1 3. Process Flow Measures Assignment, Problem 1 Solution 1. Bank XYZ receives 20 loan requests per hour on average. Each loan request goes through an.

Slides:



Advertisements
Similar presentations
Problem1; Admission Flow
Advertisements

Auto-Moto Financial Services- The Old Process
Recruiting, selecting and training for success
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
TMK Agent training only. Not for sales use. Worksite TMK Agent training only. Not for sales use.
Unit 5 Financial Literacy Read each definition carefully and become familiar with it as we will use the words in class as part of our discussions through.
OPERATIONAL BUDGETING
1 Term Project – Call Center Operations SOM 686, Fall 2006 Darren Mitchell Hayden Gilbert Serge Suprun.
OPSM 301 Operations Management
 Complement: Needed Complement is the number of workers required to fill the production schedule without overtime.  Caliber: You can recruit a higher.
Financial Mathematics I Week 8. Start on stage 3 of final project. –Paper copy is due week 10 (include all stages, including before and after revisions).
Waiting Lines Example-1
1 3. Process Flow Measures MBPF Inc.: Consolidated Income Statement.
Old Colony Trust Co. v. Commissioner 279 U.S. 716 (1929)
1 Review Topics 1.Process Discovery 2.Process Optimization 3.Process Analysis.
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
HYPOTHESIS TESTS ABOUT THE MEAN AND PROPORTION
1 3. Process Flow Measures Process Flow Analysis-Basics 1 Ardavan Asef-Vaziri June/2011 Five Elements of the Process View Inputs Outputs Goods Services.
OPSM 501: Operations Management Week 3: Process measurement Little’s Law The House Building Game Koç University Graduate School of Business MBA Program.
1 3. Process Flow Measures Assignment, Problem 1 Solution 1. Bank XYZ receives 20 loan requests per hour on average. Each loan request goes through an.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
The Essence of Process Flow Process Measures
ECEN Winter 2015 Product Development Economics.
The Essence of Process Flow Process Measures
Focus Questions In what setting do employers usually make hiring decisions? What are three things you should do to get ready for a job interview? What.
HAWKES LEARNING Students Count. Success Matters. Copyright © 2015 by Hawkes Learning/Quant Systems, Inc. All rights reserved. Section 9.2 Understanding.
Company LOGO Essential Standard 2.00 Understand business organization and management. 1.
HR Planning MANA 4328 Dr. George Benson
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Salary vs. Hourly Wage What is a Salary? What is an Hourly Wage? Is it the same in all states?
A percentage change is a way to express a change between the old value and the new one (which is the extent to which something gains or loses value.)
7-1 Copyright  2002 by Harcourt, Inc. All rights reserved. CHAPTER 7: USING CONSUMER LOANS Clip Art  2001 Microsoft Corporation. All rights reserved.
OPSM 301 Operations Management Class 2: Business process flows: Measurement Koç University Zeynep Aksin
MONEY DEMAND, THE EQUILIBRIUM INTEREST RATE, AND MONETARY POLICY Chapter 23 1.
Amendments to the Work Permit Rules: Problematic Issues Alex Nisengolts 28 April 2011.
Microeconomics and Macroeconomics FCS 3450 Fall 2015 Unit 2.
Spending Chapter 4. Consumer Spending Questions: Based on the pie chart from slide 2, what percentage of consumer spending is made up of housing-related.
1 Short Sale Basics Realtors Edition We save homes one at a time. ”
Solved Problem An inspection station for assembling printers receives 40 printers/hour and has two inspectors, each of whom can inspect 30 printers per.
Differential Cost Analysis
When you have completed your study of this chapter, you will be able to C H A P T E R C H E C K L I S T Define GDP and explain why the value of production,
Employer Insurance Solutions Presents: A way for Employers to provide Low Cost Benefits and Services for Employees at NO COST TO THE EMPLOYER!!
Section 10.5 Types of Errors HAWKES LEARNING SYSTEMS math courseware specialists Copyright © 2008 by Hawkes Learning Systems/Quant Systems, Inc. All rights.
Essential Standard 2.00 Understand business organization and management. 1.
Future Value of Investments
Bellwork 1.What are the three functions of money? 2.What is the purpose of the Federal Deposit Insurance Corporation? 3.When was the Federal Reserve System.
1 3. Process Flow Measures 1. Coffee Shop You enter a Starbucks coffee shop. You have experienced that in this time of day the entrance door opens two.
Yandell – Econ 216 Chap 16-1 Chapter 16 Time-Series Forecasting.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Bank Management & Financial Services BF465
Managing Business Finances
APRs, EARs, APYs, and practice problems
7.6.7 Simple Interest.
Why schedules are important
BUS 310 STUDY Future Starts Here/bus310study.com
Cost & Management Accounting Dr. Aravind Banakar –
Cost & Management Accounting
Cost & Management Accounting
Capital Budgeting and Cost Analysis
BUS 310 STUDY Lessons in Excellence-- bus310study.com.
BUS 310 STUDY Perfect Education/ bus310study.com.
Section 5-4 Employee Benefits
Every minutes one customer comes in and one customer leaves.
HR Metrics 2: Staffing Metrics
Best Practice Speed Sharing
What are the benefits of a job in addition to pay?
Another Example Consider a very popular computer game played by millions of people all over the world. The average score of the game is known to be
Saving you Millions of Wasted Dollars and Thousand of Work Weeks of Wasted Time Tim Owens.
Mathematical Explorations
Chapter 6: Human Resources
Presentation transcript:

1 3. Process Flow Measures Assignment, Problem 1 Solution 1. Bank XYZ receives 20 loan requests per hour on average. Each loan request goes through an initial processing stage, after which an “accept or reject” decision is made. Approximately 80% of the loans are accepted, and these require additional processing. Rejected loans require no additional processing. Suppose that on average 5 loans are in the initial processing stage, and 25 (accepted) loans are in the additional processing stage. 5 Reject Accept 80% 20% 20 25

2 3. Process Flow Measures Assignment, Problem 1 Solution a) What is the average processing time required for a loan request? R = 20 loans/hour I = 5+25 = 30 loans Average processing time = Throughput Time RT= I  T = I/R = 30/20 = 1.5 hours b) What is the average processing time required for a rejected loan? R = 20 loans/hour I = 5 loans Average processing time = Throughput Time RT= I  T = I/R = 5/20 = 0.25 hours

3 3. Process Flow Measures Assignment, Problem 1 Solution c) What is the average processing time required for an accepted loan (including the initial processing stage)? Initial Stage: As computed for rejected applications the time for the initial process is T = I/R = 5/20 = 0.25 hours Additional Processing Stage: R = 20 × 0.8 = 16 loans/hour, I = 25 loans T = I/R = 25/16 = Average Total Processing Time = = = hours

4 3. Process Flow Measures Assignment, Problem 2 Solution 2. A call center employs 1000 agents. Every month 50 employees leave the company and 50 new employees are hired Agents 50/month a) How long on average does an agent work for this call center? R = 50 people/month I = 1000 people Average working time = Throughput Time = I/R = 1000/50 = 20 months or 20/12 = 1.67 years

5 3. Process Flow Measures Assignment, Problem 2 Solution Suppose the cost of hiring and training a new agent is $1000. The manager of this call center believes that increasing agents’ salary would keep them working longer term in the company. The manager wants to increase the average time that an agent works for the call center to 24 months, or 2 years. b) If an agent works for the call center for 24 months on average, how much can the company save on hiring and training costs over a year? Hint: first determine the current annual cost for hiring and training, then determine the new annual cost for hiring and training Agents ?/month 2 years 1000 Agents 50/month 20 months

6 3. Process Flow Measures Assignment, Problem 2 Solution Current annual cost for hiring and training: Throughput Rate = 50 people/month = 600 people/year Annual hiring and training cost is 600 (1000) = $600,000 New annual cost for hiring and training: Average working time = Throughput Time = 24 months = 2 years Throughput Rate  R= I/T = 1000 people / 2 years = 500 people/year  41.7 per month Annual hiring and training cost is 500 (1000) = $500,000 Annual saving on hiring and training cost is $600,000-$500,000 = $100,000

7 3. Process Flow Measures Assignment, Problem 2 Solution c) How much the monthly salary of each agent can be increased? Average # of employees = 1000 Annual saving on hiring and training cost = $100,000 Monthly saving = $8, /1,000 = $8.33 per employee/month

8 3. Process Flow Measures Little’s Law: Auto-Moto Financial Services Auto-Moto receives 1,000 applications per month (30 working days). In the old process, each application is handled individually, with 20% of applications being approved. 500 were in the process at any time. Average flow time T = ? The firm recently implemented a new loan application process. In the new process, applicants go through an initial review and are divided into three categories Average flow time T = I/R = 500/1,000 months = 0.5 month or 15 days. Process I p = /month 200/month 800/month

9 3. Process Flow Measures Practice; New Process, R, I, and T Initial Review Subprocess A Review Subprocess B Review Accepted Rejected 1000/month 25% 50% 25% 70% 30% 90% 10% 800/month 200/month

10 3. Process Flow Measures New Process: The Same R, But smaller I Initial Review I IR =200 Subprocess A Review I A = 25 Subprocess B Review I B = 150 Accepted Rejected 1000/month 25% 50% 25% 70% 30% 90% 10% 800/month 200/month R = 1000 I = I IR + I A + I B = = 375 Inventory reduced to 375 from 500 in the old process. Since R is constant, therefore T has reduced T = I/R = 375/1000 = month or 0.375(30) = days The new process has decreased the processing time from 15 days to days.

11 3. Process Flow Measures Flow Time at Each Subprocess (or activity) Average Flow Time for Activity IR. Throughput R IR = 1,000 applications/month Average Inventory I IR = 200 applications T IR = 200/1,000 per month = 0.2 months or 6 days with the initial review team Average Flow Time for Activity A. Throughput R A = 250 applications/month Average Inventory I A = 25 applications T A = 25/250 months = 0.1 months or another 3 days in subprocess A. Average Flow Time for Activity B. Throughput R B = 250 applications/month Average Inventory I B = 150 applications T B = 150/250 months = 0.6 months or another 18 days in subproces B

12 3. Process Flow Measures Routing, Flow Time, and Percentage of Each Flow units One flow unit at very macro level: Application 1000 flow units/month at very micro level: Each specific application Two flow units: Accepted and rejected Five flow units: Accepted-A, accepted-B, rejected-IR, rejected-A, rejected-B Accepted-A: IR, A Accepted-B: IR, B Rejected-IR: IR Rejected-A: IR, A Rejected-B: IR, B T IR = 6 days T A = 3 days T B = 18 days We also need percentages of each of the five flow units

13 3. Process Flow Measures New Process: Intermediate Probabilities Initial Review T = 6 Subprocess A Review T = 3 Subprocess B Review T = 18 Accepted Rejected 100% 25% 50% 25% 70% 30% 90% 10% 80% 20%

14 3. Process Flow Measures New Process: Intermediate Probabilities Initial Review T = 6 Subprocess A Review T = 3 Subprocess B Review T = 18 Accepted Rejected 100% 25% 50% 25% 17.5% 7.5% 22.5% 2.5% 80% 20% 50%

15 3. Process Flow Measures Flow Time of the Accepted Applications Under the Original Process – the average time spent by an application in the process is 15 days (approved or rejected) In the new process: On average, how long does it take to approve an applicant? On average, how long does it take to reject an applicant? Accepted-A: IR, A  Accepted-A(T) = = 9  Accepted-A(%) = 17.5 Accepted-B: IR, B  Accepted-B(T) = = 24  Accepted-A(%) = 2.5 Average Flow time of an accepted application = [0.175(9)+0.025(24)]/( ) = In the new process, the average flow time has been reduced from 15 to In addition, the flow time of accepted applications has been reduced to That is what the firm really cares about, the flow time of the accepted applications.

16 3. Process Flow Measures Flow Time of Rejected Applications Rejected-IR: IR  Rejected-IR(T) = 6  Rejected-IR(%) = 50% Rejected-A: IR, A  Rejected-A(T) = 6+3 = 9  Rejected-A(%) = 7.5% Rejected-B: IR, B  Rejected-B(T) = 6+18 = 24  Rejected-B(%) = 22.5% Average Flow time of a rejected application = [0.5(6)+0.075(9)+0.225(24)]/0.8 = Check our computations: Average flow time of an application 0.8(11.343)+0.2(10.875) = 11.25