NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO 2017-18 For The Quarter Ending Dec.2012 PLANNING POWER.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

National Grid Local System Plan 2009 LSP Presentation Related Questions and Answers.
FUTURE NTDC PROJECTS UPTO
Monthly Progress Report on NTDC Development Projects for May, 2013
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
NTDC Projects for which Financing is Required
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Brief on HVDC 2015 Brief on HVDC 2015
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
FUTURE NTDC PROJECTS UPTO
Quarterly Report on NTDC Development Projects
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Preliminary Studies of the Electric Power Distribution for CLIC
ELG4125 Transmission and Distribution Systems
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
Pakistan Italy Debt for Development Swap (PIDSA) Italian-Pakistani Development Cooperation.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
APPLIED ELECTRICITY SS3
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Iraqi kordistan Region Iraqi kordistan Region Click Click Back Iraq Map.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Block Diagram of a Typical Electric Supply System
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
Sub Station.
Presented by : Er.Suneel Grover
“Electricity Supply Reliability Project - Additional Financing”
Presented by : Er.Suneel Grover
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Presented by : Er.Suneel Grover
the high-voltage network of CERN ToMORROW
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
ENCLAVE POWER COMPANY LIMITED
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER January, 2013

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP 1

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 2 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=98PKR Financing Expected Completion (MRS)MUS ($) 1- *Replacement of depleted material at existing grid stations of NTDC system Replacement of obsolete/depleted equipment at 24 No. 500 & 220 kV grid stations ADB Tranche- III Extension/Augmentation of 500/220kV Rewat substation Extension of 1x250 MVA T/F 9409 Proposed in ADB Tranche- III Augmentation of 2x160 MVA 220/132kV T/F to 2x250MVA T/F 3- 2 nd Source of supply to 220 kV GIS Islamabad University. In/out of 220 kV Manshera- Sangjani S/C at Islamabad University (40 km) Proposed in ADB Tranche- IV kV Mirpur Khas 220kV sub station with 2x250 MVA T/Fs and allied equipment Proposed in ADB Tranche- IV In/Out of 220kV Hala Road- T.M.Khan Road D/C T/L at Mirpur Khas New (70km) *PC-I was submitted to BOD NTDC on for approval

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 3 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=98PKR Financing Expected Completion (MRS)MUS ($) 5- 2 nd Source of supply to 220 kV Hala Road Grid Station 220 kV D/C T/L from T.M Khan Road to Hala Road (10 km) 3003 Proposed in ADB Tranche- IV kV Gharo 220 kV sub station with 2x250 MVA T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Jhimpir to Gharo (70km) kV Jhimpir 220kV substation with 2x250 MVA T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Jhimpir to T.M Khan Road (60 km) 8- Replacement of old lines for 220 kV Burhan 220 kV D/C T/L from Tarbela to Burhan on Rail conductor (35 km) Proposed in ADB Tranche- IV

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 4 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=98PKR Financing Expected Completion (MRS)MUS ($) 9- Reconductoring of 220kV Tarbela-ISPR Transmission Line Reconductoring of 220 kV Tarbela- ISPR D/C T/L on Rail conductor (62.5 km) Proposed in ADB Tranche- IV kV Chakwal 220kV sub station with 2x160MVA T/Fs and allied equipment Proposed in ADB Tranche- IV In/out of 220 kV Mangla-Rewat S/C at Chakwal (60 km) kV Mastung 220kV sub station with 2x250MVA T/Fs and allied equipment Proposed in ADB Tranche- IV kV D/C T/L from Mastung to Sibbi (120 km)

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER NTDC Future Projects Where Financing Has Been Lined Up 5 Sr. No. Name of the ProjectsScope of work Estimated Cost 1US$=98PKR Financing Expected Completion (MRS)MUS ($) kV Chakdara 220kV sub station with 2x250MVA T/Fs and allied equipment Proposed in ADB Tranche- IV In/Out of 220kV Shahi Bagh- Mardan S/C at Chakdara (85km) Total

6 NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 7 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=98PKR Expected Completion (MRS)MUS ($) kV GIS Shadman 2x kV D/C cable from Shadman to Bund Road (30km) kV Islamabad West 2x750 In/Out of 500 kV Tarbela – Rewat S/C at Islamabad West (40+40km) In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad West (50+50 km) 2x250 In/Out of 220 kV Burhan–ISPR S/C at Islamabad West (15km) In/Out of 220 kV Mansehra/Islamabad University– ISPR D/C at Islamabad West (10km) NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 8 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=98PKR Expected Completion (MRS)MUS ($) kV Faisalabad West 2x kV D/C T/L for In/Out of 500 kV M.Garh – Gatti S/C at Faisalabad West (2km) kV D/C T/L for In/Out of 500 kV Multan-Gatti S/C at Faisalabad West (45 km) 2x kV D/C T/L from Faisalabad West to T.T.Singh (70km) 220kV D/C T/L from Faisalabad West to Lalian New (80km) kV M-3 Industrial Estate Faisalabad 2x kV M3 Industrial Estate– Faisalabad New (70 km) In/Out of 220 kV Faisalabad West-M3 Industrial Estate at 220 kV Chinot Industrial (30 km) NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER 9 Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost 1US$=98PKR Expected Commissioning (MRS)MUS ($) kV Jamrud2x kV D/C T/L from Peshawar to Jamrud (10 km) kV Peshawar New 2x750 In/out of 500kV Tarbela – Peshawar at Peshawar New (2+2km) In/Out of 220kV Peshawar- Shahibagh S/C at Peshawar New (5km) kV Kohat2x kV D/C T/L from Kohat to Peshawar New (50 km) kV D/C T/L from Kohat to Bannu (150 km) Total NTDC Future Projects For Which Financing Is Required

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Report Prepared by:DesignationContact No. Maqsood Ahmad Qureshi Additional Manager Projects Planning Fahmeeda ShafiDy. Manager Projects Planning