26.05.2011 Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.

Slides:



Advertisements
Similar presentations
S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1HG may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Analysis of TBTS high-gradient testing and breakdown kick measurements Overview of on-going studies Preliminary results 2012 Feb. 291 RF structure development.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo,
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
RF break-down studies in the CTF3 TBTS Accurate measurements on TBTS RF Break-Down Studies in the CTF3 TBTS 29 Jan Wilfrid Farabolini 1.
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
What is needed for the operation, the resources, infrastructure issues and plans for 2009 and beyond. Impact of short shutdown in 2010 Piotr Krzysztof.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
Phase Feed-Forward Piotr Skowroński (CERN)
Piotr Skowroński for the CTF3 team
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
First Year of Operation at the Two-beam Test Stand
Status and progress of the CTF3 probe beam
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
S. Bettoni for the CTF3 commissioning team CTF3 commissioning status
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński CTF3 Meeting 9 February 2012.
Injector: What is needed to improve the beam quality?
Linac/BC1 Commissioning P
High Level Physics Applications for LCLS Commissioning
CLIC Feasibility Demonstration at CTF3
Maximum Credible Beam Event Paul Emma et al
Presentation transcript:

Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near miss” incident on MKS02 + gun problems Fri 29/04:smoke detection installed + tested, restart RF Mon 02/05:gun high dark current Tue 03/05:cathode changed Fri 06/05:cathode changed again Wed 11/05:first beam to spectrometer girder Tue 17/05:first beam to TL2 Thu 19/05:problem with MKS11 fixed => higher power setup status today:optimized beam up to CR injection

Frank Tecker CTF3 Committee careful new RF setup good beam quality easier and faster set-up (only one day from end of linac to first factor 4 combination!) Excellent 3 GHz setup

Frank Tecker CTF3 Committee “Near miss” – MKS02 fault 31/03 Smoke from a capacitor bank in MKS02 Quick emergency stop – firemen intervention Very limited damage Many capacitors quite old, close to their lifetime limit Likely mechanism: oil leak > sparking > combustion Local smoke detectors in place (already planned) > 1 month delay Other measures: periodic inspections, gradual replacement, software interlock

Frank Tecker CTF3 Committee Selected issues Controls upgrade of BPMs to ‘virtual samplers’: solves problem of overloaded front-ends 4/05: DCTFUMAL, 13/05: DCTFUMAD, 17.5: DCTFUMAR works very well, no connection problems issue with signal length to be solved => no multi-turn orbit MKS02 (rebuilt after PFN damage) needed PFN adjustment => gives higher power now other PFNs also needed adjustment => new beam setup for higher energy two TWT broken, only one left => no 1.5 GHz beam return from repair uncertain (repair has started …)

Frank Tecker CTF3 Committee Long shut-down period From December 14th last year (106 MV/m result) MTV’s cameras at the end of Probe and Drive beam lines have been regenerated after irradiation damages. Shielding reinforced (lead and neutron absorber) BHB 400 and 800 spectrometer magnets cross checked: => no discrepancy found in their magnetic fields Thermal control of the ACS tanks water installed Much more stable laser beam (no drift in time thanks to the use of optic fibers), automatic resynchronization… And of course a lot of work on ACS tank: structure retuned, RF network simplified, pumping improved, RF diagnostics recalibrated… MTV830 pictures before and after thermal processing Bright points histogram

Frank Tecker CTF3 Committee ACS tank water temperature control Two independent water distributions installed for PETS and ACS tanks Three PT 100 temperature probes and one flow meter for the ACS First results obtained by warming the ACS structure with the probe beam are promising (real tests to be done with the RF power) Water distribution Turbine flow meter ACS tank probes and thermal insulation Beam charge 22 nC - Energy 186 MeV - Repetition rate 5 Hz Total beam energy 20 W - Energy deposited in ACS = 10.5 W (half !) ACS intercepts the beamBeam goes through ACS

Frank Tecker CTF3 Committee Laser pulse vs. RF pulse timing Much better QE (0.5 % instead of 0.3%) Smaller emittance Higher energy – 192 MeV Gun loop Compressed RF pulse Beam Quad scan results High energy and low energy spread

Frank Tecker CTF3 Committee First evidence of beam loading Obtained with long pulses : 200 ns – 300 bunches – 21 nC Gun loop unloaded (laser stopped) RF Structure Output unloaded Gun loop loaded RF Structure Output loaded

Frank Tecker CTF3 Committee Beam envelope interactive model (flight simulator) Knowing the Twiss parameters it is easy to draw the beam envelop downstream according to the quad settings. Predictions : Results : MTV390 with low and with high optical magnification (very small waist) TBTS BPMs showing good transport even for long pulses

Frank Tecker CTF3 Committee CALIFES BPMs work BPMs difference signals have been calibrated Position drift seems to occur during long pulses (>100 ns) or maybe phase Transport problem during pulse through ACS Beam position vs. time at the gun output Raw IQ and Sum signals BPMs calibration procedure

Frank Tecker CTF3 Committee CLEX: TBTS - TBL TBTS probe beam BPM studies in view of kick measurements transverse signals not functioning after gain increase last year drive beam amplifiers installed temporarily gain not sufficient LAPP amplifiers repaired with initial (low) gain additional amplifiers to be installed in gallery gain improvement is studied TBL: 3 new PETS installed – waiting for beam => see Steffen’s presentation

Frank Tecker CTF3 Committee Smoke in MKS02 One month stop Planning a 3 GHz beam setup to CR initial beam to CLEX CALIFES setup CR x4 combination emittance studies combined beam to CLEX 100 MV/m acceleration breakdown kicks TBL deceleration (1-2 days for DB beam studies) Test of new PETS on-off scheme TBL deceleration up to 8 PETS ε < 150 mm mrad longitudinal studies stability x8 combination (night running for BDR) breakdown rate measurements PETS / ACS a 1.5 GHz beam setup x8 combination (if TWT is available – only 1 operational) > Beam phaseCSR rep. rate / lossesnight supervision INSTALLATION TBL PETS PETS on-off today > ✔ ✔ Gun 2

Frank Tecker CTF3 Committee Conclusion Progress relatively slow due to “near miss” on MKS02 subsequent careful RF setup + adaptation of the beam => lost about 2 month (including gun problem) excellent 3 GHz beam setup first 4x combination and beam to TL2 – redoing for present energy next: setup combination in CR and send uncombined beam to CLEX can profit from the good beam quality for easier setup 1.5 GHz setup will depend on return of TWT CALIFES was able to operate during the stop, very good set-up, waiting for the drive beam… Many thanks to all involved, especially to Wilfrid for material!

Frank Tecker CTF3 Committee Conclusions - Wilfrid Ready to resume exciting experiments on Two-Beam Acceleration And to produce some strange beam pictures Two different energies in the same beam Beam and calibration pattern ACS shadowing the beam Three spots in the same beam

Frank Tecker CTF3 Committee Spare slides

Frank Tecker CTF3 Committee DB generation – mid 2011 Bunch train recombination Consolidate results, routine operation, stability of fully combined beam Transverse rms emittance Complete TL2, TL2’, TBTS commissioning – full transport to CLEX < 100 π mm mrad after ring, combined beam < 150 π mm mrad in CLEX, combined beam Bunch length control to < 1 mm rms (combined beam) Measurement campaign with different meas. systems (RF defl.& screen, fast streak-camera, RF monitors) R 56 tuning experiments in Frascati chicane and TL2 Beam current stability: improve slow variations, obtain ~0.2 % for combined beam Full measurement campaign (find correlations, jitter sources) Gun pulse flatness, “slow” feedback Improve overall klystron stability (at least up to best performing klystrons) Slow RF feedback (temp. in pulse compressors)

Frank Tecker CTF3 Committee RF structures – mid 2011 Consolidate RF measurements Variable power splitter between PETS and ACS taken out PETS TBTS Goal: nominal power / pulse length inside PETS with recirculation (135 MW, 250 ns total pulse length, 170 ns flat-top) Breakdown rate measurements (at high BD rate - extrapolation to lower rates) Operation w/out recirculation – may have different breakdown rate… Test of new PETS on-off scheme (from summer) Acc. structure in TBTS TD24, initial reconditioning in the shadow of PETS operation Goal: nominal power / pulse length delivered to structure (65 MW, 250 ns total pulse length, 170 ns flat-top)

Frank Tecker CTF3 Committee Two beam issues – mid 2011 TBTS Two-Beam test – 100 MV/m, with correctly tuned structure consistency between power & beam energy gain Drive beam, deceleration, power produced Probe beam, power delivered to accelerating structure, energy gain Beam Loading compensation experiment - by varying fast phase switches – check control of RF pulse shape with probe beam acceleration Measurement of breakdown kicks Measurement of effect of beam loading on breakdown rate (???) TBL Measurement of deceleration / produced power Measurement of energy spectrum Optics, steering algorithm studies

Frank Tecker CTF3 Committee Other issues – mid 2011 CALIFES Fully reach nominal parameters (total charge ?) Bunch length measurements (RF defl. & screen) Other First measurements of phase stability (PETS output, RF pickups…) Operation at 5 Hz Control of beam losses Coherent Diffraction Radiation (RHUL collaboration) …

Frank Tecker CTF3 Committee new RF phase setup Phase µs Phase µs same sag for SHBs and pre-/buncher + accelerating structures => ∆E/E = 0 along the pulse, no bunch length / energy spread variation => tuning all along the pulse identical still: bunch phase variation – could be compensated in Frascati or TL2 chicane (slight energy shaping along the pulse) much less sensitive to phase errors [cos(~few deg)] 2011

Frank Tecker CTF3 Committee Beam status ~constant BPR signal along the pulse => constant bunch length => constant energy + energy spread

Frank Tecker CTF3 Committee Beam status (cont.) constant beam energy without special RF shaping

Frank Tecker CTF3 Committee Emittance measured in H and V for various stages of combination emittance increase more from CR than from DL Simona Bettoni horizontal CR 1 st DL+CR 1 st CR 4 th combined DL+CR 4 th combined emittance [mm mrad] beta [m] alpha vertical CR 1 st DL+CR 1 st CR 4 th combined DL+CR 4 th combined emittance [mm mrad] beta [m] alpha

Frank Tecker CTF3 Committee Schedule – restart 31/1/2011 Optics improvements (DL dispersion) Full transport to CLEX Bunch length control (first tests) TBTS initial PETS tests CALIFES setup new setup when MKS13 available? PETS conditioned to nominal power/pulse length TBL PETS tests Accelerating structure conditioned to nominal power/pulse length PETS breakdown rate measurements??? Test of new PETS on-off scheme Two-Beam test power & energy gain, 100MV/m Beam Loading compensation experiment Measurement of breakdown kicks Measurement of effect of beam loading on breakdown rate install TBL PET S ?? 2 nd TBL PETS installation 6 weeks PHIN phase-coding Laser preparation TBL studies (limited) Stability studies & improvements PETS no recirculation Phase stability Operation at 5 Hz (or more) Control of beam losses Coherent Diffraction Radiation … TBL studies 30% deceleration ? Beam