Launch Vehicle Propulsion Payload Recovery Vehicle Dimensions Total length of 116.5 inches 4.0” Airframe (3.9” Inside diameter) Fin span of 3.91” Separates.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

University of Florida PDR Presentation. Vehicle Design Diameter: 5.86 Length: 135 Static Stability Margin: 1.4 Total Weight: 23.6 lbs.
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
UAA Rocketry PDR Presentation NASA Student Launch
University of North Dakota Frozen Fury Critical Design Review February 2, 2015.
P RELIMINARY D ESIGN R EVIEW University of North Dakota Frozen Fury Rockety Team.
“ The Other Woman ” National Association of Rocktry Level Three Certification Project By Steve Laird NAR #86948.
Critical Design Review NASA University Student Launch Initiative University of Nebraska–Lincoln
Student Launch Project Preliminary Design Review January 10, 2014.
Launch Lug – helps to guide the rocket upward until it reaches enough velocity for the fins to engage. Parachute – assists in the safe recovery of the.
Illinois Space Society Tech Team USLI CDR Presentation.
Our Mission Statement  Launch a high-power rocket to an altitude of one mile carrying the Operation: Epic Beep payload package. At lift off, the rocket’s.
NASA SLI 2010 Mulberry Grove High School Critical Design Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
RezRiders. Mission statement Through the USLI program the Northwest Indian College Space Center’s RezRiders Team enhances its involvement in science,
Flight Readiness Review March Vehicle Criteria Testing and vehicle design Bulkheads: 9-Ply ½” birch plywood made by Public Missiles, Ltd or ¼ inch.
NASA CDR Presentation Spring Grove Area High School.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim.
November 7,  Length: inches  Diameter: 6.00 inches  Mass: oz. / 17.34lbs.  Span: inches  Center of Gravity: inches.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Illinois Space Society Tech Team USLI FRR Presentation.
CDR Clear Lake's Team Rocket 2929 Bay Area Blvd. Houston, TX
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Student Launch Project Flight Readiness Review April 21, 2014.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Safety ► The safety officer for the entire team is Maia Madrid. ► During launch we will follow NAR safety rules and regulations. ► We will follow standard.
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
3/19/09. Animal Motor Works (AMW) K475WW High Power Rocket Motor. 54 mm casing, 40.3 cm long, 2.9 seconds burn time, 1394 N-sec total impulse, and
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
University of Arkansas Senior Project- When Pigs Soar.
STUDENT LAUNCH PRELIMINARY DESIGN REVIEW PROJECT ADVANCE.
The Comparative Analysis of Airflow Around a Rocket.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
The Comparative Analysis of Airflow Around a Rocket.
The Efficiency of Flexible Solar Panels and Changes in the Earth’s Magnetic Field at Altitude.
University of Florida Rocket Team Critical Design Review Presentation.
Critical Design Review Presentation Jan. 20, 2011.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Flight Readiness Review “Analysis of Atmospheric gamma radiation as a Function of Altitude by means of Scintillator Probe” St. Thomas High School, Houston,
The Rocket Men Project One Giant Leap. Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom Body Tube Length-
D EPARTMENT OF M ECHANICAL AND A EROSPACE E NGINEERING HIGH POWERED ROCKETRY CLUB PDR PRESENTATION 1.
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
NUSTA RS NASA Student Launch MAV Challenge 2016 Preliminary Design Review 6 November 2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
FAMU PDR Presentation. Table of Contents Vehicle dimensions, materials, and justifications Static stability margin Plan for vehicle safety verification.
Critical Design Review Presentation Project Nova.
D EPARTMENT OF M ECHANICAL AND A EROSPACE E NGINEERING HIGH POWERED ROCKETRY CLUB CDR PRESENTATION 1.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
Preliminary Design Review Clear Lake High School Team Rocket.
Project Aegis Preliminary Design Review Team Members:
Preliminary Design Review Presentation
College of Engineering
Critical Design Review Presentation
November 7, 2014.
November 7, 2014.
LESSON LD02 The Model Rocket
Final Readiness Review
LESSON LD02 The Model Rocket
Plantation High SL team 1
Presentation transcript:

Launch Vehicle Propulsion Payload Recovery

Vehicle Dimensions Total length of inches 4.0” Airframe (3.9” Inside diameter) Fin span of 3.91” Separates into three sections Top Nosecone Payload Vertical Wind Turbine Middle Drogue Parachute Piston Altimeters Bottom Main Parachute Motor (Plugged) Fins

Materials- Airframe Entirely BlueTube 2.0 Heat and Humidity Resistant Lightweight compared to alternatives ProductSample LengthWeightWeight per inch Blue Tube3" x 48" x.062 wall577.9 grams12.04 grams per inch Plain phenolic3" x 48" x.062 wall423.9 grams8.83 grams per inch Glassed phenolic 3" x 48" x.062 wall868.8 grams18.1 grams per inch Filament wound fg 3" x 48" x.062 wall907.2 grams18.9 grams per inch Source: Alwaysreadyrocketry.com

Materials- Airframe Exceptionally strong material Vulcanized paper fiber with water resistant resin Tubing was “a component inside a warhead of the 155mm Howitzer, and 105mm Abrams Tank ordinance” –Always Ready Rocketry Is expected to withstand forces of launch

Materials- Airframe Maximum load of 3079 lbf (3 inch tube) Peak Stress of 5076 psi (3 inch tube) Impact resistant Source: Apogeerockets.com Source: Alwaysreadyrocketry.com

Materials- Fins Fins –Composite board with hardwood edging –Fiberglass outer layer –Honeycomb Nomex composite inside –Must have edging to airfoil Photos from GiantLeapRocketry.com

One-Third the weight of G10 Fiberglass Retains rigidity Airfoil edging will be of birch plywood Surface will be scored with hobby knife and drilled into to increase surface area Through-the-Wall assembly to the motor mounting Materials- Fins

Materials- Epoxy Loctite 30 minute Epoxy –All motor mounting and internal parts –Allows for absorption time –Less brittle, stronger bond Loctite 5 minute Epoxy –Fin Fillets

Bulkheads & Centering Rings 4-ply birch plates Each 3/16” thick All rings and bulkheads will be double thick Overall stronger plate More surface area to glue to

Materials- Other Vertical mounting boards –1/4” to 3/8”plywood –Used in payload and electronics bay Nose cone –Impact resistant plastic Tail cone –Urethane tail cone from Public Missiles to reduce drag

Stability Margin Stability margin of 2.01 calipers before launch Fins will be constructed last Fin size will be adjusted to keep this value

Stability Analysis 2.01 stability margin will allow for error Small drag forces from: –Nosecone screws –Solar panel’s edge –Pressure bleed off holes –Miscellaneous Margin will rise to 3.35 calipers after burnout

Vehicle Safety Verification Sub-scale launch Dec. 11 th (backup Dec. 18 th ) – Verifies stability and altimeter setup Strength tests on fins and bulkheads Heat, humidity, and warp testing – Oven, freezer – Soak in water First full scale launch in early February with dummy payload

Construction Safety All personnel trained to use power tools Two people working on a part minimum Gloves, aprons, and goggles during construction Masks when products with fumes are used –Epoxy –Paint

Launch Vehicle Propulsion Payload Recovery

Motor Selection Aerotech K700W Plugged forward closure MotorManufacturer Total Impulse (N- sec) Max Thrust (lbs) Burn Time (s) Average Thrust (lbs) Max Rocket Dry Weight* (lbs) K1050AeroTech K660Cesaroni K750Cesaroni K700AeroTech K828AeroTech K570Cesaroni K635Cesaroni * For rocket to reach 5,000 feet AGL Current projected dry mass = 15.4 lbs Will have room for error

Motor Selection Propellant from Giant Leap Rocketry Hardware from Apogee Rockets –AeroTech RMS-54/2560 casing –Plugged forward closure –Eyebolt threads for solid parachute mounting point Source: Apogeerockets.com

Thrust to Weight Ratio Thrust to weight = 6.81 to 1 with current plan Acceleration of 364 ft/s 2 on Launch –11.3 G’s Rail Exit Velocity = ft/s

Thrust Curve Source: ThrustCurve.com

Plan for Motor Safety Verification Inspect for any cracks or dents on casing Certified personnel assemble motor –George or Jack Sprague (Mentors) Inspect assembly Aerotech K700 motor is not a prototype and has been launched before

Launch Vehicle Propulsion Payload Recovery

Baseline Payload Design Measures voltage and current output of a flexible solar panel Observe changes in the strength of the Earth’s Magnetic Field LabPro Data logger records from all sensors simultaneously Accelerometer triggers data recording Data stored inside rocket, until retrieval

Payload Design- Structure Housed in the Modular Payload System (MPS) Three compartments Sensors secured with metal strapping All plywood Stainless steel support rods

Data Logging System LabPro Data Logger from Vernier Programmed to start taking data when accelerometer reads 7 G’s of acceleration Longer pad stay time, can take many readings from just ascent and descent Supplies power to all sensors Lithium AA batteries for reliable power source

Solar Panel System Solar Panel, current probe, voltage probe, resistors, and data logger Voltage probe in parallel around a 10 ohm resistor 30 ohm resistor in series to burn off voltage for sensors Current probe in series Solar panel leads go through airframe to sensors

Solar Panel

Flexible Solar Panel Two donated by FlexSolarCells.com for experiment

Magnetic Field System Vernier magnetic field sensor Isolated from all other electronics to reduce risk of interference Will measure a peak voltage when sensor points to magnetic South Rocket must spin so that we know it points South at some time

Magnetic Field Probe Field strength across the globe varies from 3.1 x to 5.4 x Teslas Typical variance in 25 nano Teslas on a given day in one location

Vertical Wind Turbine Magnetic Field sensor reads peak when pointed at magnetic south Catches horizontal wind and causes the rocket to spin

Significance Solar power is becoming cheaper and easier to integrate Viability of flexible solar on objects where direct sunlight is not always possible Magnetic field experiment could be used in the future for detailed data on the changes in the Earth’s magnetic field

Plan for Payload Verification System ground testing –Set up all sensors and record sample data –Will onboard electronics interfere with magnetic field sensor? Strength test components of MPS for the amount of G-forces it will go through Double check that systems working before launch Use new batteries before every launch

Launch Vehicle Propulsion Payload Recovery

Baseline Recovery System Design 24” TAC-1 Drogue Parachute at apogee –Backup ejection 2 seconds after apogee 84” TAC-1 Main Parachute at 700 feet –Backup ejection at 500 feet Swivels on each parachute Perfectflite MiniAlt/WD and HiAlt45K altimeters Radio transmitter for locating the rocket after landing

Recovery System Shock cord is 9/16” wide nylon strap –2000# rated –26’ on drogue 20’ on main Quick-Links for easier chute packing and repairs (if needed) U-Bolt parachute mounts Altimeter ejections have been staggered –Reduce risk of over-pressurizing airframe

Engine Burnout Primary Drogue Chute Ejection (at apogee) Backup Drogue Chute Ejection (2 sec after apogee) Primary Main Chute Ejection (700 feet) Backup Main Chute Ejection (500 feet) Flight Events and Ejections

Electronics Bay Each altimeter will have its own 9V battery and arming switch All connections will be secure so that no circuit breaks occur

Plan for Recovery Safety Verification Ejection charge ground tests in January Verify descent velocities with Rocksim Verify vertical wind turbine does not tangle cords 2000 lbs rated heavy-duty 9/16” nylon shock cord Altimeter testing in a vacuum chamber Verify function of radio transmitter in a ground test Use ohm meter to check ejection canisters before installing into rocket

Questions?