BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.

Slides:



Advertisements
Similar presentations
Experimental Internet Resource Allocations Philip Smith, Geoff Huston September 2002.
Advertisements

AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
State of play of National Action Plans in the EU Member States and PAN Europe activities « Sick of Pesticides » Workshop Tuesday, 30 November 2010, Brussels.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Auditing, Assurance and Governance in Local Government
Extension of Duration Applications Compliance with the EPA Code of Practice 2009 – Waste Water Treatment Systems Serving Single Houses (p.e. ≤)
Prepared and presented by Paul French AJA Registrars Operations Director AJA are a multi-accredited International Certification Body based in Portishead.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
LIHTC Compliance Real Estate Development and Tax Credit Finance 101 Conference July 29, 2014.
By Law Offices of Wayne D. Gerhold One Gateway Center, 18 th Floor Pittsburgh, PA (412)
Connecticut’s Transfer Act: Don’t Let It Derail Your Business Succession Plan Gregory A. Sharp, Esq | October 5, 2010.
PROSPECTUS AND COMMENCEMENT OF BUSINESS
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
1 Water Services Planning J.McGowan Senior Engineer May 2014 Kildare County Council Water Services.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
Implementing Human Service Worker Safety Regulations
AUDITS AND INSPECTIONS
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Development (Impact) Fee Program Changes to Comply with State Law Mayor and Council Study Session June 3, 2014.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
1 Licensing Scheme for Drug Dependent Persons Treatment and Rehabilitation Centres.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
Leading the way; making a difference Latin American Panel November 6, 2013 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Online Learning 1 Marine Facility Personnel with Security Responsibilities Canaport LNG
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Energy surveying qualifications and procedures West Midlands Housing and Energy Conference 2007.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
RESPRO Area 1C Area 1C RESPRO Meeting RESPRO Area 1C November 24, 2009.
© Siemens AG 2014 Alle Rechte vorbehalten.siemens.com/lowvoltage New Legislative Framework (NLF) Sektor Infrastructure & Cities | Division Low and Medium.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
1 Status of PSC recommendations (January December 2007) Portfolio Committee on Public Service and Administration 14 March 2008.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Regulation 13 Transitional Provisions Presentation in conjunction with GRRF which has been updated to ECE/TRANS/WP29/GRRF/2014/7 Prepared by the.
Grid Operations Centre LCG SLAs and Site Audits Trevor Daniels, John Gordon GDB 8 Mar 2004.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
INTERTANKO LATIN AMERICAN PANEL MARITIME SECURITY: LATEST DEVELOPMENTS LATEST DEVELOPMENTS AT IMO JOSEPH J. ANGELO DIRECTOR, REGULATORY AFFAIRS AND THE.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Briefing to the Portfolio Committee on Police 21 August
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
INTRODUCING CIL AND DEALING WITH SCHEME SPECIFIC VIABILITY ISSUES – BRISTOL’S APPROACH Jim Cliffe Planning Obligations Manager Bristol City Council.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
1 Section 106: What they are and where we are DARREN WILDING DCLG.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Community Infrastructure Levy The fundamentals. Response to questions.
Title Slide Los Banos Unified School District Presented by Lori Raineri February 24, 2005 Moving Forward with Funding Community Facilities District No.
Orange County Government Adoption Public Hearing May 10, 2016 Board of County Commissioners School Impact Fee Update.
Juvenile Legislative Update 2013 Confidentiality of Records and Interagency Sharing of Educational Records.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
Senior Executive Planner
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Tracking Progress for Building Efficiency Accelerator
Amendments to the Building Control Regulations S.I. No.9 of 2014
Engineering Waiver Management
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Effective Building Control System
City Council Meeting August 27, 2018
How to conduct Effective Stage-1 Audit
Insurance, Liability and Indemnity issues for Assigned Certifiers
The assigned certifier conference 2019
City Council Meeting November 14, 2016
Experimental Internet Resource Allocations
Accessory Dwelling Units: Maximum Unit Size and Residential Impact Fee
ANCILLARY CERTIFICATION UNDER BC(A)R
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

BUILDING AND DEVELOPMENT CONTROL Willie Hannigan

Building Control Regulations New regulations cite the developments that require additional documentation to be provided along with Commencement Notice. The new certification is required for: (a)the design and construction of a new dwelling. (b)an extension to a dwelling involving a total floor area greater than 40 square metres. (c)Works to which Part III applies (require a Fire Safety Certificate).

Building Control Regulations A review of the application of the building control regulations in relation to one off houses and domestic extensions is currently ongoing. Advisory rather than Mandatory Broaden the pool of professionals who may sign certificates Type of extensions that may be exempt

Building Control Regulations Commencement Notice to be accompanied by 1.such plans, calculations, specifications and particulars as are necessary to outline how the proposed works or building will comply with the requirements of the Second Schedule to the Building Regulations relevant to the works or building concerned and including – general arrangement drawings including plans, sections and elevations. a schedule of such plans, calculations, specifications and particulars as are currently designed or as are to be prepared at a later date. the completion of an online assessment, via the Building Control Management System, of the proposed approach to compliance with the requirements of the Second Schedule to the Building Regulations. the preliminary Inspection Plan prepared by the Assigned Certifier.

Building Control Regulations Commencement Notice to be accompanied by 2. The following certificates and notices in the appropriate forms set out in the Second Schedule— Certificate of Compliance (Design). Notice of Assignment of Person to Inspect and Certify Works (Assigned Certifier). Certificate of Compliance (Undertaking by Assigned Certifier). Notice of Assignment of Builder. Certificate of Compliance (Undertaking by Builder). 3.The appropriate fee.

Building Control Regulations Certificate of Compliance on Completion Required for: a)the design and construction of a new dwelling. b)an extension to a dwelling involving a total floor area greater than 40 square metres. c)Works to which Part III applies (require a Fire Safety Certificate). A Certificate of Compliance on Completion shall be— (a) in the form specified for that purpose in the Sixth Schedule of S.I. 9 OF 2014

Building Control Regulations Certificate of Compliance on Completion (b) accompanied by such plans, calculations, specifications and particulars as are necessary to outline how the works or building as completed— (i) differs from the plans, calculations, specifications and particulars submitted with the Certificate of Compliance (Design)(to be listed and included at the Annex to the Certificate of Compliance on Completion), and (ii) complies with the requirements of the Second Schedule to the Building Regulations, and (c) accompanied by the Inspection Plan as implemented by the Assigned Certifier in accordance with the Code of Practice

Building Control Regulations

Taking in charge Update on tic process: 9 Irish Water (IW) had, since it was established in January 2014, indicated that they would not be in a position to take private residential estates in charge until there was a protocol for doing so in place. As a result, no estates were taken in charge in 2014 In November 2014, The DoEC&LG issued a circular (5/2014) which provided clarity on how the tic process should proceed in conjunction with IW. In February IW agreed a Memorandum of Understanding for the taking in charge of estates connected to the IW network

Taking in charge Update on tic process: 10 On the basis of this documents, Kildare County Council advertised the taking in charge of 38 private housing developments throughout the County in February The Council has entered into a consultation process with Irish Water in relation to the taking in charge of the water services infrastructure elements of these developments. It is hoped to bring most if not all of these estates to the relevant M.D. for taking in charge by the end of July 2015

Taking in charge Update on tic process: 11 In our recent discussions with IW, the issue of the taking in charge of developments that commenced since 1/1/2014 was raised. They have indicated that for the time being, there will be no change in the current process and that KCC staff will still monitor water services infrastructure with a view to taking them in charge when completed to an acceptable standard. Building and Development Control staff will advise Agents of any future documentary requirements that IW may have for taking estates in charge. These will also be addressed in a review of Kildare County Council's Taking in Charge Policy.