Doc.: IEEE 802.15-13-0539-00-0sru Submission Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Evaluation methodology and simulation scenarios.

Slides:



Advertisements
Similar presentations
Doc.: IEEE s Submission January 2015 Mineo Takai, Space-Time EngineeringSlide 1 Project: IEEE P Working Group for Wireless Personal.
Advertisements

Doc.: IEEE sru Submission May, 2013 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE wng0 Submission January, 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE sru Submission Nov 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Simulation Methodology for SRU Authors: NameAffiliationsAddressPhone .
Doc.: IEEE s Submission March 2015 Mitsuru Iwaoka, Yokogawa Electric Co.Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE s Submission January 2015 Mitsuru Iwaoka, Yokogawa Electric Co.Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
Doc.: IEEE /0260r1 Submission Feburary 2011 Mitsuru Iwaoka, Yokogawa Electric Co. Slide 1 IEEE ah Use Case – Industrial Process Automation.
Doc.: IEEE sru Submission 17 Sept 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
Mar 2008 doc:IEEE e Slide 1 Submission Paul Dixon, Pei Liu, Hisilicon. Project: IEEE P Working Group for Wireless Personal Area.
Feb doc:IEEE c Slide 1 Submission Pei Liu, Hisilicon. Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission doc. : IEEE March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE sru Submission July, 2011 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /436r0 Submission November 2003 Vijay DhingraSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE sru Submission September, 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE sru Submission Jan 2014 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Consideration on standardization process Authors:
Doc.: IEEE Submission September 2013 Li, Hernandez, Dotlic, Miura, NICT Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE sru Submission 11 November 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE sru Submission May 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE g Submission July 2010 Roberto Aiello, John BuffingtonSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Submission November 2015 Slide 1Li Qiang, Huawei Technologies Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE sru Submission 9 May 2014 M Ariyoshi (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE sru Submission March 2013 Stefan Aust (NCOS)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE g TG4g Presentation Jan 2010 C.S. Sum1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)‏
Doc.: IEEE c Submission July, 2005 Skafidas,Pollock,Saleem, NICTASlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0111r1 Submission May 2006 LEE, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE /099r0 Submission March 2000 Khaled Amer, AmerNetSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [Add name of submission]
平成30年9月 doc.: IEEE /424r1 Novemver 2007
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
doc.: IEEE <doc#>
May 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal of radio resource management architecture]
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
<month year> doc.: IEEE /119 September, 2003
<month year> doc.: IEEE sru Nov. 2013
平成31年1月 doc.: IEEE /424r1 July 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c motion.
<month year> doc.: IEEE < e>
September 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Closing report for September 2013]
doc.: IEEE <doc#>
January 2003 doc.: IEEE /056r0 May 2004
平成31年2月 doc.: IEEE /424r1 November 2007
平成31年2月 doc.: IEEE /424r1 Novemver 2007
<month year> November, 2004
<month year> doc.: IEEE / January 2005
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [16 March.
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
<month year> <doc.: IEEE doc> May 2015
<month year>20 Jan 2006
<month year> <doc.: IEEE doc> January 2016
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [19 May 2016]
<month year> doc.: IEEE / September 2004
平成31年5月 doc.: IEEE /424r1 September 2007
doc.: IEEE <doc#1>
<month year> doc.: IEEE / July 2004
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DF6 Radio-burst length over PSDU size] Date.
November 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SRU IG Closing Report for Dallas November.
平成31年7月 doc.: IEEE /424r1 March 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Call.
平成31年7月 doc.: IEEE /424r1 November 2007
<month year> <doc.: IEEE doc> September 2015
<month year> <doc.: IEEE doc> March 2015
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [17.
July 2003 doc.: IEEE <03/242> July 2003
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Presentation transcript:

doc.: IEEE sru Submission Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 1 Evaluation methodology and simulation scenarios Authors: NameAffiliationsAddressPhone Takashi YamamotoSumitomo Electric Industries, Ltd , Shimaya, Konohana-ku, Osaka, Japan Yoshizo Kenichi Hirotsugu Yoji

doc.: IEEE sru Submission Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 2 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Evaluation methodology and simulation scenarios] Date Submitted: [16, Sep 2013] Source: [Takashi Yamamoto] Company [Sumitomo Electric Industries, Ltd] Address [1-1-3, Shimaya, Konohana-ku, Osaka, Japan] Voice:[ ], FAX: [ ], Re: [In response to call for pre-proposals for potential SRU Study Group] Abstract:[The proceedings to identify evaluation methodology and simulation scenarios are proposed.] Purpose:[For the SG and future work] Notice:This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P

doc.: IEEE sru Submission Current Status Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 3 SG-SRU has a focus on improving utilization of spectrum resources through RRMM mechanisms. –Use case examples: hospital, industrial automation, infrastructure monitoring SRU should clarify the motivation for working on RRMM. –Clarify what metrics to use –Assess feasibility –Quantify gains over legacy features

doc.: IEEE sru Submission Proposal of the proceedings Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 4 Utilize simulation to clarify the motivation –Quantify the performance of legacy features and capture the key characteristics of the use cases –Analyze new RRMM features shown in [1] Timeline –Identify the simulation scenarios in SG phase –Evaluate the legacy and new features in TG phase TG can discuss the optimization of simulation scenarios as necessary.

doc.: IEEE sru Submission Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 5 Example of simulation scenarios use case: industrial automation 2km Building IEEE STA (Wireless Sensor/Actuator) IEEE AP There are thousands of wireless sensors and actuators. Radio communication range is more than 500m in case of LOS. APs are connected in backhaul network. Backhaul network uses wired or IEEE Let’s start designing simulation scenarios in the following manner!

doc.: IEEE sru Submission Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 6 #CategoryComment 1LocationOutdoor 2Environment typerural, rich specular metallic structures 3STA/AP communicationSend/receive (Monitoring, Control) 4Data rate< 1Kbps 5MobilityStationary, Low velocity 6Traffic typePeriodic (0.1s~100s), Burst 7STA/AP capacitySTA: , AP: 10 8STA/AP categorySTA: fixed, low velocity, AP: fixed 9STA/AP elevationSTA: 1-20m, AP: 1-20m 10STA/AP Tx power10mW 11STA-AP Distance<2km 12STA-AP Distributionnon-uniform 13Evaluation metricpacket delay(< hundreds of milliseconds), packet loss, power consumption, etc. Example of simulation scenarios (cont’d)

doc.: IEEE sru Submission Strawpoll Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 7 Do you agree that SG SRU investigates the following items through the simulation work? –M2M Use Case, Application –Requirement (number of wireless nodes, communication range, throughput, etc.) –Network and Software Architecture Yes - No - Abstain -

doc.: IEEE sru Submission Reference Sep 2013 Takashi Yamamoto, Sumitomo Electric IndustriesSlide 8 [1] sru-ig-sru-usecase-requirements