Coating schemes for different areas Waterproofing of Terrace Application Procedure: General: STEP 4 Clean, dust free surface, ready for application of.

Slides:



Advertisements
Similar presentations
FLOOR FINISHES Screeds Terrazzo (in-situ type) Ceramic Tiling
Advertisements

Brick and Tile. One of the oldest building materials Manufactured of bricks still follows the same basic procedures Manufactured of bricks still follows.
The Installation Process applicable for new buildings.
DECORATIVE SINGLE COAT PLASTER FOR MARBLE CHIPS CLADDING SYSTEM ( PEBBLEDASH )
Cabinets -4- Countertops.
SHOTCRETING K.V.SUBBA RAO.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Plastering.
Bituminous Materials.
Subfloor Evaluation Prior to Installation Understanding the science of concrete slabs prior to installation of moisture sensitive floor covering materials.
Polymer Floor & Wall Coatings: Selection, Preparation, Installation and Troubleshooting.
LATEXFALT ® PARKDECK.
CE-303-Lecture #1 Fundamentals of Concrete Objectives To explain the basic concepts of concrete To explain briefly the properties of freshly mixed concrete.
Curing and Protection of Concrete
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
Chapter 9 Masonry, Glass, and Plastic. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Outline.
Clay Vocabulary Clay- Clay Construction Techniques o Coil- o Pinch- o Slab- To attach clay together  Score-  Slip-
Voller’s Questions Answer all questions Answer (including all work) on question sheet All questions are equally weighted and make up ½ of the total points.
Building Foundations Foundation Walls.
External Plastering Plain Float Finishes. Backgrounds Concrete blocks Brick E.m.l. Cement boards.
Ag.Mechanics Pd. 2,4,5,6.  Name what the two aggregates are in the cement mixture.  What 3 things make up the cement mixture.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Surface Finishes on Concrete
Glass. Raw Materials Soda-lime-silicate which is made from –silica (sand) –Soda –Lime.
Abralon  Quality from start to finish. RESEARCH & DEVELOPMENT CENTRE.
Engineering Controls for Silica Art Wickman, CIH Georgia Tech Safety & Health Consultation Program.
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
PAINT BASICS for APPLICATORS Dan P. Buelk PCS Presented by:
TEAM: FIBREX Waterproofing Coating. Introduction  The ASTM Standard defines it is a treatment of a surface to prevent the passage of water under hydrostatic.
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
Plastic Shrinkage Cracking How to make sure it happens!
Chapter 8 §8.3 Waterproof Sheet
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
FlameMasks Seminar By Kevan Bence. Actual user results with FlameMasks.com products!
Concrete Countertops. Cast in place Pre – Cast Overlay.
Decorated Coasters NOISE LEVEL 1 Materials  Ruler  Pencil  fine tip marker  Felt/cork  scrapbook paper  8 tiles per rotation  Modge Podge  Foil/wax.
Behaviors of gases and the atmosphere. HOT AIR RISES! hot-air-balloons-work-video.htm.
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
AMAZE (PU) Spray Applied Waterproofing AMAZE (PU) Spray Applied Waterproofing AMAZE ECO PRODUCTS Presented to: Project Name: ALL PROJECTS.
How to set up your paper Fold your paper in half (hot dog style) Measuring from the top you will draw 4 lines at the following measurements: 1 st line.
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
appseal ® XTR Decorative acrylic waterproof coating neha speciality chemicals pvt. ltd. 1.
Required materials for glassing foam. 220, 400 & 600 Grit sandpaper Minwax Polycrylic (clear satin) 3/4oz glass cloth Foam brush Xacto knife (sharp blade)
2000 Prevost Country Coach by Custom Colors Paint & Body.
Silica Fume Inspection
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
PLASTERING AND POINTING Building Construction
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
HOMOGENEOUS VINYL TILES & SHEETING COLORFLOR STANDARD.
Causes of fire &precaution: The variouscauses of fire are as follows: 1. Careless smoking. 2. Faulty electrical wiring or short circuiting. 1.
Welcome To Astec Paint. Our Product Energy Star Heat Reflective Coatings Exterior Finishes Interior Finishes Texture Coatings & Acrylic Renders Roof Restoration.
HOMOGENEOUS VINYL TILES & SHEETING ELITE PUR. INTRODUCTION  Homogeneous vinyl flooring has a uniform structure and composition from the top to the bottom.
Curing Definition The process of prevention of loss of moisture from fresh concrete while maintaining satisfactory temperature regime (BS 8110) Fig: The.
1 Day Product Training Course. How to choose a Tile Adhesive or Grout Type of tile Substrate Service Condition.
Weber Tile Fixing.
Visit for more Learning Resources
Prepared By: Alka Shah Civil Engineering Department
DAMP-PROOFING AND WATER-PROOFING COURSE
Plasters and Pointing. Plasters and Pointing Objects of Plastering: Plastering or surface rendering is the application of mortar to any rough surface.
Civil Engineering Materials
Robert Hatfield Material Science 3344 Spring 2006
إختبار وتقييم المنشآت الخرسانية
CHARACTERISTICS OF CERAMICS AND GLASS 1. HIGH TEMPERATURE STRENGTH 2
Building Construction I Sofia Sebastian 1
How to install pavers..
Solids, Liquids, and Gases Oh My!
Floor Covering.
Winnie the Pooh needs a new umbrella.
Presentation transcript:

Coating schemes for different areas Waterproofing of Terrace Application Procedure: General: STEP 4 Clean, dust free surface, ready for application of polymer based elastomeric coatings STEP 5 Application of 1 st layer of Meta-Proof-709 thermo plastic elastomeric polymer based waterproofing coat STEP 6 Filling of all small pits & cracks by Meta-Proof-716 mortar with the help of float and also leveled the same STEP 1 Surface condition before commissioning of the work STEP 2 Rectification of all major cracks & leveling of uneven surface with the help of water based polymer & cement STEP 3 Finishing of the surface after rectification

Coating schemes for different areas Waterproofing of Terrace Application Procedure: General : STEP 7 Removal of if any moisture on the implicated surface with the help of hot air STEP 8 Cutting the glass fiber sheet as per required dimension where the sheet shall be laid & roll it STEP 9 Application of 2 nd layer of Meta-Proof-709 thermo plastic elastomeric polymer based waterproofing coat below the glass fiber sheet STEP 10 Spreading of 3 rd layer OF glass fiber sheet over the 2 nd layer of Meta-Proof-709 STEP 11 Application of 4 th layer of Meta-Proof-709 thermo plastic elastomeric polymer based waterproofing coat over the glass fiber sheet STEP 12 Application of 5 th layer of Meta-Proof-716 mortar with the help of float

Coating schemes for different areas Waterproofing of Terrace Application Procedure: General: STEP 13 Surface after application of 5 th layer of Meta-Proof-716 mortar with the help of float STEP 14 Application of 6 th layer of Meta-Proof- 716 mortar with the help of float STEP 15 Application of 7 th layer of Meta-Proof-709 thermo plastic elastomeric polymer based waterproofing coat over the Meta-Proof-716 mortar by spraying the silica sand of grade M80 or M100 over the surface of sixth coat in wet condition in case of sandwich application over the coatings

Coating schemes for different areas Waterproofing of Terrace Application Procedure: General: STEP 15 Kotta / Shahabadi tiles laid over the surface of 7 th coat or Application of 8 th layer of Meta-Proof- 709 Top thermo plastic elastomeric polymer based ultra violet (U. V.) resistant coat over the 7 th layer