Assessing Project Related Impacts to Migratory Birds.

Slides:



Advertisements
Similar presentations
Executive Order Responsibilities of Federal Agencies to Protect Migratory Birds.
Advertisements

Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
National Environmental Policy Act of Establishes protection of the environment as a national priority Mandates that environmental impacts be considered.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
Migratory Bird Treaty Act Bald & Golden Eagle Protection Act EO Bird Conservation on Private Lands.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Wildlife Considerations in Financing Wind Power Albuquerque, New Mexico July 2007 Penny Jennings Eckert, Ph.D.
Public Land for the Taking A Disturbing Tale. Outline What is native prairie and what remains? Of what value native prairie? Stewardship of native prairie.
Legal Issues Affecting Wind Energy Federal Nexus: Public Lands. On public land, Federal funding, Federal permit, Federal power grid. On public land, Federal.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
U.S. Fish and Wildlife Service Ecological Services Utah Field Office.
New England Cottontail Conservation Efforts Anthony Tur US Fish and Wildlife Service New England Field Office Concord, New Hampshire.
Module 3 Counterpart Regulations Standards of Review for Determining Project Effects.
Endangered Species Act
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
JOINT VENTURES Celebrating 25 Years of Bird Conservation.
Environmental Impact Assessment Review Process for Oil and Gas Projects In Saskatchewan Larry Lechner, P. Eng. Director Environmental Assessment Branch.
Provisions of the Spotted Owl CHU Rule: How Are We Interpreting What It Says? And How Does it Integrate with the NWFP? Bruce Hollen (BLM) and Brendan White.
Clean Energy in New Jersey is Important to meet Environmental Needs Fossil Fuel derived energy contributes to: Global Warming / Air Pollution Local Air.
Problem Definition Exercise. U.S. Fish & Wildlife Service General Summary Responses from ½ of those surveyed (n=14/31) Broad and narrow in scope Narrow.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Defining Responsible Forest Management FSC Forest Certification Standards Defining Responsible Forest Management Version:
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Environmental Impact Assessment (EIA): Overview
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
Visual Resource Management May 2015 Lander, Wyoming.
Dr. Howard Nelson Biodiversity Specialist Ministry of Planning, Housing and the Environment Trinidad and Tobago.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Chapter 17 Biodiversity. Biodiversity Biodiversity is the same as biological diversity Biodiversity is the same as biological diversity Species diversity-
Nature protection and wind farm development in Serbia Dr. sc. Toni Safner IRES ekologija.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
1. Natural Resources Conservation Service Strategic Plan Strategic Plan
Visual Resource Management May 2015 Lander, Wyoming.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
The Lesser Prairie Chicken Has Been Listed As Threatened: Now What!? The Lesser Prairie Chicken Has Been Listed As Threatened: Now What!? Jim Jones Power.
Implementing Conservation Measures to Reduce Impacts to Migratory Birds.
European Commission Biodiversity and Nature Conservation in the EU today – Business & Biodiversity Alexandra Vakrou, EC, DG Environment IEF European Roundtable.
ASSESSING AND MANAGING WILDLAND RECREATIONAL DISTURBANCE Stephen J. DeMaso, Fidel Hernández, and Leonard A. Brennan Caesar Kleberg Wildlife Research Institute,
Avian Protection Plans Cooperative Utility/Agency Efforts to Reduce Bird Mortality and Improve Service Reliability.
The Endangered Species Act 1973, 1982, 1985, 1988 By Tristan Armstrong.
Can Offsets Deliver a Conservation Gain for Koalas in Queensland? Malcolm Eadie Director of Netgain Environments.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
1 CDBG and Environmental Review For Local Officials.
Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of.
Providing Threatened and Endangered Species Assurances For Prescribed Burning Projects.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
California Department of Fish and Wildlife’s Role in Timber Harvest Review.
Responsible Ecosystem- Based Solutions. Providing environmental consulting services, resource planning and management solutions to government, non-profit,
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Director’s Order 12 contains information concerning review of other agency proposals.
Eng UK © TYRÉNS 2016 ROAD ECOLOGY Mårten Karlson Tyréns AB
Median Estimates of Direct Anthropogenic Bird Mortality (Loss et al. 2014)
New Ecological Science Advice for Ecosystem Protection The EPA Science Advisory Board (SAB) Staff Office supports three external scientific advisory committees.
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Fish and Wildlife Conservation Act & Birds of Conservation Concern.
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Addressing Migratory Birds in NEPA Migratory Bird Conservation for Federal.
Options and Starting Points for Developing for Multi-Species ESA Conservation Programs Specifically for Threats Resulting in Habitat Loss Sean Kyle WAFWA.
EIA approval process, Management plan and Monitoring
Oil Spill Program.
Construction Management & Inspection
Executive Order – The Basics
DG Environment, Nature Protection Unit (D3)
When and how to best consider the provision of the Habitats directive
Environmental Reports
Presentation transcript:

Assessing Project Related Impacts to Migratory Birds

The Fish and Wildlife Service has a mandate and a trust responsibility to maintain healthy bird populations for the benefit of the American people

Why Birds Birds are indicators of ecosystem health  Occupy a diverse range of niches  Cost effective to monitor and track large changes to natural system  Management for birds protect many taxa

Birds are important indicators of our environmental health

 Birds are important to people Pest control Pollinators Recreation  48 million American “Birders”  $82 billion in total industry output

How is This Applicable to Your Organization? Federal Agencies have a responsibility to comply with the MBTA, BGEPA, and EO –Federal agencies may incur civil liability under the MBTA for ongoing or proposed actions that take birds –The Administrative Procedure Act (APA) allows a private party to request that a court enjoin an agency action that does not comply with the MBTA (injunctions usually last until the action is brought into compliance or dropped).

How is This Applicable to Your Organization? Private entities have a responsibility to comply with the MBTA and BGEPA Criminal cases against a private party for violating the MBTA can result in a misdemeanor or felony criminal charge FWS Law Enforcement can use discretion, especially when organizations are willing to work with FWS to avoid or minimize impacts of development

Assessing Project Related Effects Project effects should be assessed for all actions that the agency conducts, oversees, and/or funds Effect analyses should be part of any NEPA or other environmental review process FWS is available to assist with this process –early communication/coordination is encouraged & effective

Steps to Assessing Project Effects Pre-construction Assessments Identify Action Identify Conservation Measures Risk Assessment Post-construction Assessments Reporting

Identify the Action Project Activities Area of Influence Timeline

Pre-construction Assessments Preliminary Site Assessment Broad scale evaluation – landscape scale Look for site(s) with least environmental risk Use existing public or readily available data to identify Large blocks of intact/undisturbed habitat Areas of high value to wildlife (e.g., Important Bird Areas) Communicate early with appropriate Agencies

Pre-construction Assessments Goals Identify Species within Area of Influence o Including temporal and spatial distribution and abundance Identify type and quality of habitat within the project area Identify project-related stressors

Pre-construction Assessments Assessment of Effects Implement appropriate survey methodology Includes appropriate technique and duration and intensity of surveys Determine if MBTA, BGEPA, ESA applies Informs the appropriate consultation to undertake

What is the biggest decision to be made during the pre- construction site assessment? Group Discussion Decisions

Risk Assessments Evaluating potential effects resulting from project related stressors on the species and habitats identified during pre-construction assessments Identify Direct and Indirect effects Attempt to quantify: 1.Projected short- and long-term effects (direct and indirect) 2.Resulting effects from habitat loss, degradation, fragmentation

Direct Effects An effect that occurs at the same time and place Includes: mortality (take) and displacement Examples: Take of adults/nests during construction/habitat removal actions Electrocutions & Collisions Displacement due to habitat loss/disturbance EL Kershner

Indirect Effects An effect that occurs later in time than the action Can be hard to tease out from other perturbations Examples to consider: –Fragmentation –Avoidance –Barriers –Lighting –Noise

Cumulative Effects  Renewable Energy Development  Communication Towers  Buildings/Structures  Cats  Other industries  Other land uses

Goal of Assessments AVOID, MINIMIZE, and COMPENSATE any effects of development

Identify Conservation Measures Also called BMPs or Mitigation Measures Can be general or species/activity specific Implemented during pre-construction, construction, and operation phases

Avoidance – Project Siting Use disturbed lands to maximum extent practicable Minimize area of disturbance Minimize fragmentation of intact habitat blocks Avoid important migratory corridors or wintering areas Avoid features that attract birds (e.g., wetlands)

Seasonal Avoidance Avoid disturbing activities during the nesting season –Nesting season varies by species and area –Contact local Migratory Birds Office or Ecological Services Field Office –Clear vegetation a year prior to construction If activities cannot avoid nesting season: – Provide justification – Survey project area prior to construction – Establish work avoidance buffers

Minimization - Project Design Minimize lighting – motion sensors Minimize noise effects Minimize available perches and nesting structures that might attract birds Avoid use of guy wires on towers & other structures or clearly mark lines

Minimization Work Buffers Distances will vary Species tolerance Habitat type Work type (e.g., prolonged loud noise, short duration) Work with FWS on appropriate distances Avoidance buffer should be based on level of disturbance to a nesting bird Flushing distance where bird remains off nest? Biologist present during activities to ensure nest protection

Additional Measures Prevent release of non-native plants Minimize wildfire potential Erosion Control Minimize operational road traffic Nest Management plan Prepare HAZMAT plan Use of APLIC Guidelines for overhead utilities

Compensation - Habitat Restoration Minimize effects to bird habitat thru restoration On-site restoration for temporary disturbances Off-site restoration for permanent disturbances Use tools such as Habitat Equivalency Analysis

Post-Construction Monitoring Essential to validate pre-construction assessments Generally, monitoring takes two forms Fatality monitoring Monitoring of other effects

Post-Construction Fatality Monitoring Conducted when risk of mortality is possible or uncertain Evaluate all components of a project Evaluate temporal and spatial patterns of mortality

Post-Construction Monitoring of Other Effects Evaluating effects from habitat loss, degradation, fragmentation – Spatial and temporal distribution/abundance changes Demographic effects resulting from alteration of habitat – Reduced survival, productivity, etc

Post-Construction Assessment Compare pre- and post-construction data Were pre-construction assessments accurate? Did Conservation Measures Avoid or Minimize effects (Effectiveness Monitoring)? Are there additional/new measures that could further reduce effects?

Reporting It is essential that project proponents report findings –Share non-proprietary data (species info) –Documented mortality –Conservation Measure effectiveness

Essential To Success Adaptive Management Flexible decision making process when faced with uncertainty Allows adjustments as information is gathered Ideal for development of conservation measures

How should project proponents use Adaptive Management when implementing conservation measures? Group Discussion Conservation Measures

Bird Conservation Plans Negative impacts projected to birds and/or quality habitats Uncertainty of project effects to birds and/or habitats Project is sited in sensitive habitat or important bird use area Presence of birds of conservation concern

Bird Conservation Plans Plans are a tool… That provide an efficient mechanism for developers to document the decision making process Outline steps taken to avoid, minimize, and compensate impacts Demonstrates a developers “good faith” in striving to conserve birds

Class Exercise PROJECT EVALUATION Pre-construction Assessments Risk Assessment – Conservation Measures Post-construction Assessments