Differential Leveling

Slides:



Advertisements
Similar presentations
Earthwork Profile Leveling 1.
Advertisements

Contour Lines.
Levelling Checks.
Applying Profiling Leveling Techniques
Maintaining Gage Datum: Levels at Gaging Stations.
LEVELING (a most elevating passtime). The problem: I’m here standing on ground that’s metres above mean sea level I need to know the elevation.
Profile Leveling.
Levelling (continued) This presentation covers booking, reduction, calculation checks, actual and allowable misclosure and how we deal with an allowable.
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Applying Differential Leveling Techniques. Next Generation Science /Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.2 Determine the central.
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
Principles of Surveying
CHAPTER 3 LEVELING.
Profile and Differential Leveling
Differential Leveling
Writing Function Rules
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
1 Area Calculations. 2 Introduction  Determining the size of an area is a common problem of landscaping. Application of chemicals Amount of sod Number.
The Brunton Compass ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
Leveling Chapter 4. Why do we perform leveling surveys? To determine the topography of sites for design projects Set grades and elevations for construction.
Chapter (5) Leveling Introduction:
GUJARAT TECHNOLOGICAL UNIVERSITY BIRLA VISWAKARMA MAHAVIDHYALAYA (ENGINEERING COLLEGE) VALLABH VIDYANAGAR SUBJECT: ELEMENTS OF CIVIL ENGINEERING (CODE )
Chap 7 – Differential Leveling
Adjustment of Level Nets. Introduction In this chapter we will deal with differential leveling only In SUR2101 you learned how to close and adjust a level.
Chapter 4- Bench Checks1 Chapter 4 Bench Checks. Chapter 4- Bench Checks2 Before construction begins the BMs need to be checked. Why? From Design Phase.
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
Relative Positional Precision. 3.E.i. - Relative Positional Precision We know that every point located on a survey has an uncertainty in its location.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
1 TOPIC:- COMPUTATION OF BOUNDARY AREA NAMEPEN NO 1.RUCHIR MISTRY MIYANI DIKEN MOHIT KHANPARA MANSUR ADIL
Land Surveying Civil Engineering and Architecture
How to: Some Basic Principles for Leveling
Surveying 1 / Dr. Najeh Tamim
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Applying Differential Leveling Techniques
Chapter (5) Leveling Introduction:
DIFFERENTIAL – PROFILE LEVELING
Profile Leveling.
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Unit: Surveying Lesson: Differential Leveling
Topographic Survey Land Surveying Civil Engineering and Architecture
Surveying Equipment.
Engineering Surveying
Leveling Intro to Leveling.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Level Loop (or Closed Circuit)
Find: ZenithDA SDDA = [ft] 89 29’15” 89 46’30” D 90 14’30” A
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Angle, Distance, Traverse, and Leveling Errors
Find: Average Slope AD [%]
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Surveying a Level Loop Surveying a Level Loop
Differential Leveling
Leveling.
Surveying With Construction Applications, 7th Edition
LEVELING.
Writing Function Rules
Stream Crossing Bootcamp
Lecture 7.
Presentation transcript:

Differential Leveling

Introduction Differential surveying is used to determine the difference in elevation between two or more points. It is commonly used to establish the elevation of a benchmark referenced to an existing benchmark. It is also useful for comparing the elevation of several points or objects.

Differential Leveling Example An example of comparing the elevation of multiple points is setting the top of the forms before placing concrete. In common practice, a backsight would be recorded from the bench mark and the target would be set for the desired elevation of the forms. The rod holder would then place the rod at several point along the forms to determine if they were at the correct height.

Establishing A Benchmark Another use of differential leveling is establishing the elevation of a benchmark.  When the existing benchmark and the location of the new benchmark can be seen from one instrument position, the procedure is very simple.  The instrument is set up halfway between the points and leveled. A rod reading is taken on the existing benchmark, this is called a backsight. The backsight reading is added to the elevation of the benchmark to establish the instrument height (reference line).

Benchmark Example-cont. In this example the benchmark elevation is 850.47 feet and the backsight is 3.56 ft. The height of the instrument is:

Benchmark Example-cont. The instrument is rotated until it is aligned with the second benchmark. A rod reading (foresight) is recorded for the second benchmark. In this example the foresight is 5.21 ft. The rod reading is subtracted from the height of the instrument to find the elevation of the second benchmark. The elevation is: BM1 is 1.65 feet higher than BM2.

Benchmark Example TP When both benchmarks cannot be reached from one instrument position, turning points are used. Because a turning point is a temporary benchmark, it must be a stable structure. A backsight is taken on BM1. The 4.31 is added to the elevation of the bench mark to find the height of the instrument (104.31).

Benchmark Example TP-cont. A turning point is established and a foresight is recorded (4.92). The foresight is subtracted from the height of instrument to determine the elevation of the turning point (99.39) . Then the instrument is moved to a point between the turning point and the next station. In this example the next station is BM2.

Benchmark Example TP-cont. A backsight is taken on the turning point (4.22). The backsight is added to the elevation of the turning point to find the new instrument height (103.61). The instrument is rotated and a foresight is recorded on BM2.

Benchmark Example TP-cont. Tables are an excellent way of organizing numbers. Surveyors have developed a standard table for differential leveling. The foresight on BM2 (2.35) is subtracted from the instrument height to determine the elevation of BM2 (101.08)

Differential Leveling Table Five columns are used. STA = Station Identification BS = Backsight HI = Instrument Height FS = Foresight ELEV = Elevation The table for this example: STA BS HI FS ELEV BM1 4.31 104.31 100.0 TP 4.22 103.61 4.92 99.39 BM2 2.53 101.08 101.08 - 100.0 = 1.08 BM2 is 1.08 feet higher than BM1

Benchmark Example TP-cont. Assuming no errors occurred during the survey, BM2 is 1.08 feet higher than BM1. This is not a good assumption. Differential leveling uses three checks for errors.

Three Checks For Error Closing the loop Note check Allowable error check

1. Closing the Loop To close the loop the survey is continued back to the beginning. In the previous example, surveying from BM1 to BM2 resulted in a difference in elevation between the two benchmarks of 1.08 feet. Surveying from BM2 to BM1 should result in the same difference in elevation. Any difference in elevation for BM1 between the initial elevation of BM1 and the closing elevation of BM1 is error.

Closing the Loop Example The steps are the same. The instrument is moved and a backsight is recorded for BM2 (3.27).

Closing the Loop Example-cont. The instrument is rotated. A foresight is recorded on TP2 (2.21) .

Closing the Loop Example-cont. The instrument is moved between TP2 and BM1 A BS is recorded on TP2 (3.29).

Closing the Loop Example-cont. The instrument is rotated. The loop is closed by recording a foresight on BM1 (5.42).

The second check for error is called the note check. Differential Table When the closing data is entered into the table the first error check is completed. The second check for error is called the note check. The note check uses an equation: If the equation is true, there is no math error in the notes. If the equation is not true, the notes have a math error. What should you do if the note check is not true?

The note check statement is true. BM1i BM1c The note check statement is true. The 0.01 difference in the elevation of BM1i and BM1c is not caused by a math error in the notes

3. Allowable Error of Closure The third check for error is called the allowable error. Early surveyors realized that the sources of error were so large that it would be impossible to control for all of them. It is common practice for the agency/individual contracting the work to specify the acceptable level of error. Professional standards may also specify allowable error. A simple one is called the allowable error and it is based on an equation:

Allowable Error of Closure-cont. For the differential example, the distance between BM1 and BM2 was paced and a distance of 1.100 feet was recorded. A k value of 0.1 is acceptable for general work. Is pacing an appropriate method for measuring distance?

Allowable Error of Closure-cont. The actual error was 0.01 and the allowable error is 0.04, therefore the survey is acceptable.

The Complete Data Table

Allowable Error-cont. In this example the actual error was less than the allowable error. What should happen if the actual error is greater than the allowable error?

The data would be unacceptable. Allowable Error-cont. What would be the conclusion about the error in the data if a higher standard was used, k = 0.01. 0.01 > 0.004 The data would be unacceptable.