Barriers to Developing Small Scale Hydropower in the Philippines A Presentation for the Climate Change Information Center Dec. 10, 2002.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
ROLE OF THE GOVERNMENT.
Part 6 Financing the Enterprise © 2015 McGraw-Hill Education.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
FISCAL REGIME OF MINING PROJECTS UNDER THE PHILIPPINE MINING ACT OF 1995.
Basic Investing- Bonds A debt investment in which an investor loans money to an entity (corporate or governmental) that borrows the funds for a defined.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
DEBT, PRIVATIZATION & Commercialization of Essential Services These are intimately linked –  Debt creates the “need” and justification for privatization.
Unlocking value from existing utility assets NARUC Meeting – February 2012
CHAPTER 8 BOND MARKETS. Copyright© 2003 John Wiley and Sons, Inc. Capital Markets Economic purpose -- brings together long- term (over 1 year) borrowers.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
October 2004 Wind Power in Denmark How did it start?
Encouraging Green Power: Cooperation between the Private Sector and Government Avi Brenmiller, May
Power Factor: What Is It and Estimating Its Cost Presented by:Marc Tye, P.E APPA Business & Financial Conference September 21, 2004.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Barriers Identification for Wind Power Generation Technology Transfer in China By Li Junfeng Director of Center for Renewable Energy Development January.
Small Renewable Net Metering - An Investor Owned Utility Perspective John R. Grimwade Senior Director Strategic Planning & Development Presentation to.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
International Conference on Co-operation in the Hydropower Sector between Bhutan and India New Delhi, th September 2010 Rinzin Dorji SE,
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Financing Urban Public Infrastructure
Possible Modalities of Government Support for Private Clean Energy Investments/Financing Government support could be in different forms depending on types.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
POLICIES AND PROGRAMS ON RENEWABLE ENERGY Prospects for Small Scale Clean Development Mechanism Department of Energy.
FINANCIAL SERVICES… Presented by: Ruchika Sharma.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy March 2005.
March 2010 Developing Community Hydro Schemes in Oxfordshire Alison Wilshaw Renewables Advisor TV Energy.
Sustainable Cities and Infrastructure –––––––––––––––––––––––––––––––––––––––––––– Low Carbon Manufacturing, Technology Innovation and the Quality Standard.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
Cash Flow for Emerging Companies. Our Mission To provide a complete package of financing and services for qualified companies at a competitive cost enabling.
Short Term Financing FINC5880 Spring 2014 Shanghai- week 7.
Part 4 PowerPoint Presentation by Charlie Cook Copyright © 2003 South-Western College Publishing. All rights reserved. All rights reserved. Finding Sources.
FINANCING WIND POWER PROJECTS. Project Financing is the financing of long term projects based upon a complex financial structure where project debt and.
© 2012 Cengage Learning. All Rights Reserved. Principles of Business, 8e C H A P T E R 3 SLIDE International Business Basics The Global.
“Gentlemen prefer bonds.” -Andrew Mellon. Learning objective: Understand what bonds are. Know the pros and cons of bonds. Know the types of bonds.
1 Renewable Energy Purpose of the Power Purchase Agreement (PPA) Nebojsa Arsenijevic, BREP Manager.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Catanduanes, Philippines Lower Dugui Mini Hydro Power Plant.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Distributed Generation and Energy Storage in the Philippines Rafael L. Abergas Manager Planning and Technical Services Department Small Power Utilities.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Financial Markets, Instruments, and Market Makers Chapter 3 © 2003 South-Western/Thomson Learning.
Financing Considerations for Renewables and Energy Efficiency Projects By Guido Alfredo A Delgado August 28, 2006 FUTURE ENERGY SCENARIOS TOWARD SUSTAINABLE.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
Page 1 Implemented by Up-Scaling of Wind Power in Vietnam AHK Business Trip “Wind Power in Vietnam” Ho Chi Minh City, 23 November 2015 Peter Cattelaens.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
Third-Party Solar Financing Options in New Hampshire 1.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Firms and the Financial Market Chapter 2. Slide Contents 1. The Basic Structure of the U.S. Financial Markets 2. The Financial Marketplace – Financial.
Integrated Electric Utilities formed 1900s NPC created 1936 Electric coops created NPC developed nationwide grid Generation nationalized to NPC Electric.
FINANCIAL SUSTAINABILITY OF WSPs: Overcoming the Barriers Eng. PETER NJAGGAH WASREB, Kenya Innovative Water Sector financing.7 th – 12 th November 2011,
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
Access to Sustainable Energy for LAC: Solutions to Regional Challenges Structured and Corporate Finance Department Rachel Robboy Pr. Investment Officer.
Residential Solar Investment Program Installer Discussion Solar Installer Meetings June 26-27, 2012.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Money Markets Shuyan Wu Yonsei GSIS Apr
Egypt’s Electricity Subsidy Removal and the Unified Electricity Law; Paving the Way for Renewables SME Growth.
Financing of Solar power plants
Explain what the term soft loans mean.
Franchise Agreements: An Opportunity to Promote Clean Energy in Illinois Alexis Cain USEPA, Region 5.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Opportunities for Local Energy
Presentation transcript:

Barriers to Developing Small Scale Hydropower in the Philippines A Presentation for the Climate Change Information Center Dec. 10, 2002

Barriers to Developing Small-Scale Hydropower in the Philippines Summary Introduction to HEDCOR Mini-hydropower development in the Philippines Barriers to developing mini-hydropower in the Philippines

About Hedcor Hedcor Hydro Electric Development Corporation Is an affiliate of Aboitiz Equity Ventures Owns and/or operates 14 mini-hydro plants Total generating capacity of about 39 MWs Generating about 150 GWhrs annually

About Hedcor Hedcor O&M contractor of 70 MW Bakun AC hydro plant 1 st and only BOT hydro project in the Phils.

About Hedcor Hedcor Mini Hydropower Development (design, construction, maintenance & rehabilitation)

About Hedcor Hedcor Fabrication & Machining Watershed Management Liaisoning

About Hedcor Hedcor’s vision: We lead in the promotion and development of clean energy.

Small-Scale Hydropower Development in the Philippines 3 laws & a code that affected the development of mini-hydropower: R.A Mini-hydroelectric Power Incentives Act R.A – Electric Power Industry Reform Act R.A B.O.T. Law National Grid Code

Mini-hydroelectric Power Incentives Act R.A.7156 Mini-hydroelectric Power Incentives Act defines mini-hydro as: 100 kws < MINI < 10 MWs Micro-hydro < 100 KWs

Mini-hydroelectric Power Incentives Act Republic Act 7156 Grants incentives to mini-hydro developers (tax free importation of eqpt.) Obligates NPC to buy generation at avoided cost Vat-exempt status for mini-hydro Special Privilege Tax of 2% Enacted September 1991

Electric Power Industry Reform Act REPUBLIC ACT 9136 The Power bill was suppose to bring transparency. Deregulation, privatization & competition were to lower cost to “true cost of power” Instead we have higher subsidies

Electric Power Industry Reform Act REPUBLIC ACT 9136 SEC. 2. (h): To promote the utilization of indigenous and new and renewable energy sources in power generation in order to reduce dependence on imported energy. SEC. 37. (e) (i): Encourage private sector investments in the electricity sector and promote development of indigenous and renewable energy sources. No specific IRRs

Build Operate Transfer Act REPUBLIC ACT 6957 & 7718 Provided a framework of risk sharing between the private developer and GOVERNMENT Developers could negotiate BOT contracts w/ LGU’s, government agencies and GOCC’s Typically, a developer bids for a contract, constructs and operates the project for 25 yrs, and then turns the project over

National Grid Code The Code that all power plants comply with: SCADA requirements Tele-protection requirements Communication requirements

Challenges in Developing Hydropower MARKET Most mini-hydro schemes are in remote areas and therefore usually in coop franchises Electric coops have small loads and poor load factors Run-of-river hydro schemes cannot maintain firm capacity whole year round

Challenges in Developing Hydropower MARKET Most mini-hydro schemes are in remote areas and therefore usually in coop franchises Only a handful of electric coops are bankable

Challenges in Developing Hydropower WHEELING POWER High cost of wheeling power: –Transmission rate:P –Sub-transmission rate: P0.0362

Challenges in Developing Hydropower WHEELING POWER The wheeling fee is based on the monthly peak demand.

Challenges in Developing Hydropower WHEELING POWER The customer’s demand charges will only be reduced if the generator is able to generate at a firm level for the entire billing period

Challenges in Developing Hydropower Finance Long term loans at developmental rates are not available.

Challenges in Financing Mini- hydropower Finance Development banks receive foreign loans at developmental rates to help promote the development of mini-hydropower And lend to developers at near commercial rates Full collateral requirements

Challenges in Financing Mini- hydropower Finance Commercial banks are unfamiliar with hydropower projects Uncomfortable taking hydrological risks Required parent company guarantee More expensive than rates extended by development banks

Challenges in Financing Mini- hydropower FINANCE When we started (JEXIM): 15.5% per annum (+ GRT) 8 yr term – 21 equal quarterly payments 3 yr grace period on principal fully secured by parent company –NO project financing available

Challenges in Financing Mini- hydropower Probable commercial banking terms today: banks are not very excited to lend to power projects 90-day T-bills + 2.0% spread or about 12.0% (exclusive of GRT) –must be fully secured + parent guarantee –70/30 debt equity requirement –Project finance using local currency not available

Challenges in Developing Mini- hydropower Suggested measures to promote the development of mini-hydropower: Create a market –require utilities to purchase X% of their consumption from NRE’s –public awareness campaign on clean energy

Challenges in Developing Mini- hydropower Suggested measures to promote the development of mini-hydropower: eliminate or reduce the wheeling fees for NRE’s charge wheeling fees based on average monthly use (i.e. kwhrs/hrs x rate)

Challenges in Developing Mini- hydropower Suggested measures to promote the development of mini-hydropower: DOE/DENR to initiate steps to augment the revenue of mini-hydropower developers –possibly through CDM

Challenges in Developing Mini- hydropower Suggested measures to promote the development of mini-hydropower: exempt mini-hydropower plants from technical requirements imposed on bigger plants (i.e. spinning reserve, back-up reserve, SCADA, reactive power capability, system frequency limits, etc.)

Potential Mini-hydropower Sites Identified LUZONCAPACITY Wangal1.0 MW Irisan 11.6 MW Irisan MW Talecbed0.5 MW Gambang2.0 MW Irisan 21.6 MW Abdao1.2 MW Eddet 12.8 MW Anneng0.8 MW Eddet 33.0 MW Kagaling2.0 MW Lomboy1.5 MW Tuba 21.0 MW Total20 MW LUZONCAPACITY Bineng 43.0 MW Ampusongan2.0 MW Omico 10.9 MW Suyoc1.5 MW Omico 31.5 MW Upper Ampohaw 1.0 MW Upper Labay0.75 MW Irisan MW Lower Ampohaw 1.6 MW Adaoay1.5 MW Ampohaw B1.2 MW Tuba 31.0 MW John Hay1.2 MW Total17.9 MW VISAYAS AND MINDANAO CAPACITY Pamplona0.55 MW Cambagang2.5 MW Tandik8.0 MW Camanlangan5.2 MW Sibulan 1, 2, MW Tamugan5.4 MW Cateel5.0 MW Total54.25 MW TOTAL POTENTIAL MWS