Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.

Slides:



Advertisements
Similar presentations
MICHAEL MARINO CSC 101 Whats New in Office Office Live Workspace 3 new things about Office Live Workspace are: Anywhere Access Store Microsoft.
Advertisements

IT Project Management, Third Edition Appendix A1 Appendix A: Guide to Using Microsoft Project 2002.
GAI Proprietary Information
DISC Database and Innovative Software in the Community (DISC) 1 October 9th, 2011 ARMS 1098B Design Review.
SE 555 Software Requirements & Specification Requirements Management.
Microsoft Visio is diagramming software for Microsoft Windows. It uses vector graphics to create diagrams. The 2007 Standard and Professional editions.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Presented By: Shashank Bhadauriya Varun Singh Shakti Suman.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến
Introduction to SharePoint Development with VS2010 Paul Yuknewicz Lead Program Manager
EProject: Airlines Reservation System Instructor: Do Quoc Binh Group 2: Team Member 1.Dao Tuan Huy (GC0232) 2.Le Minh Duc (GC00234) 3.Pham Huu Phuong (GC00252)
Creating Business Workflow Using SharePoint Designer 2007 Presented by Tarek Ghazali IT Technical Specialist Microsoft SQL Server MVP Microsoft SQL Server.
Group 11: LongNH – HongLM – MinhNQ – HuyLD Supervisor: Mr. TaiNT
OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG GIANG TÔ CÔNG THANH.
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
Records Registration Management System The HOB Capstone Project.
SUPERVISORS : Mr. Huynh Anh Dung Mr. Nguyen Tat Trung STUDENTS: Nguyen Thanh Long Nguyen Ky Thanh Duong Quynh Hoang Thi Minh Sau.
Software Quality Assurance
3TC Company e-Restaurant Project management plan lick to add Title 2 Contents Introduction add Title 1 Requirement Specifications 3 Design Description.
Re- Evaluation System Marks Marks Re-Evaluation System.
CAPSTONE PROJECT OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
Anubha Gupta | Software Engineer Visual Studio Online Microsoft Corp. Visual Studio Enterprise Leveraging modern tools to streamline Build and Release.
TRYBE NETWORK ACFactors. FINAL Introduction Bussiness Vision Team Organization Development Result Summary.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Neil Kidd Developer Tools Technical Specialist Microsoft UK.
8/23/2012 FPT University1. Agenda  BTS Introduction  BTS Structure  BTS Functions  BTS Summary  BTS Demo 8/23/2012 FPT University 2.
Online Newspaper CMS 1 Date: 27/12/2012. Contents Introduction Project Management Requirement Specifications Design Description Test Documentation Summary.
SupervisorMr. Phan Trường Lâm Group Members01446 – Trịnh Anh Đức – Nguyễn Minh Thành SE02311 –Phạm Tuấn Anh SE02425 – Vũ Hoàng Anh 1.
Capstone Project FPT University VIETNAM TRAVEL SHARING NETWORK Supervisor: Mr. Nguyen Van Hien Team member: Dao Dang Dan Tran Van Su Nguyen Van Nam Nguyen.
Programming Contest Management System Supervisor : Lecturer Phan Tr ư ờng Lâm Students : Hoàng Quang Mạnh Trần Đình Tuấn Nguyễn Thành Trung Phạm Thị Hồng.
LOGO Song Identification System Team members: Nguyen Ngoc Tan Ho Vinh Thinh Nguyen Huu Duy Nguyen Hoang Diep Nguyen Trong Dai Le Thanh Tung Supervisor:
Capstone Project Spring 2014 eBuz E-commerce System.
Hanoi - December 2012 Capstone Project. Project Team Supervisor: Mr. Nguyen Hong Ky FLIS Team: Pham Hoang Phuong Chu Dinh Nam Pham Van Quyen-
DEAL AGGREGATOR Supervisor Supervisor: Trần Đình Trí Students Students: Nguyễn Mạnh Huy Nguyễn Thanh Thủy Nguyễn Quốc Tuấn Đinh Văn Thể Đỗ Duy Việt.
S OFTWARE FOR PARKING MANAGEMENT USING RFID TECHNOLOGY AND CAMERA Supervisor: Phan Duy Hùng Group Member: Trần Văn Phát Phạm Quang Hào Nguyễn.
LOGO Accounting Module In ERP Supervisor: Mr. Nguyễn Hồng Kỳ Students: Hoàng Phương Thảo Tạ Trung Kiên Nguyễn Tấn Trí Lưu Hằng My Nguyễn Văn Tiệp.
SALE AND INVENTORY MANAGEMENT SYSTEM Supervisor: Mr Phan Duy Hung.
CAPSTONE PROJECT iTest Group Members Dao Van Son Le Thi Huy Duong Do Thanh Trung Nguyen Duc Loc SupervisorNguyen Van Sang.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
METRO CALENDAR A new way to manage your life 1. Table of contents ›Introduction ›Problem definition ›What’s metro calendar ›Project organization ›Project.
Supervisor: Mr. Tran Binh Duong Students: Nguyen Duc Thuong Nguyen Duc Thuong Duong Hong Loc Duong Hong Loc Chu Minh Tung Chu Minh Tung Pham Van Khanh.
WHERE TO TRAVEL Capstone Project. Content Introduction Project Management Plan Requirement Specification Design Description Implementation Testing Summary.
LOGO e-Citizen. Phan Nhật Minh Phạm Thị Dinh Vũ Xuân Đông Phạm Thị Huyền Nguyễn Thùy Trang
LOGO “ Add your company slogan ” Final Project Group: T2H2 Mai Thi Thu Nguyen Van Thanh Do Van Huu Pham Ngoc Huy Supervisor: DungHA TrungNT T2H2 Group:
Group Member: 1. Nguyen Tuan Minh Nguyen Huy Hoang Tran Van Huynh Le Dinh Son Supervisor: Phan Truong Lam.
RFH Team Supervisor: Mr. Phan Trường Lâm Nguyễn Việt Nam – Cao Quốc Hưng – Võ Hoàng Việt – Trần Thị Bích – Nguyễn Tiến Chung -
Capstone Project Chatting secure on Android. Introduction Project Management Plan Requirement Specification Software Design Specification Testing & Evaluation.
HMSystem.Net Group: Nguyen Xuan Thanh Team Leader Vu Thi Mai Hanh Nguyen Chi Liem Bui Ngoc Linh Pham Quoc Hung
Location Information Networking Supervisor: Mr. Luong Trung Kien Students: Le Tien Dung Tran Quang Ngoc Duong Duc Quyen Nguyen Bao Trung Hoang Khac Tien.
LOGO Supervisor: Mr.Huỳnh Anh Dũng Students: Nguyễn Công Tuyến Nguyễn Cảnh Phương Phạm Thị Hằng Bùi Thị Huệ Trần Đức Bình Nguyễn.
House Finding Management Supervisor: Mr. Trần Đình Trí & Avengers Team 1.
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
Team Collaboration Application HAKI Team collaboration - HAKI Nguyễn Văn Hiệp – SE01961 Nguyễn Hoàng Anh – SE02151 Đỗ Hữu Chiến – SE02258 Lê Mạnh Linh.
Team members: Pham Minh Ha Ly Ngoc Anh Nguyen Duc Viet Nguyen Thi Huong Supervisor: Huynh Anh Dung (Mr.)
The commercial center's restaurant management Supervisor: Trần Đình Trí Team member: Nguyễn Tuấn Vương Nguyễn Văn Hoàng Nguyễn Xuân Tùng Phạm Sỹ Vinh Phạm.
MUSIC IN ME Supervisor : Trần Đình Trí. TEAM G5 Trần Hà Huy Bùi Quốc Anh Nguyễn Phúc Lộc Trần Quang Tùng Hoàng Anh Minh.
Blood Bank Phạm Tiến Lập – SE02683 Nguyễn Sơn Hải – SE02879
Online Event Organizing Company Managemant System
Architecture Review 10/11/2004
ONLINE SHOP MANAGEMENT SYSTEM
Capstone Project W-CMS `.
Capstone Project MIDAS PROJECT
Smart Tendering System
Baokim Mobile e-Wallet.
Appendix A: Guide to Using Microsoft Project 2002
Introduction to SharePoint 2007
Appendix A: Guide to Using Microsoft Project 2002
Online Solution for Small Shop
Presentation transcript:

Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang

I. INTRODUCTION II. SOFTWARE PROJECT PLAN III. REQUIREMENT SPECIFICATION IV. SOFTWARE DESIGN V. SOFTWARE TESTING VI. DEMO, Q&A

1. Team introduction 2. Project introduction

1. Team introduction MemberRole DuyTQ+ Project Leader + Coder TienPN+ Coder + Business Analyst PhucNH+ Architecture + Coder TrangNT+ Tester + QA + Business Analyst ChauNLN+ Tester + QA + Business Analyst

2. Project introduction 2.1 Background + Most of communication at work using . + Most of is used with purpose in task controlling. + Lost of people use offline software to manage task. + Most of communication at work using . + Most of is used with purpose in task controlling. + Lost of people use offline software to manage task.

2. PROJECT INTRODUCTION 2.2 Literature : MS first released Microsoft Project : MS first release Microsoft Outlook Lost of project management software such as: Task Manager, VIP Organizer, Planner, Easy Task Link : MS first released Microsoft Project : MS first release Microsoft Outlook Lost of project management software such as: Task Manager, VIP Organizer, Planner, Easy Task Link.

2. Project introduction 2.2 Literature Limitations of existing solution: + Offline task management. + Cost time for update status report. + Task flow management is not clear. Limitations of existing solution: + Offline task management. + Cost time for update status report. + Task flow management is not clear.

2. Project introduction 2.3 Proposal + Create Add in for Outlook to manage task. + Add task flow management. + Center data stored. + Multi user accessing. + Inform using Outlook. + Create Add in for Outlook to manage task. + Add task flow management. + Center data stored. + Multi user accessing. + Inform using Outlook.

1. PROPOSED SYSTEM AND SCOPE 2. PROJECT ORGANIZATION 3. PROJECT PLAN 4. RISK MANAGEMENT

1. Proposed system and scope  Proposed: - WTT Outlook Plug-in: Controlling tasks in Outlook. - The server provide services to working with task.  Scope: - Create a project/Create task. - Project management/Task management. - Export/ Import MPP file - Supports Microsoft Office 2003/2007/2010  Proposed: - WTT Outlook Plug-in: Controlling tasks in Outlook. - The server provide services to working with task.  Scope: - Create a project/Create task. - Project management/Task management. - Export/ Import MPP file - Supports Microsoft Office 2003/2007/2010

1. PROPOSED SYSTEM AND SCOPE TESTDEPLOYMENTDEVELOPMENT Window Server 2003 R2 Windows XP SP2 Windows Vista Windows 7 ADO.NET C# Windows 7 Microsoft Visual Studio Microsoft SQL Server 2008 Express edition. MS Office Outlook 2003, 2007, 2010

2. Project organization Waterfall Software Development Model

2. Project organization Project Leader (DuyTQ) Technical Leader Quality Assurance Business Analyst Configuration Manager Developer Tester PhucNH ChauNLN TrangNT TienPN DuyTQ TienPN PhucNH TrangNT ChauNLN

2. Project organization  Tools and Technique: Astah professional tool StyleCop tool SVN tool Microsoft Visio Microsoft Project  Tools and Technique: Astah professional tool StyleCop tool SVN tool Microsoft Visio Microsoft Project

3. Project plan JANUARYFEBRUARYMARCHAPRIL Intro Project Plan SW Requirement Design Code Testing Unit Testing User Manual R1R1 R1R1 R2R2 R2R2 R3R3 R3R3 R4R4 R4R4 R5R5 R5R5 R6R6 R6R6

4. Risk management  Requirements  Communication  Estimate  Changes  Human Resource  Correctness  Requirements  Communication  Estimate  Changes  Human Resource  Correctness

1. USER REQUIREMENT SPECIFICATION 2. FUNCTIONAL REQUIREMENT 3. NON-FUNCTINAL REQUIREMENT 4. DATA STRUCTURE

1. User requirement specification  Account Manage The system allow user act in project: – User can be import MPP/MPX file or add new project information to control – Allow user has quick view all task status of project or search task information – Allow user view task information detail. – Allow system user export project detail information to MPP file  Account Manage The system allow user act in project: – User can be import MPP/MPX file or add new project information to control – Allow user has quick view all task status of project or search task information – Allow user view task information detail. – Allow system user export project detail information to MPP file

1. User requirement specification The system allow user act in task: – In this task, user can be control PIC and task issues – When task has finished, user can be request approve from manager – Project manager has permission to accept/reject/ cancel this task – Allow user add task to outlook and project manager can be remind to personal in charge The system allow user act in task: – In this task, user can be control PIC and task issues – When task has finished, user can be request approve from manager – Project manager has permission to accept/reject/ cancel this task – Allow user add task to outlook and project manager can be remind to personal in charge

2. Functional requirement System User

2. Functional requirement Project Member

2. Functional requirement Task Flow

3. Non-Functional requirement  Supportability Requirement  Multi –languages  User guidelines  Fix bugs and update version  Performance requirement  Supportability Requirement  Multi –languages  User guidelines  Fix bugs and update version  Performance requirement

3. Non-Functional requirement  Software system attribute:  Usability  Availability  Security  Maintainability requirement  Portability  Software system attribute:  Usability  Availability  Security  Maintainability requirement  Portability

4. Data structure - Database Database Diagram

4. Data structure - XML + Using when tranfer data in + Example: Project Invitation XML Structure ProjectAdded {Project ID } {Account ID} + Using when tranfer data in + Example: Project Invitation XML Structure ProjectAdded {Project ID } {Account ID}

1. TEST TARGET 2. TEST MODEL 3. FEATURES TO BE TESTED 4. CHECKLIST/ TEST VIEWPOINT 5. TEST EXECUTION 6. TEST REPORT

1. TEST TARGET  Spec Coverage: -Verify specifications -Verify user requirement -Detect defects -Manage risk  Spec Coverage: -Verify specifications -Verify user requirement -Detect defects -Manage risk

2. TEST MODEL V LIFECYCLE MODEL

3. FEATURES TO BE TESTED NOREQUIREMENTS 1System allows users to create projects 2System allows users to view projects detail, member and roles 3System allows users to create and assign tasks via 4System allows users to view tasks details, PIC 5 System allows users to view projects and tasks progress via status and percentage of work done 6 System allows users to change password and account information 7 System allows users to access to server to use WTT plug-in by configuring 8System allows users to report tasks done through 9System provides users error messages

4. CHECKLIST / TEST VIEWPOINT  Code review checklist  Case and Requirement Mapping Review Checklist  GUI checklist Common checklists Validation conditions Navigation conditions Usability Conditions Data Integrity Conditions  Code review checklist  Case and Requirement Mapping Review Checklist  GUI checklist Common checklists Validation conditions Navigation conditions Usability Conditions Data Integrity Conditions

5. TEST EXECUTION Bug Management Flow

6. TEST REPORT