1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.

Slides:



Advertisements
Similar presentations
Topics to be Covered 1. Material Requirement Planning
Advertisements

Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
MRP and Related Concepts
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
MRP, MRP II, and ERP.
 You should be able to: 1. Describe the conditions under which MRP is most appropriate 2. Describe the inputs, outputs, and nature of MRP processing 3.
Chapter 12 MRP and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Adeyl Khan, Faculty, BBA, NSU. Material requirements planning (MRP)  Computer-based information system that translates master schedule requirements for.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
MRP.
Material Requirements Planning
CHAPTER 12 MRP and ERP H.W.: 2,6,8, and 17..
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 15.
Materials Requirements Planning
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 14 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Facility Inventory Old Facilities Modern Facilities Classroom Size
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
Chapter 12 MRP and ERP McGraw-Hill/Irwin
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Production and Operations Management
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

1 Chapter 15 MRP and ERP

2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant Demand Time Indep. Demand Dep. Demand Stable demand “Lumpy” demand Amount on hand Safety stock

3 Material requirements planning (MRP): Computer- based information system for ordering and scheduling of dependent demand inventories It is a production planning process that starts from the demand for finished products (independent demand) and plans the production step by step of subassemblies and parts (dependent demand). MRP

4 MRP InputsMRP ProcessingMRP Outputs Master schedule Bill of materials Inventory records MRP computer programs Changes Order releases Planned-order schedules Exception reports Planning reports Performance- control reports Inventory transaction Primary reports Secondary reports

5 Master Production Schedule: MPS Time-phased plan specifying timing and quantity of production for each end item. MPS comes from sales and marketing MPS covers about 1-3 months into the future –Must cover cumulative lead time Cumulative lead time: The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly. –From Now until Cumulative lead time plans are generally frozen Sometimes MPS is capacity filtered MRP Inputs: 1. MPS

6 Planning Horizon and Cumulative Lead Time Procurement Fabrication Subassembly Assembly

7 MRP inputs: 2. BOM Bill of materials (BOM): A listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product. Product structure tree: Visual depiction of the requirements in a bill of materials, where all components are listed by levels. Most often people do not use the term product structure tree. Instead use BOM to mean the product structure tree.

8 Product Structure Tree Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level

9 Explosion Example How many leg assemblies are needed for 1 chair? How many Cross bars are needed for 5 chairs? Computing how many parts are required per a final product is called BOM explosion. MRP answers these questions in view of production lead times: Not only it tells how many, but also when.

10 Assembly Time Chart Procurement of raw material D Procurement of raw material F Procurement of part C Procurement of part H Procurement of raw material I Fabrication of part G Fabrication of part E Subassembly A Subassembly B Final assembly and inspection Days

11 MRP input: 3. Inventory levels Beginning inventory on hand Scheduled receipts –Pipeline inventory not received yet but it is in the process of coming to the inventory. We know when this will be available for use.

12 MRP Processing Gross requirements: (Forecasted)Demand period by period Net requirements(t) =Gross requirements(t)-Projected inventory(t-1) -Scheduled receipt(t) If Net requirement(t) > 0 set Planned order receipts(t)>=Net requirement(t) Planned-order receipts is the production planned Projected inventory(t) =Projected inventory(t-1)+Scheduled receipt(t) +Planned order receipts(t)-Gross requirements(t) Planned order release(t-LT)=Planned-order receipts(t)

13 MRP example with LT=2 Periods0123 Gross requirements6117 Scheduled receipts230 Projected on hand10600 Net requirements027 Planned order receipts27 Planned order releases27 Inputs Outputs

14 Other Considerations Safety Stock –Not much for items with dependent demand Lot sizing –Lot-for-lot ordering –Economic order quantity –Fixed-period ordering –Part-period model

15 MRP example with Lot size=5 and LT=2 Periods0123 Gross requirements6119 Scheduled receipts230 Projected on hand10634 Net requirements 510 Planned order receipts510 Planned order releases510 Inputs Outputs

16 MRP updates Regenerative MRP –Do the planning from scratch –Time between regenerations is long –Ok for stable environments Net Change MRP –Update the plan according to changes

17 MRP Outputs Planned orders - schedule indicating the amount and timing of future orders. Order releases - Authorization for the execution of planned orders. Changes - revisions of due dates or order quantities, or cancellations of orders. Performance-control reports Planning reports Exception reports

18 Capacity Planning Capacity requirements planning: The process of determining short-range capacity requirements. Load reports: Department or work center reports that compare known and expected future capacity requirements with projected capacity availability. Time fences: Series of time intervals during which order changes are allowed or restricted.

19 MRP Planning Develop a tentative master production schedule Use MRP to simulate material requirements Convert material requirements to resource requirements Firm up a portion of the MPS Is shop capacity adequate? Can capacity be changed to meet requirements Revise tentative master production schedule Change capacity Yes No Yes No

20 Food catering service –End items are the catered food –Dependent demands are ingredients for each recipe, i.e. bill of materials Taco Bell menu items Hotel renovation –Activities and materials “exploded” into component parts MRP in Services

21 Benefits of MRP Low levels of in-process inventories Ability to track material requirements Ability to evaluate capacity requirements Means of allocating production time Eventually it is a database with limited decision making capability

22 Requirements of MRP Computer and necessary software Accurate and up-to-date inputs: –Master schedules –Bills of materials –Inventory records Integrity of data

23 Expanded MRP with and emphasis placed on integration –Financial planning –Marketing –Engineering –Purchasing –Manufacturing MRP II

24 Market Demand Production plan Problems? Rough-cut capacity planning Yes No Yes No Finance Marketing Manufacturing Adjust production plan Master production schedule MRP Capacity planning Problems? Requirements schedules Adjust master schedule MRP II

25 Enterprise resource planning (ERP): An expanded effort to integrate standardized record-keeping that will permit information sharing throughout the organization ERP