Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Co-generation Cogeneration is an attractive option for facilities with high electric rates and buildings that consume large amounts of hot water and electricity.
“Transforming construction in Mongolia using Supplementary Cementitious Materials” Mr. YEROOLT BAYART Director of International Cooperation Division, Ministry.
Energy Project Development A Discussion on State and Federal Incentives Presented By Dennis Plaster, General Manager.
CARBON CONTRACTS - the PCF experience September 30, 2002.
6.1 Module 6 Reporting of Mitigation Assessments in National Communications Ms. Emily Ojoo-Massawa CGE Chair.
Methodological Issues Arising Across Different Types of Energy Efficiency Projects QualityTonnes Kevin James Montreal December 3, 2005.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
CAPABILITY OF INCREASING ENERGY EFFICIENCY IN EU HOUSING Nataliya Anisimova Czech Technical University in Prague
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Introduction.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
What Goes Into a Good PIN and a PCF Project? PCF Training Workshop on Project Formulation under the Clean Development Mechanism Hanoi, Vietnam September.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Chapter 10 - Biofuels. Introduction Existing standards for carbon accounting Forestry schemes as carbon offsets Biomass energy in place of fossil fuels.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
Climate Change Related Activities in Romania Dumitra MEREUTA Ministry of Environment and Sustainable Development - June 2007, Bucharest -
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Energy Reduction Initiative
Overview of Carbon Markets Voluntary & Compliance Markets: Existing Carbon Reduction Units Vladimir Litvak RBEC Energy and Environment Practice Leader.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Greenhouse Gas Emission Reduction and Industry The World Bank March 2007.
1 Holly Krambeck, Carbon Finance Unit; World Bank 27 May 2010 Using Inventory Tools to Support Energy Efficient Cities Citywide Methodology Transport Module.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Implementation of the Kyoto Protocol: what does it mean for bioenergy and C sequestration? Implementation of the Kyoto Protocol: what does it mean for.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
Low carbon heat international showcase Edinburgh The Public Sector Role in Developing Area-wide Low to Zero Carbon Heat 18 th November 2014.
R. A. Zakhidov Application of Kyoto mechanisms in attraction of carbon investments for implementation of projects on thermal utilization of solar energy.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Carbon Revenue and MFIs: Making it Work Marco van der Linden Ramesh K. Gautam.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Standards and Certification – A must in the Green World Andrew Nourafshan Progam Analyst Center for Resource Solutions Green Trade Network Summit September.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Systems Analysis Certificates for developing renewables and efficient use of energy By Senior research specialist Poul Erik Morthorst Systems Analyses.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Microgeneration Karl Letten – Change Programme Support Officer (Environment) Change Management.
Energy Efficiency and Conservation Direct Use Program Proposal Washington Gas Light Co. For Discussion with EmPOWER Maryland Stakeholders January 27, 2012.
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Cost Efficient Emissions Reduction
Prices for Emission Reductions
Development of a Solar Water Heater NAMA Concept Belize
Kyoto Protocol.
Possibilities for promoting environmental protection projects
Presentation transcript:

Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante

Project Idea Note (PIN) Type and size of project Location Amount of greenhouse gas (GHG) reduction Credit life time Certified Emission Reductions (CER)/Emission Reduction Units (ERU) or verified Emission Reduction (vER) price in US$ or €/ton CO 2 e reduced Financial structuring Socio-economic or environmental effects/benefits

Project Defined Project Description type, location and schedule Objective of the project Description and proposed activities Technology required

Project Developer Name Category Relevant experience Location Contacts

Project Sponsor Name Organizational category Main activities Summary of financials Type of project Location of project Expected schedule Position of country regarding Kyoto Protocol

Environmental & Social Benefits Baseline scenario Greenhouse gases CO 2 Sequestered Specific global and local environment benefits Socio-economic aspects Environmental strategy or priorities of host country

Finance Project cost estimate Sources of finance Sources of carbon finance CER/ERU or vER price Total Emission Reduction Purchase Agreement (ERPA) value

Specific Project AM0020 – “Monitoring methodology for water pumping efficiency improvements”

APPLICABILITY This methodology is applicable to project activities that seek:  reduce GHG emissions by explicitly reducing the amount of energy required to deliver a unit of water to end- users in municipal water utilities  Improve energy efficiency in the overall water pumping  include reducing technical losses and leaks  the energy efficiency of the pumping scheme, which consume electricity from the electricity grid, where: oThe efficiency (water and energy) of existing schemes is being improved or oA new scheme is being developed to completely replace the old scheme which will no longer be used. This methodology will apply to the new scheme only up to the measured delivery capacity (annual amount of delivered water) of the ole scheme: oThe methodology is NOT applicable to project activities cases where entirely new schemes are built to augment existing capacity. This will ensure that only emissions reductions up to the existing capacity of the system will be considered. oThe baseline methodology shall be used in conjunction with the approved monitoring methodology AM0020 (“Monitoring methodology for water pumping efficiency improvements”)

PROJECT ACTIVITY Efficiency improvement in water pumping using electricity from the grid. Applies in current GWCL case

PROJECT BOUNDARY The project developer will need to clearly define the boundary of the system in question. This could be the boundary of an entire municipal water system, or a major pumping station. Defining the boundaries of the system in question allows the project implementers to develop an adequate metering and monitoring system to determine water entering the boundaries of the system, water being delivered out of the system and the energy used to move it from start to finish. It also allows the project developer to ensure that the project boundaries do not change significantly over the course of the project. In situations were multiple schemes are being upgraded, the project developer must monitor each scheme separately and calculate the emissions reductions for each separately. The project boundary will extend from the point from the point of water intake to the system in question, including all pumping stations (major pumping station if the project boundary is the last one) to the delivery point from the system in question. Supplemental pumps, booster stations and other sources of power consumption are included. It to be noted that pumps not metered or covered by the water utility, as in bulk supplier, will be included in the project boundary only if they are (1) subject to the project implementation and (2) exclusive to the defined water system. Project boundary in terms of gases and sources is CO 2 from electricity generation.  Map of the system covered  All inflows  Outflows  The size of all of the major pipelines.

BASELINE A typical carbon emissions baseline is established by multiplying the pre-project efficiency ratio with the total post-project water volume delivered and the carbon emission factor.  emissions in the baseline scenario in year (kg CO ² /yr)  Total post-project water volume delivered in year (m³/y)  Pre-project efficiency ratio (kWh/m³)  Carbon emission factor for the electricity grid in year (kg CO ² /kWh/y)  Total amount of electricity required to move water (kWh b ) in the baseline period  Total volume of water (m³) pumped in the baseline period

OPERATING MARGIN EMISSION FACTORS Simple OM, or Simple adjusted OM, or Dispatch Data Analysis OM, or Average OM.

EMISSION REDUCTIONS Annual emission reductions (ER) based on,  Baseline emissions  Project emissions

MONITORING METHODOLOGY The monitoring methodology requires monitoring of the following:  Water from the entire scheme entering in the water system post-project will need to be metered and the total numbers adjusted accordingly to make sure that increases in water supply from new scheme are not counted.  Energy in the form of kWh required to move the water within the boundaries of the system.  Carbon content of the electricity employed by the water system calculated using the combined margin approach outlined in ACM002.

end of presentation thank you