A GIS BASED ASSESSMENT OF ELECTRICITY TRANSMISSION AND DISTRIBUTION INFRASTRUCTURE IN ZANGON SHANU Ahmadu Bello University, Zaria.

Slides:



Advertisements
Similar presentations
International Hydrographic Organization CAPACITY BUILDING (Brief) CB Strategy CB Management Further Developments.
Advertisements

GIS APPLICATIONS IN SELECTION OF SOLID WASTE DISPOSAL SITES
Siting of Obnoxious Facilities in the City of Austin Jayanthi Rajamani Fall 2002 University of Texas at Austin.
'A policy framework for the governance of integration across the energy system' Professor Brian Collins Professor of Engineering Policy, UCL.
Geospatial Technology in Agriculture: Issues and Challenges Muhamad Radzali Mispan Principal research officer Malaysian agriculture research and development.
1 World Bank Land Market Assessment Training – February 28 th Part 1 – spatial tools to analyze the impact of land markets on affordability and urban spatial.
GIS: The Grand Unifying Technology. Introduction to GIS  What is GIS?  Why GIS?  Contributing Disciplines  Applications of GIS  GIS functions  Information.
Border around project area Everything else is hardly noticeable… but it’s there Big circles… and semi- transparent Color distinction is clear.
GIS DEVELOPMENTS AT FEA E. Naitini CONTENTS INTRODUCTION USING FEA_GIS HIGHLIGHTS FOR 2010 FUTURE PLANS CONCLUSION.
June 15, 2015June 15, 2015June 15, THE COURSE Mapping and Surveying Geographical Information Systems Importance of Data Global Positioning Systems.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
GIS Joel, Matt, Nic & Lexi BA 471 – Prof. Reitsma February 13, 2006.
Needs Assessment April 5 th 2006 Geog 463: GIS Workshop.
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Land-Use and Transportation
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Application Studies using GRAM++ GIS. GIS And Its Application In Health Sector A Health GIS For Directorate Of Health Maharashtra Service Availability.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
Second High Level Forum on GGIM Seminar on Regional Cooperation in Geospatial Information Management Doha, Qatar, 7 February 2013 Overview on Geospatial.
Implementing HAZUS-MH in Pre-Disaster Mitigation
COROZAL LPWG Municipal Development Plan Presentation of draft chapters 1, 2 and 3 2 nd National Workshop Belmopan, December
Subtitle, Date, Presenter Optimizing intensified Runoff from Roads for Supplemental Irrigation, Tigray Region,Ethiopia March,13/ 2014 By:Meseret Dawit.
America’s Water Upmanu Lall water.columbia.edu.
UNIVERSITY OF NAIROBI DEPARTMENT OF GEOSPATIAL AND SPACE TECHNOLOGY FINAL PROJECT PRESENTATION 3 rd April 2014
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
California Needs Assessment of Workforce Issues for Energy Efficiency, Demand-Side Management, Renewable Energy and the Green Economy Conducted by the.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
2022 GROWTH TARGETS I. Household Targets II. Job Targets III. Countywide Planning Policy Amendments.
Geographic Information Systems (GIS) An Introduction.
Introduction to Geographic Information Systems (GIS) Lesson 1.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Earthquake Vulnerability and Exposure Analysis Session 2 Mr. James Daniell Risk Analysis Earthquake Risk Analysis 1.
1 MANAGING AGRICULTURAL STATISTICS IN THE CONTEXT OF THE NSDS THE EXPERIENCE OF UGANDA EXECUTIVE DIRECTOR UGANDA BUREAU OF STATISTICS ISI Satellite Meeting.
Biodiversity and Ecosystem Accounting Initiatives in Uganda Ronald Kaggwa (NEMA) Bright Kimuli (UBOS)
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
Placer LAFCO Municipal Service Review North Tahoe/Martis Valley Area Northstar CSD and PCWA.
Needs Assessment Geog 469 GIS Workshop. Outline What is the rationale behind needs assessment? What are the benefits of GIS projects? What is a hierarchical.
California Needs Assessment of Workforce Issues for Energy Efficiency, Demand-Side Management, Renewable Energy and the Green Economy Conducted by the.
1 Blue Revolution Initiative: Improving Water Management for Health, Prosperity and Security in the Middle East and Asia JOHN WILSON Deputy Director Office.
Copyright 2010, The World Bank Group. All Rights Reserved. Sources of Agricultural Data Section A 1.
URBAN DEVELOPMENT PLANNING
Avalon Park Retail Market Analysis Fishkind and Associates, Inc Corporate Blvd. Orlando, FL December 12, 2008.
University of Palestine Faculty of Applied Engineering and Urban Planning GIS Course Spatial Analysis Eng. Osama Dawoud 1 st Semester 2009/2010.
San Marcos Fire Station Location Analysis - Progress Report- Andrea Nieto, Bryan Heisinger, Nadine Oliver Matthew Mitchell.
Enhancing Institutional Capacities for Urban Management Vinod Tewari Director National Institute of Urban Affairs
LINKING OPPORTUNITY AND NEED: MAXIMISING BENEFITS OF PHYSICAL REGENERATION SCR Mixed and Sustainable Communities Learning Network 26 March 2009.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session introduces the six transitional settlement options.
Environmental Systems Modeling EENV 5326 GIS for Environmental Engineering.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ECLAC HANDBOOK FOR ESTIMATING EFFECTS OF DISASTERS1 HANDBOOK FOR ESTIMATING SOCIO-ECONOMIC AND ENVIRONMENTAL EFFECTS OF DISASTERS Economic Commission for.
Review of South African Energy Statistics International Workshop on Energy Statistics, Mexico 2-5 December 2008 Mr J Subramoney, Director: Energy Information.
1 CENSUS August 2011 SECRET. 2 Outline of Presentation  Census Benefits  Previous Censuses Difficulties and Outcomes  Census 2011 Key Dates.
Business Process Mapping “Power Sector - Distribution”
The Role of Infrastructure in Urban, Rural, and Regional Development: A Survey of Literature Sophremiano B. Antipolo Philippine Planning Journal, UP SURP,
SEE Energy Poverty Nexus Aleksandar Kovacevic. 2 Concept of Affordable Energy compromises: Total social costs of energy that could be covered by productivity.
1 Planning 4A7 Design & the Built Environment Dept. of Civil, Structural, & Environmental John O’Connor.
Support to Food Value Chain Industrialisation – Challenges and Solutions International Fund for Agricultural Development - October 2015.
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
The Canadian Energy Research Institute and Friends of AIMS Present:
Tourism Master Plan A master plan for tourism destinations usually incorporates concerns that includes all aspects of Tourism development process. Factors.
Principles and definitions of conducting Agriculture Census in Armenia
Electricity is produced at the power station.
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
Tayseer Anis. IT Manager Dept. of Statistics (DOS)
Chapter 4. Modeling Transportation Demand and Supply
PA LS Burnt Store Area Plan
© 2016 Global Market Insights. All Rights Reserved Porcelain Insulators Market industry analysis research and trends report for 2019.
Presentation transcript:

A GIS BASED ASSESSMENT OF ELECTRICITY TRANSMISSION AND DISTRIBUTION INFRASTRUCTURE IN ZANGON SHANU Ahmadu Bello University, Zaria

STATEMENT OF RESEARCH PROBLEM There has been relatively little interest in the relationship between urban planning and the provision and management of electricity distribution networks. Electricity transmission and distribution is supposed to be a joint coordinated effort between the planning authority, which is responsible for setting standards and PHCN, the agency responsible for generating and distributing electricity. Zangon Shanu, being a residential area has developed haphazardly causing problems to the electricty system. Some of the problems facing Zangon Shanu are -Lack of clearly defined utility lines -Epileptic power supply caused by overloaded power distribution transformers -Poor electricity distribution networks due to inadequate data on electricity demand. Conventional method for establishing demand for electricity does not consider household sizes. GIS based methodology will help compute electricity demand based on household size and land use characteristics. Other researchers such as Igbokwe, J.I. and Emengini, E.J. (2005); and Aleksandar (2010) carried out studies on the supply side of electricity and this was done at the regional level by applying GIS. This research attempts to establish the demand and supply of electricity at the neigbourhood level and also check the suitability of sited electricity infrastructure.

AIM The aim of the study is to assess the pattern of electricity distribution in Zangon Shanu using GIS, with a view to identify problems and make recommendations for improvement. OBJECTIVES  To review the application of GIS in assessing electricity distribution system.  To examine the locational characteristics of existing electricity infrastructure in the study area. To examine the locational characteristics of existing electricity infrastructure in the study area.  To apply GIS in identifying problem areas within the existing transmission and distribution system. To apply GIS in identifying problem areas within the existing transmission and distribution system.  To make physical planning recommendations. To make physical planning recommendations.

 LOCATIONAL CHARACTERISTICS OF EXISTING ELECTRICITY INFRASTRUCTURE IN ZANGON SHANU ● Location OBJ 2

 LOCATIONAL CHARACTERISTICS OF EXISTING ELECTRICITY INFRASTRUCTURE IN ZANGON SHANU ● Population -The 2006 National Population and Housing Census puts the population of Zangon Shanu at 7,727 persons. With a growth rate of 3.2%, the projected population in 2012 is expected to be 9,334 persons. LAND USE CATEGORY AREA (Ha) PERCENTAGE (%) Developed Area Vacant developable area and areas under agricultural use Vacant undevelopable area with water bodies TOTAL ● Physical Development Characteristics LANDUSEAREA (Ha)PERCENTAGE (%) Residential Commercial Public Light Industrial Circulation Mixed TOTAL OBJ 2

 LOCATIONAL CHARACTERISTICS OF EXISTING ELECTRICITY INFRASTRUCTURE IN ZANGON SHANU OBJ 2

 APPLYING GIS TO IDENTIFY PROBLEM AREAS WITHIN THE EXISTING TRANSMISSION AND DISTRIBUTION SYSTEM ● Methodology Flow Chart Acquisition of Satellite Image Reconnaissance / Field SurveyEstablishment of Co-ordinates (Control Points) Collection of GPS Co-ordinates of existing Electricity Transmission and Distribution Infrastructure Mapping / Vectorization Acquisition and Creation of Attribute Data * Land Use Type* House hold Size* Electricity Supply Status * Capacity of Distribution Transformers * Street Name*Others Electricity Demand and Supply Recommendations Georeferencing using Control Points Buffering of Infrastructure OBJ 3 Overlays (Intersect and Identity) Queries Data Analysis

Identity Overlay

The identity from the analysis shows that 141 out of 1,789 buildings have electric distribution lines running directly over them. Occupants of such buildings are exposed to electric shocks, fire outbreaks and radiation from power lines. This accounts for 8% of the total buildings in the study area. Identity Overlay

The intersect from the analysis shows that 62 out of 1,789 buildings are likely to be exposed to hazards such as radiation and damages resulting from collapse of poles on buildings. This is as a result of siting high tension cables and poles close to buildings Intersect Overlay

The intersect from the analysis shows that 558 (31%) buildings out of 1,789 buildings in Zangon Shanu can be exposed to radiation, electric shocks and damages resulting from collapse of poles on buildings as a result of wrong location of electricity distribution poles and lines. More electricity distribution infrastructure are wrongly sited when compared to electricity transmission infrastructure in the study area Intersect Overlay

SUMMARY OF FINDINGS ELECTRICITY DEMAND SECTOR CAPACITY (KVA) CURRENT DEMAND FOR BUILDINGS WITH ELECTRICITY (KVA) ESTIMATED DEMAND FOR BUILDINGS WITHOUT ELECTRICITY (KVA) TOTAL DEMAND (KVA) SHORTFALL (KVA) RESCOMMXDPUBL.INDRESCOMMXDPUBL.IND A B , C D E6101, , TOTAL3, ,417.6 ANALYSES BLDGS AT RISK LAND USE CHARACTERISTICS PERCENTAGE OF TOTAL HOUSING STOCK RESCOMMXDPUBL.IND Transmission Lines % Distribution Lines % Transformers % Buildings with Distribution Lines overhead % Buildings with Transmission Lines Overhead SUITABLILITY OF LOCATION OF ELECTRICITY INFRASTRUCTURE

 PHYSICAL PLANNING RECOMMENDATIONS ● Overloading of Transformers OBJ 4 From the assessment carried out, problems were identified and the following physical planning recommendations will help in effective electricity transmission and distribution by the PHCN in Zangon Shanu -Replacement and or provision of transformers with larger capacities ● Proximity of Electricity Infrastructure to Buildings -Rerouting of transmission lines -Insulation of distribution lines -Relocation of Transformers from developed areas ● Risk of Electrocution -Adoption of site and services schemes and preparation of layout plans for undeveloped areas -Introduction of underground electricity distribution networks ● Other Recommendations -Planning authorities need to embrace and employ the use of GIS to check sites before approvals -Need to brief, train and retrain PHCN staff on the relevance of GIS in the Nigerian power sector -Planning authorities should make layout plans readily available to the PHCN