1 Term Project – Call Center Operations SOM 686, Fall 2006 Darren Mitchell Hayden Gilbert Serge Suprun.

Similar presentations


Presentation on theme: "1 Term Project – Call Center Operations SOM 686, Fall 2006 Darren Mitchell Hayden Gilbert Serge Suprun."— Presentation transcript:

1 1 Term Project – Call Center Operations SOM 686, Fall 2006 Darren Mitchell Hayden Gilbert Serge Suprun

2 2 Term Project – Call Center Operations Agenda  Overview  Call Center Statistics (October), Definitions & Forecast  Process View of the Call Center  Call Center Competencies, Architecture, Three Key Measures & Little’s Law  Call Center Flow, Delays, Queues & Process Attributes  Flow Rate-related Measures of Call Center Capacity  Flow Time-related Measures of Customer Delay  Inventory-related Measures of Customer Queues  Performance Improvements & Managing Capacity

3 3 Term Project – Call Center Operations Overview  Time Warner Cable Los Angeles –Bought Adelphia –Exchanged properties with Comcast –Now provides cable, internet & telephone services to over 2 million customers.  Time Warner Advanced support is local –Teamed up with outsourced partner to provide basic support for all three products.  Basic support includes: billing, basic repair, changes to the accounts & general questions.  Outsourced partner provides basic support from 3 call center locations: USA, Canada & Argentina.

4 4 Term Project – Call Center Operations Overview  Call Center in Argentina supports English & Spanish-speaking customers.  There are 36 agents employed in the center –12 are Spanish only –24 are bilingual  On average, the call center handles 40,000 calls per month.  However, over last 2 months handled calls were 36.5% over forecast.  Service level suffered over past 2 months too –In October, only 32.4% of calls were answered within appropriate time limit.

5 5 Term Project – Call Center Operations Call Center Statistics (October) and Definitions  NCO – number of calls offered  ABA – number of calls abandoned; ABA% - percentage of calls abandoned  SVL – service level  ASA – average speed of answer  Hand – average handle time DATEFCASTNCO % O/U FCAST ABASVL%ABA% ASA (Seconds) Hold (seconds) Hand (seconds) 10/1/20069521,38545.5%59512.9%43.0%66482510 10/2/20061,4731,87727.4%56014.0%29.8%48190500 10/3/20061,3621,68823.9%24131.8%14.3%20586489 ************ 10/30/20061,4732,00836.3%38638.1%19.2%28575476 10/31/20061,2632,23777.1%23846.5%10.6%15673447 41,16854,49432.4%11,11837.7%20.4%24174462

6 6 Term Project – Call Center Operations Forecast  Past 2 months, Argentina used naïve forecast: –(Based on the last year historical data) –Forecast didn’t take into the account recent product changes & integration projects –As a result  October call volume was 32.4% over forecast.  We are suggesting to use Moving average forecast. Ex:  MA 10 3 = (A 10 + A 9 + A 8 )/3, using last months data is (54,494+56,221+50,221)/3=53,636  Therefore, F 11 =53,636. November forecast should be for 53,636 calls. This would allow Argentina to staff appropriately.

7 7 Term Project – Call Center Operations Process View of the Call Center  Inputs/Outputs – customers calling for service/customers completed the call  Flow Units – customers  Network of Activities and Buffers – answering customers’ calls  Resources – customer service agents (CSA), phone automated system (PAS), etc.  Information Structure – account management system, reference materials, etc. InputsOutputs Process

8 8 Term Project – Call Center Operations Call Center Competencies and Architecture  4 Dimensions for measuring the competence of the call center: –Process Cost –Process Flow Time –Process Flexibility –Process Quality.  Argentina call center focuses on the low cost. –Call center provides high-quality Spanish support.  Argentina call center process architecture is defined by the types of resources (CSA, PAS, etc). –Call center falls somewhere along the spectrum between two extremes (flow shop and job shop). –Flow shop fits better, as call center uses specialized resources that perform limited tasks & produce large volumes with high precision and speed.

9 9 Term Project – Call Center Operations Three Key Call Center Measures  Flow Time = Time Customer spends: –In automated phone system –Waiting in the queue for an agent –Talking to an agent. Ex: October Average PAS time is 46, Queue average waiting time is 32 & handle time is 462 seconds. T=540 seconds  Flow Rate = Number of customers that flow through a specific point in the call center process per unit of time.  Inventory = Total number of customers present within call center boundaries. Ex: Argentina call center is 24/7 & call patterns are very different. Therefore, to simplify calculations we will use I=27 customers

10 10 Term Project – Call Center Operations Little’s Law  Throughput = Average number of customers that flow through the call center per unit of time.  Little’s Law - Average inventory (=) Throughput (x) Average flow time. –I = R x T Ex: We identified: T = 540 seconds (9 min) I = 27 customers. Therefore, R = I/T R = 27/9 R = 3 customers/minute

11 11 Term Project – Call Center Operations Call Center Flow, Delays and Queues Customer Arrival RateThroughput RiRi Capacity R p = c/T p R = Min (R i, R p ) I i + I p = I T i + T p = T Queue + Service =Process Number: Time: In:

12 12 Term Project – Call Center Operations Call Center Process Attributes  Inflow Rate R i = Average rate of customer arrivals per unit time. –In the Argentinean call center, R i = 5 customers/minute Processing Time T p = Average time required by agent to process the customer. –T p = 462 (agent) + 46 (PAS) = 508 seconds  c = Number of agents in the resource pool –c = 36 agents in Argentina  Process capacity (R p ) = Total processing rate at which customers are processed by agents in the resource pool. –R p = c/T p or R p = 36/8.47 = 4.25 customers/minute  Buffer capacity (K) = Maximum number of customers that can wait in queue. –K = 120 (there are 10 lines that can hold 12 each at any given time)

13 13 Term Project – Call Center Operations Flow Rate-related Measures of Call Center Capacity  Throughput rate (R) = Average rate at which customers flow through the call center process –R = min (R i, R p ) –In our case, R p is smaller, so R = R p = 4.25  Capacity utilization (ρ) = Average fraction of the resource pool capacity that is occupied in processing customers –ρ = R/R p –In our case, R = R p and ρ = 1 »Our resource pool is constantly busy processing customers.  Safety capacity (R s ) = Excess processing capacity available to handle the customers inflows. –R s = R p – R i –In our case, R s = 4.25 – 5 = -0.75 »All the available capacity is busy processing arrivals.

14 14 Term Project – Call Center Operations Flow Time-related Measures of Customer Delay  Average waiting time (T i ) = Time that a customer spends in queue. –T i = 32 seconds.  Average theoretical time = Average processing time of a customer. –T p = 462 seconds + 46 seconds (automated system) = 508 seconds  Average flow time in the process (T) = Average time that a customer spends waiting in queue & being served –T = T i + T p or T –508 + 32 = 540 seconds or 9 minutes  Flow time efficiency = Proportion of time that a customer spends being served rather than waiting in queue –T p / T =.94

15 15 Term Project – Call Center Operations Inventory-related Measures of Customer Queues  Average queue length = Average number of customers waiting for service –I i = R x T i –I i = 4.25 x 0.53 = 2.25 customers waiting for service  Average number of customers in service = Average in-process inventory –I p = R x T p –I p = 4.25 x 8.47 = 35.99 customers in service  Average total number of customers in the process –I = I i + I p –I = 2.25 + 35.99 = 38.24 customers in the process

16 16 Term Project – Call Center Operations Call Center Flow, Delays and Queues Customer Arrival RateThroughput 5 customers/min Capacity R p = c/T p 4.25 customers/min 2.25 + 35.99 = 38.24 508 + 32 = 540 seconds Queue + Service = Process Number: Time: In:

17 17 Term Project – Call Center Operations Performance Improvements The following levers improved process performance:  Decrease variability in customer interarrival & processing times.  Decrease capacity utilization (or increase safety capacity) either by –Decreasing the arrival rate or increasing the unit processing rate –Increasing the number of servers  Synchronize the available capacity with demand.

18 18 Term Project – Call Center Operations Managing Capacity  Capacity utilization (ρ = R i /R p ) can be reduced by increasing average processing rate (R p )  In order to increase processing rate (R p = c/T p ) we recommended decreasing average processing time (T p )  To achieve a decrease in processing time: –Identified that billing & escalated calls took longer to handle in this call center vs. similar centers. –Thus recommended & implemented 2 separate hour training segments »Billing prorates explanation »How to handle escalated calls

19 19 Term Project – Call Center Operations Call Center Statistics (November)  Processing time decreased to 410 seconds –T p = 410+46 = 456 seconds or 7.6 minutes  Process capacity R p = c/T p or R p = 36/456 = 4.74 customers/minute  Result: Capacity Utilization ρ = R i /R p or 5/4.74 = 1.06 DATEFCASTNCO % O/U FCAST ABASVL%ABA%ASAHoldHand 11/1/20061,9732,0936.08%26847.3%12.8%16766449 11/2/20061,9862,0221.81%26654.7%13.2%15262425 ************ 11/25/20061,3681,51310.60%27956.5%18.4%13948370 45,38147,8325.40%7,08052.1%14.8%15358410

20 20 Term Project – Call Center Operations