H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status of the Silicon Strip Detector at CMS INSTR08 Novosibirsk, Feb08 Hans Jürgen Simonis Universität.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
ET CMS detector resolution zCMS Silicon Strip Tracker zCMS Silicon Strip Detector Resolution zHIP Silicon Beam Telescope.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
ATLAS SCT module performance: beam test results José E. García.
The Si Detectors in the CMS Tracker, commissioning, operation, future perspectives Michael Hoch 2. June 2010.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Performance of ATLAS & CMS Silicon Tracker Alessia Tricomi University and INFN Catania International Europhysics Conference on High Energy Physics EPS.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Operation of the CMS Tracker at the Large Hadron Collider
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
First CMS Results with LHC Beam
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Alignment of the CMS Tracker
Tracking detectors/2 F.Riggi.
Scope R&D Participants/Infrastructure
FCAL R&D towards a prototype of very compact calorimeter
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Simulated vertex precision
Commissioning and performance of the CMS silicon microstrip detector
Integration and alignment of ATLAS SCT
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Planar Edgeless Silicon Detectors for the TOTEM Experiment
5% The CMS all silicon tracker simulation
Niels Tuning (Outer Tracker Group LHCb)
Performance of ATLAS & CMS Silicon Tracker
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status of the Silicon Strip Detector at CMS INSTR08 Novosibirsk, Feb08 Hans Jürgen Simonis Universität Karlsruhe On behalf of the CMS-Tracker Collaboration

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 CMS -- Compact Muon Solenoid

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 The CMS Si-Strip Tracker 200 m 2 of active Silicon Si Modules APV FE chips 9.6 M readout channels 26 M wirebonds Optical links What is in this box? Size: 6m x 2.5m required temperature: –10 °C on the Silicon surface (status september 07)

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 The Tracker Constituents how is it organized? SS Modules red DS Modules blue ( 100 mrad stereo angle) TOB (Tracker Outer Barrel) 6 layers 5200 modules TID (Tracker Inner Disks) 2x3 disks 800 modules TIB (Tracker Inner Barrel) 4 layers 2700 modules TEC (Tracker EndCap) 2x9 disks 6400 modules IP  z (mm) r (mm) Beam hermetically closed system tracking combines to outer Muon system resolution of p t ~1.5% at 100GeV

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: Modules 2700 TIB Modules 768 strips/sensor 6400 TEC Modules 800 TID Modules 10 different geometries 5200 TOB Modules example: „stereo“-type 512 strips/sensor R1 R2 R3 R4 R5 R6 R7 TOB TEC TIB TID

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: TID The free space between modules is covered with overlapping modules on the backside. Modules are directly mounted on the cooling pipes. one TID ready for mounting to TIB we have 2 TIDs (z+ / z-) with 3 disks each each disk consists of 3 rings of modules each ring is mounted on a carbon fiber annulus TID

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: TIB The Inner Barrel consists of 4 layers of modules (“shells”) at radii: (20 cm < r < 55 cm) The 2 inner shells are equipped with double modules (stereo) Each shell is produced in 4 large pieces: “half-shells” (2 for z+ and 2 for z-) Modules are mounted with overlap in . (surface tilted wrt tangent) Modules on inner and outer surface overlap in z. Starting from shell-4, shells are sequentially slid into the volume. handling of components „on-shell“ is a delicate procedure Half of the TIB seen as a Matrjoschka (матрёшка) shell: TIB

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: TOB The Outer Barrel spans the region (55 cm < r < 116 cm) with 6 layers Again, the 2 inner layers consist of double modules (stereo) A large CF support structure is loaded with 688 “rods” as sophisticated substructures The concept of rods (8 different types) allowed a distributed production scheme Rod-genesis: frame + interconnectboard + 6(12) modules The 2 outer layers were the first to be equipped with rods TOB

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: TEC we have 288 Petals of 8 different types, equipped with modules The 2 Endcaps consist of 9 Disks each Wedge-shaped modules form 7 concentric rings with all strips pointing to the beam axis Rings 1,2 and 5 have double modules („stereo“-rings) „Petals“ represent the substructures which allow for distributed production A fully equipped Endcap The 16 Petals of Disk-1 can nicely be seen TEC

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracker Production: Just plug everything together The support tube carries all the tracker elements and serves as thermal shield (with active cooling) towards the ECAL: -15º inside; +18º outside The assembly took place in a large clean room (TIF) where all aspects of system tests could be performed Tracker ready for transportation to CMS site, 20 km from CERN

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 ROD INTEGRATION AachenKarlsruheStrasbourgZurichVienna PETALS INTEGRATION Aachen Brussels Karlsruhe Louvain Strasbourg Vienna Lyon TEC assembly Pitch adapter: Factories  Brussels TK ASSEMBLY CERN TIF Louvain Strasbourg Firenze Vienna BariPerugia BariFirenzeTorinoPisaPadova TIB-TID INTEGRATION FNAL UCSB TOB assembly TIB/TID assembly CERN PisaAachen Karlsruhe FNAL Sensor QAC Module assembly Bonding & testing Sub-assemblies UCSB FNAL Integration into mechanics UCSB Hamburg Hybrids: Factory-Strasbourg Sensors: Factories Kapton: Factory  Aachen, Bari Frames: Brussels,Pisa, Pakistan Pisa Perugia FE-APV: Factory  IC,RAL Control ASICS: Factory  Company (QA) Brussels HH CERN CF cutting Factory CF plates: Factory  Brussels CF cutting Factory TorinoPisa Move to Pit and Insert Florence

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Cosmics in the TIF – (Tracker slice test) (summer 2007, on surface, without magnetic field) already large (~15%) Tracker System only Silicon Strip Tracker involved 2161 modules – 24,75 m² active area measurements at different temperatures down to -15°C trigger rate 6.5 Hz ; 4.5 M events

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Signal to Noise TOB TIB TIDTEC Average value: S/N~30 for all subsystems noise charge versus strip length; all TOB and TEC geometries Strip length [cm] noise [e-]

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Tracking in TIF cosmics are rather different than pp-collisions  special tracking algorithm has been developed  module orientation not ideal (especially TEC and TID) comparison of measured conditional track reconstruction efficiencies (TIB/TOB) with simulations  Efficiency polar angle preliminary TOB efficiency given a TIB track TIB efficiency given a TOB track ▼Data ▲Simulation

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status: Tracker insertion

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Installation Status Z- ; 25 Feb.2008 Lots of Connections: 980 pipes 3347 fibers 2330 cables Z Sequence: → Barrel fibres → Pipe connection → Pipe insulation → Barrel cables → TEC fibres → TEC cables w w p p p W w p = partially done = in work w report from M. Eppard

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status Feb.25 Tracker is in final position inside CMS with an accuracy of 1mm Fibers for Barrel, and almost all cooling pipes are connected Services for Endcap are the last to be finished Beampipe installation foreseen mid-April BUT! CMS-closure test interferes with Tracker progress (in May) Cosmic Runs (CRAFT) are foreseen until first beam (June/July 2008)

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 SLHC: ~90 soft interactions superimposed on interesting event (could be ~200 or even 400; depending on bunchstructure) LHC: ~20 soft interactions superimposed on interesting event ( --> 1000 tracks/bc) The upgrade of the LHC machine cannot be in energy, but in luminosity:  [p / s cm2] The way how to reach that is not yet clear (12.5ns, 25ns, 50ns bunches, …) Higher occupancy ~10000 tracks per bunch crossing!  we need shorter strips  more electronic channels  more power required but: tracker material budget is already at its limits studies on new supply schemes have started (cooling; DC-DC-converters etc) About Detector upgrade (SLHC) (our silicon tracker will be dead after 10 years of LHC operation)

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 About Detector upgrade (II) Higher irradiation Dose  In inner region (r <~ 40 cm) we need new rad-hard sensor-material  see RD50 activities (->Talk from G. Casse after lunch) In the outer region existing material (p-in-n float zone) can possibly be used. n-in-p and / or Magnetic Czochralski are in discussion But most challenging is the requirement that the SCMS-tracker has to contribute to the L1-trigger (detect high p t -tracks)  we need a new Tracker design several layouts are discussed: 3 Super-layers of stacked doublets - M. Mannelli PD TIB TOB Extra pixel layer, bigger pixels, long pixels/short strips, & 1-2 triggering layers - J. Nash

H.J.Simonis, CMS Collaboration, Novosibirsk Feb December 2007: Tracker in CMS

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Backup Material

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Silicon Sensors Bias Voltage p-in-n type silicon – orientation 1.5 – 3.2 kΩcm resistivity; 320 µm thickness 4.0 – 8.0 kΩcm resistivity; 500 µm thickness

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 The Readout scheme A Readout-hybrid with 4 APV chips Control branch (clock, trigger, …) Data branch amplify, shape and store

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 The Material budget the contribution of different constituents is color-coded: support cooling cables

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Scint. Conf. B, Room Temp Scints Conf. C, Room Temp 10°0°-10°-15° TIB → StoN ~ 27; TOB → StoN ~ 31; TEC → StoN ~ 31 Signal / Noise for the different Tracker elements at various temperatures corrected for incident angle

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 MTCC – MagnetTest and Cosmic Challenge (summer 2006, still in surface hall) small Tracker system within CMS-Magnet all CMS-subsystems involved (incl. ECAL, HCAL, Myon-System) for Tracker: 1% of electronic channels (~10 5 ) connected 133 modules in total (  0.75 m 2 Si area) 25 M events at different magnetic field values up to 3.8T check of noise behavior check software (readout, data handling, tracking algorithms) 4 TOB rods 2 TIB segments 2 TEC petals

H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Petal assembly