B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.

Slides:



Advertisements
Similar presentations
Performance reach of LHC beam dump B.Goddard: input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, F.Velotti, M.Barnes, C.Bracco, V.Senaj, M.Meddahi,
Advertisements

Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
FCC-hh Injection and Extraction
Beam Dumping System – Failure Scenarios Brennan Goddard, CERN AB/BT How the dump system can fail Catalogue of primary failures Failure classes and protection.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Changes to IR6 dump protection elements B.Goddard, W.Weterings, C.Maglioni, R.Versaci, T.Antonakakis, R.Schmidt, J.Borburgh, J.Blanco, plus many other.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
B.Goddard LHC Risk Review6 th March 2009 Beam dump dilution failure B.Goddard CERN TE/ABT On behalf of the LHC Beam Dump project team.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
Technology Department 1 TCDS material selection and qualification W. Weterings
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
K H Meß AT-MEL CARE HHH-2004 Session2 Machine Protection 1 Machine Protection Can the upgraded LHC be protected? Scenarios Intensity upgrade (from 0.58.
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam absorbers for Machine Protection at LHC and SPS
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
FHI experimental opportunities? FHI meeting 17/9/14.
R.Schmidt and J.Wenninger - Lumi ‘061 Rüdiger Schmidt Jörg Wenninger CERN LUMI 06 in Valencia / Spain Friday 20 October 2006 Machine protection for PS2,
Brennan Goddard CERN AB/BT LHC LUMI th October 2006 Beam transfer considerations The various mooted upgrades of the CERN accelerator complex up to.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Operating IP8 at high luminosity in the HL-LHC era
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LINAC4 ADVISORY COMMITTEE
Dependability Requirements of the LBDS and their Design Implications
Emergency dumping of proton and ion beams in SIS100 F
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
Introduction: FCC beam dumping system
LHC beam dump 7.56 TeV operation
Injection system design for high-energy circular collider FCC-hh
Septa requirements and suitable septa topologies for FCC
Case Study - Group 2 FCC-ee Top-Up Injection
Advanced Beam Dump for FCC-ee
FCC hh dump kicker - switch topologies and impact on beam
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Overview on LHC Machine Failure Scenarios
FCC-hh injection group 7
Initial Experience with the Machine Protection System for LHC
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
Beam-Induced Energy Deposition Studies in IR Magnets
LHC Injection and Dump Protection
2017 CAS Erice case study: Design of a beam dumping system for FCC
PS2 Injection/Extraction Layout
Protection against accidental beam loss at the LHC
CEPC-SPPC Beihang Symposium
Chamonix Workshop XIV CERN - 17th-21st January 2005
Kicker specifications for Damping Rings
Presentation transcript:

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design aspects, technological and operational limitations. The issues and challenges presented by the various LHC luminosity upgrade options are detailed, together with some possible upgrade paths. Thanks to V.Mertens, E.Vossenberg.

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Outline of talk Existing LHC beam dumping system –overview, parameters, design aspects and limitations; Issues and challenges of LHC luminosity upgrades –Extraction, dilution, absoption, protection; Possible beam dump upgrade paths Conclusion

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system - concept Loss-free fast extraction system –Laminated steel kickers; DC Lambertson septum; Dilution system –Laminated steel kickers; passive ~650m drift length. Beam dump (absorber) block –Graphite cylinder, steel and concrete shielding Protection devices –Graphite protection (dilution) for septum and LHC machine extract  dilute  dump

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present design - schematic layout 15 x MSD septa 15 x MKD kickers TCDS protection 10 x MKB kickers TCDQ protection TDE dump block Total ‘beamline’ length : 975m from kicker MKD to dump TDE

B.Goddard 08/11/04 HHH 2004 Workshop, CERN 40 m Present design - tunnel layout Total ‘beamline’ length : 975m from kicker MKD to dump block TDE Dump cavern

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present design – main parameters SystemInstalled length [m]Field [T]System kick [mrad] MKD extraction kickers MSD extraction septa MKBH dilution kicker110.85±0.14 MKBV dilution kicker110.85±0.14 Septum protection7-- Q4 / LHC protection12-- ParameterUnitValue Total beamline length (start MKD – end TDE)m975 Particle-free abort gap ss 3.0 Beta function at beam dump block TDE (H / V)m5000 Beam size at TDE - 1  (H / V) mm1.5 Sweep length on TDE facecm109 Maximum temperature in TDE graphite˚C˚C1250

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system – TDE absorber  0.7m  7.7 m C cylinder

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system – TDE absorber –Density is graded to minimise  T: graphite with  = g/cc –Full sweep  T = 1250 O C in the dump block (LHC ultimate 0.86 A, 7 TeV)

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system - protection –Unsynchronised dump would destroy septum and downstream elements –2 long (6m), low density (carbon) absorbers to intercept undiluted bunches

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system - limitations Extraction system –Intensity : not limited –Energy : 7.5 TeV by kicker and septum strength –Filling scheme : not limited (need 3  s abort gap) Dilution system –Intensity : not limited; –Energy : limited to 7.5 TeV by kicker strength –Filling scheme : fails for superbunch (sweep length)

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Present system - limitations Beam dump absorber block –Intensity : 1 A (at 7 TeV) with  T max of ~1500 O C –Energy : 7.5 TeV (at 0.7 A) with  T max of ~1500 O C –Filling scheme : not limited (if adequate dilution). Protection devices –Intensity : 1 A at 7 TeV by  T in septum and Q4 –Energy : 7.5 TeV (at 0.7 A) by  T in septum and Q4 –Filling scheme : protection fails for superbunch.

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Increasing Intensity to 1.7 A - issues Extraction system –Kicker - no problems (unless RF heating??). Feasible –Septum – no problems. Feasible Dilution system –x2 sweep length. Feasible Beam dump Absorber block –Reduce  T max by reduced C density. Feasible Protection devices – Reduce  T max by reduced C density. Feasible

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Increasing Energy to 14 TeV - issues Extraction system –Kicker x2  B.dl – x2 length or x2 rise-time (6  s). Feasible –Septum x2  B.dl – x2 length. Feasible Dilution system –x4 sweep  x4 kicker f 0 ; plus x2  B.dl  x8 length. Difficult –Increase dump tunnel length Difficult Beam dump Absorber block –Reduce  T max by reduced C density – x4 length. Difficult Protection devices – Reduce  T max by reduced C density – x4 length. Difficult

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Superbunch with 0.86 A - issues Extraction system –Kicker - no problems. Feasible –Septum – no problems. Feasible Dilution system –x100 sweep length. Impossible Beam dump Absorber block –Reduce DT max with C density – increase length. Feasible Protection devices – Dilute full beam current without damage. Impossible

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Upgrades – Higher I at 7 TeV Total intensity in distributed bunches Upgrades required for dump system –Increase sweep length (higher f 0  more dilution kickers) –Upgrade dump block (longer, lower density C); –Upgrade protection devices (longer, lower density C, more r ). Feasible for 1.7 A with ‘modest’ upgrades (e.g. avoiding civil engineering)

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Upgrades – 14 TeV Intensity in distributed bunches Considerable upgrades required for dump system –Increase kicker and septum strength (6  s kicker rise time OR x2 kickers; x2 septa) –Increase dilution sweep length higher f 0, more kickers OR SC dilution quadrupole OR longer beam dump tunnel –Upgrade dump block (longer, lower density) –Upgrade protection devices (longer, sacrificial elements) Main Challenges –Beam dilution and energy deposition in dump block (small spot) –Machine protection for failure cases (slower rise time bad)

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Upgrades – superbunch All intensity in 1  s superbunch at 7 TeV Major dump system upgrades required –Dilution with SC quadrupole –Upgrade dump block (longer, lower density C, larger diameter) –Lengthen (+500m) and possibly widen dump tunnel; new cavern –Sacrificial protection devices OR 100% reliable ‘active’ machine protection… Main challenges –Achieving sufficient dilution (sweeping beam impossible) –Machine protection against synchronisation error

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Dilution with spiral sweep 108 cm sweep length 400 cm sweep length Increase dilution kicker frequency and sweep length –14 to 56 kHz… would require ~4 times more kicker length –At 7 TeV would allow currents of ~3 A in distributed bunches –At 14 TeV would allow ~0.8 A in distributed bunches

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Dilution with SC quadrupole Present optics  max ~5km,  ~1.5mm 20 m 200 T/m –Works for any filling pattern :  constant at ≈ 20 mm (need ‘squeeze’) –Need extra 500 m beam dump tunnel…. –Quad design ~OK : L T/m, ~70mm aperture –Very orbit sensitive : 2 mm  0.35 mrad  ~0.4 m at dump (1150m drift). Absorber block size :  ≈ 1.5 m (±0.5 m orbit, ±0.25 m for 8  beam) Dilution quad  max ~1000km,  ~20mm

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Protection – difficult with increasing E –Low material density essential to avoid material damage –More total material required to dilute energy density –Very long objects as a result… –10 7 dilution factor, need ~16 r of C 1.8 g/cc, or ~6 m at 7 TeV. –For 10 7 at 14 TeV, ~0.8 g/cc to avoid damage  14 m. –Some optimisation with graded density to get more r Peak GeV/cc in Cu vs beam size at 450 GeV and 7 TeV  T and density in LHC diluter for 7 TeV sweep (47 bunches)

B.Goddard 08/11/04 HHH 2004 Workshop, CERN Conclusion Dump upgrade for ~1.7 A at 7 TeV looks feasible –Some changes to dilution, absorption and protection Upgrading for 0.8 A superbunch is more difficult: –Achieving sufficient dilution to allow safe absorption (SC quadrupole dilution, absorber, tunnel, cavern, orbit…) –Machine protection (use sacrificial elements? depends on reliability…)