 2009 EVM for Service Contracts Working Group.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Better Control of Cost and Schedule Variance through Earned Value Management.
Management & Development of Complex Projects Course Code - 706
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
NDIA Program Management Systems Committee APM Reciprocity Agreement GEIA Engineering Bulletin Progress Report August 21, 2004 Walt Berkey, Lockheed Martin.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Internal Information Services Risk Management Working Group Gay Infanti Northrop Grumman 15 August 2006.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
Management & Development of Complex Projects Course Code - 706
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
EVM at Missile Defense Agency Dave Melton Presented to NDIA PMSC 26 April 07.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Understanding Earned Value Management & Analysis Abba Consulting Federal Acquisition Conference & Exposition Washington, DC June 19-20, 2007 Wayne Abba.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. March 19, 2008.
E ARNED V ALUE M ANAGEMENT ‘G OLD C ARD ’ Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
Performance Measurement Baseline Contract Price (Project Price)
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Performance Measurement Baseline Contract Price (Project Price)
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
Progress and Performance Measurement and Evaluation
Dave Bachman DAU / CDSC September 9, 2004
EVM 202—Lesson 3 EVMS Guidelines and Compliance
LSST Project EVMS Performance Overview Kevin E
BlueVisoins Management Pty Ltd
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
NDIA Earned Value Management Application Guide
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September

Overview Conference Presentation Description Webinar Approach – Creating the Plan – Evaluating the Estimated Costs – Effect of Changes – Summary Questions

Conference Presentation Description CPM 100C and 100D presented at the CPM Spring Conference and the IPM Conference 2 Sessions of 1.25 hours each Covers all 32 Guidelines individually Examples of implementation results covered Based on: – ANSI/EIA 748-B – NDIA Intent Guide – Personal Experience

Webinar Approach Creating the Plan: a discussion of the Organization and Planning, Scheduling and Budgeting Sections of the Guidelines. Evaluating the Estimated Costs: a discussion of the Accounting Considerations and the Analysis and Management Reports Sections. Effect of Changes: reviewing the guidelines for Revisions and Data Management

Creating the Plan CPM Webinar 5 September 2012

3 SUBSYSTEM INTEGRATION 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ Creating the Plan Boxes are color-coded by guideline section. Define all authorized work; normally, use a WBS. Define the project organization. Integrate the WBS/OBS to create management control points. Integrate subsidiary processes. Schedule with network logic. Budget by elements of cost. Create work and planning packages within the control account. Plan appropriate effort as LOE. Set progress measurement techniques. Sum WP and PP budgets to the CA total. Identify Undistributed Budgets. Set overhead budgets. Establish the PMB/CBB. Identify Management Reserve. Reconcile the CBB to the project target. Identify Overhead Management. ORGANIZATIONPLNG., SKED. & BUDGTACCOUNTINGANALYSIS & EACINDIRECT REVISIONS Integrate Scope, Schedule & Resources.

Estimating the Costs CPM Webinar 5 September 2012

3 SUBSYSTEM INTEGRATION 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS Estimating the Costs Record Direct Costs.Record Direct Costs for Material.Summarize Direct Costs by WBS element.Summarize Direct Costs by OBS element.Record/allocate Indirect Costs.Calculate SV and CV Monthly.Identify significant variances for analysis and action.Summarize information for management.Implement approved corrective actions.Analyze indirect cost performance.Create/modify estimates at completion as needed.Identify unit/lot costs, recurring/non-recurring. If required. ORGANIZATIONPLNG., SKED. & BUDGTACCOUNTINGANALYSIS & EACINDIRECT REVISIONS Summarization based on RAM intersections.Charge # structure supports both summarizations

Effects of Changes CPM Webinar 5 September 2012

3 SUBSYSTEM INTEGRATION 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS 28 Contract Changes 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ Incorporating Changes

3 SUBSYSTEM INTEGRATION 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ 28 Internal Replanning Incorporating Changes

3 SUBSYSTEM INTEGRATION 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C THE PLAN: PM $$$ REALITY: REAL $$$ 20 UNIT/LOT COSTS 29 Budget Reconciliation Reconciliation of Budgets

3 SUBSYSTEM INTEGRATION 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS 30 Retroactive Data Changes 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ Controlling Retroactive Changes

3 SUBSYSTEM INTEGRATION 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS 31 Control Unauthorized Changes 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ Controlling the CBB Value

3 SUBSYSTEM INTEGRATION 27 EAC 26 MGT ACT 25 ANL SUM 23 VA ANL 22 VAs CAL 24 IND ANL 19 IND COST 17 WBS SUM 18 OBS SUM 16 D/C 21 MTL D/C REALITY: REAL $$$ 20 UNIT/LOT COSTS 15 CBB 8 PMB 4 IM 5 RAM 2 OBS 1 WBS 11 CA SUM 7 EVT 12 LOE 10 WP/ PP 9 WB/A 6 SKED 14 MR 14 UB 13 IB THE PLAN: PM $$$ 32 Document PMB Changes Update Baseline Documentation

Summary ANSI/EIA Standard 748 Earned Value Management Systems (latest version): Contains the 32 Guidelines which form the framework of an EV based management control system –Establishes maximum flexibility for EVMS Implementation –Defines minimal restrictions for baseline control –Focuses on minimal implementation requirements –Is recognized as an industry “best practice” –The 32 guidelines are recognized by U.S. Government and its Agencies/organizations as the standard for EVM –Is the guiding document for the EVM Guidelines Intent Guide prepared by NDIA Provides minimal implementation guidance –NDIA Intent Guide contains expanded implementation guidance –Other NDIA Guides provide insight into surveillance, IBRs, System Acceptance Processes and Scheduling.

Next Steps Claim your PDU for this session: PDU activity number is Provider: REP3646 Register for the Integrated Program Management Conference: Registration open for IPM Conference and Conference Hotel IPM ConferenceConference Hotel The premier conference on Earned Value Management (EVM) "Setting the Baseline“ October 29-31, 2012 * Bethesda North Marriott Hotel & Conference Center * Call or and ask for IPM Conference Rate Earn 18 PDUs at the conference Don't miss great keynote speakers.