IBL temperature analyses Bart Verlaat 22 April 2015 1.

Slides:



Advertisements
Similar presentations
New Plate Baffle Water Flow. Quick Simulation Use triangular prism as rough estimate of a vane Uniform heat flux on each surface –600 kWm -2 on end face.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Chapter 3.2: Heat Exchanger Analysis Using -NTU method
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
Dimensioning of CO 2 cooling pipes in detector structures Pipe dimensioning & Flow distribution Detector Mechanics Forum Oxford, 20 June 2013 Bart Verlaat.
Applications Team Sensing Products
LHCb-VELO evaporator CoBra Calculation and feed through ideas. 18 February 2015 Bart Verlaat 1.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Heat load study of cryomodule in STF
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz 8 th International Workshop on DEPFET Detectors and applications.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
IBL cooling thermal chock incident 15 October The IBL cooling team.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
UT cooling discussion 3 december 2014
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
IBL cooling branch layout and commisioning 6 febryuary 2014 Jan Godlewski, Bart Verlaat, Tomasz Blaszczyk, Eric Richards, Lukasz Zwalinski, Sven Vogt,
Graham Beck 23 Jan Thermal QA Options for the Bare Stave (or Petal) Core ! This is about the production phase. ! Test Systems should be ~ identical.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Heat Transfer by Convection
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Stave thermal analysis Cooling connections CO2 warm Test
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Feedback on transfer line sizing and flow calculations for UT
Heat Exchangers and Condensers
VELO Thermal Control System
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Performance of an Automated Water Based Cooling System for CBM MuCh
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
TBM thermal modelling status
FP420 Detector Cooling Thermal Considerations
Ultra-light carbon fiber structures: evaporative tests
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
VELO Thermal Control System
Tests on a dummy facet of PIX upgrade using CO2 cooling
Aachen Status Report: CO2 Cooling for the CMS Tracker
Heat Exchangers Heat Exchangers.
Heat Exchangers Heat Exchangers.
Presentation transcript:

IBL temperature analyses Bart Verlaat 22 April

IBL temperature analyses Many steady state situations have been analyzed and compared with CoBra models –IBL powered vs unpowered operation –Several set-points Analyses of the ambient heat loads Boundary conditions from data to CoBra –Flow –Inlet temperature –Outlet pressure –Ambient temperature (Taken from cable temperature) –Ambient heat transfer in CoBra was matched to get similar results on ambient heat. Convective HTC: W/m2K Applied in CoBra: 35 W/m2K (Note that there is also direct contact in reality) Large offsets of the detector temperatures (NTC) have been observed. –NTC are calibrated in situ. Next steps: –Apply Bake-out measurements to CoBra as extreme case. 2

Thermal chain from detector to cooling system The pressure drop causes a temperature drop which depends on the received heat load. –Therefore the cooling pipe CO 2 temperature is not constant and has a heat load depended offset wrt the cooling set point 3 For the 14 staves the return manifold is the common temperature boundary Heatload + ambient SiliconC-foam Pipe wall CO 2 in tube Manifold CF-sheet Th. paste Glue HTC Flex line ΔP Accumulator = set point Transfer line ΔP UX15USA15 Ambient Offset wrt set-point temperature

The IBL CO 2 cooling system 4 Sensor label Stave # Flow dir Connected to stave a1A-C14 b2C-A3 c3A-C2 d4C-A5 e5A-C4 f6C-A7 g7A-C6 h8C-A9 i9A-C8 j10C-A11 k A-C10 l12C-A13 m A-C12 n14C-A1 xCooling system yAverage of all zCommon

Understanding the temperatures in IBL We had large offsets in the temperatures in the IBL –With respect to the CoBra model –With respect to common sense Investigation started to find out what was wrong 5 The offset between the close DCS and Cooling sensor make no sense (Calibration error?) Offset due to pressure drop and/or calibration

Cooling pipe NTC’s showed an offset wrt expectation The DCS NTC sensors show higher values than expected. A study of the data generated in the commissioning period was started to understand the nature of the offsets The used B-formula relation of the NTC show offsets up to 2°C at low temperatures with respect to the more accurate Steinhart-Hart method. The comparison of DCS and cooling neighboring sensors suspect another offset relation. –A recalibration of the cooling pipe and manifold sensors was done. 6 Reading from DCS and cooling system should be similar Offset of the used B-formula relation to the more accurate Steinhart-Hart relation

Calibration of cooling pipe NTC’s in sector 5 7 Connect 2 NTC ‘s to the patch panel near manifold box Connect 1 PT100 to the junction box and archive the data using the cooling system Cool the sensors all together in glycol bath

Copper block with a PT100 and 2 NTC sensors dipped in cold glycol stored in a Dewar. Tube to give a dry passage for wires. Dewar Calibration setup The glycol was cooled to -40ºC and warmed up slowly over time to calibrate over the full range

NTC offset measurement 2 NTC’s were cooled together with a PT100 in a cold glycol bath of initial -40°C. The full temperature range to room temperature was measured using the ambient heating of the Dewar. It took 3.5 days to go from -40°C to 21°C. 9 Offset in the calibration from the B-formula to Steinhart-Hart Opening of Dewar to speed up heating

Recalibration results 10 Measured offset of cooling pipe sensors Offset of B-formula (Now used in analyses) The offsets we see are due to a wrong calibration.

The ambient heat load in the IBL The gradients in the IBL depends on the heat load. –Detector dissipation –Ambient heat leak To compare the simulations with the IBL data the ambient heat like must be taken into account. There is a signature for the total adsorbed heat: –The enthalpy difference between x08 and x46, when x46 is in single phase –This is the total ambient heat leak of the IBL and the transfer line Estimating the IBL ambient heat leak –Previous data from junction box tests was studied to get an idea of the transfer line heat leak. –The measured ambient heat leak corrected with transfer line ambient heat leak prediction gives an rough estimate for the the IBL ambient heat leak. 11 UX15 Transfer line ambient heat leak relation

IBL Detector heat loads (measured and simulated) 12 CoBra HTC=35 W/m 2 K The measured IBL heat leak is in the same order as the transfer line heat leak

The concentric flex line 13 The heat exchange between in and outlet matches the liquid temperature to the outlet 2-phase gradient

The concentric flex line 14 The heat exchange between in and outlet matches the liquid temperature to the outlet 2-phase gradient

The concentric flex line 15 The heat exchange between in and outlet matches the liquid temperature to the outlet 2-phase gradient Indeed a good match

Set point = -30°C 16

Set point = -25°C 17

Set point = -20°C 18

Set point = -15°C 19

Set point = -5°C 20

Detector temperature offsets wrt set point 21

Temperature sensor offsets wrt CoBra model 22

Conclusion The temperatures in the IBL look reasonable when the NTCs are corrected: –The module NTCS corrected with Steinhart- hart instead of the B-formula. –The cooling pipe sensors with the calibration performed by the cooling team The cooling pipe temperature has an offset wrt the cooling set-point. The offset is heat load and temperature depended. 23