Preparing a CDM Project Design Document (PDD) Michael Gerbis, P.Eng. President The Delphi Group.

Slides:



Advertisements
Similar presentations
SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
Advertisements

4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
S E R V I N G C A N A D I A N S A U S E R V I C E D E S C A N A D I E N S This may not necessarily represent the view of the Government CBA/Justice Annual.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
GHG PROTOCOL INITIATIVE Emerging Project Accounting Standards & Guidance Mahua Acharya, WBCSD World Resources Institute.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Expertise everyday, everywhere Verifying Sinks and Bio-energy Projects Irma Lubrecht Société Générale de Surveillance.
Common Carbon Metric for Measuring Energy Use & Reporting Greenhouse Gas Emissions from Building Operations A tool developed by GHG Protocol and UNEP-SBCI.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities Review of approved and proposed.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Review of CDM methodology development process Annual Meeting of the Host Country Committee on Carbon Finance Washington DC, 15 February 2005 Lasse Ringius.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
Bundling small scale projects Principles of bundling Bundling Documentation Examples and their applications in Carbon Finance projects Bundling (& “de-bundling”)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Small-Scale Projects Under JI
Presentation transcript:

Preparing a CDM Project Design Document (PDD) Michael Gerbis, P.Eng. President The Delphi Group

In Business since 1987 Complexity, Creativity, Change Business Units: Health and the Environment Business and the Environment Clean Energy Markets and Technologies Climate Change Strategic Analysis Policy assessment & development GHG Mng Services

Overview PDD 101 What is a Project Design Document? Key Components Baselines Monitoring Plans Lessons Learned Sources of Information

What is a PDD? A PDD: presents information on the essential technical and organizational aspects of the project activity is a key input into the project validation, registration, and verification processes required for CDM projects under Kyoto

Key Components of a PDD A. General description of project activity B. Application of a baseline methodology C. Duration of the project activity / Crediting period D. Application of a monitoring methodology and plan E. Estimation of GHG emissions by sources F. Environmental impacts G. Stakeholders’ comments

Lessons Learned* Project participants not identified clearly Insufficient description of the technology Lack of logic and consistency in PDD Small-scale selected for a large-scale project Compliance with local legal requirements not covered sufficiently Insufficient information on the stakeholder consultation process * Source: CDM PDD Guidebook: Navigating the Pitfalls, DNV & UNEP

Baselines Lesson Learned It is important to have a clearly defined baseline as early as possible; it is especially important to recognize how conditions may change a project's estimated emission reduction volume and to integrate these scenarios with a realistic project performance. - TransAlta

What is a Baseline? A baseline is a hypothetical scenario that represents what would have happened in the absence of the project (i.e. business as usual). A baseline methodology is used to estimate baseline GHG emissions that will be compared to project emissions to determine overall emission reductions

Application of a Baseline Methodology CDM project proponents have two options: Use an existing approved methodology Simpler approach Only if a relevant methodology exists Develop a new methodology Additional effort required A new monitoring methodology and plan (Section D) will also be required

Application of a Baseline Methodology In either case, in the PDD: Identify the methodology to be used (either an existing or new methodology) Justify why the methodology is relevant for the specific project Describe how the methodology will be applied in the project context Describe how project GHG emissions will be reduced below baseline emissions Describe how the baseline boundary in the methodology is applied to the project activity

What is a Baseline Study? Is a systematic and methodological analysis to determine the most likely development scenario and its evolution in time in absence of the Kyoto Protocol mechanisms Is the basis for the projection of emission reductions Credibly demonstrates environmental additionality Provides all arguments, facts and evidence in support of the determined project baseline, so that the baseline can be validated Required for the Project Design Document

Examples of Baseline Variables Accessibility & reliability of relevant data Location, type and size of project Existing and planned policies Available resources Lesson Learned Generally accepted data is vital, particularly when it comes to baselines. This will guard against future questioning of validity, and requests for a more objective baseline (i.e., one not established by the company looking to validate the project). Transparency is key. - Mikro-Tek

Complexities of Baselines Baselines are complex & difficult to determine Inherently speculative – it attempts to predict what will not happen Forecasting uncertainty Business-cycle forecasting is extremely difficult Baseline level of emissions tend to be overstated

What is Additionality? “Additionality” is the key eligibility criterion for CDM projects Interpreted as “environmental additionality” Assessed against a baseline Emission Reductions = hypothetical baseline emissions – actual (CDM project) emissions

Project Boundary Sets the physical area Identifies sources and sinks Anthropogenic; Includes all GHG that are significant and attributable On-site Off-site The project boundary defines the area within which emissions reductions occur

Project Boundary Off-site Transportation of fuel or Fugitive Gas Emissions - Pipelines Takes into consideration “significant” and “reasonably attributable” including both: Boiler Emissions or Flaring Emissions On-site emissions reductions that arise immediately from the project activity itself Off-site emissions reductions occur upstream or downstream of the project

Leakage GHG reductions or increases that result from the project outside the project boundary Identification and quantification of leakage remains one of the most challenging technical issues related to the development of GHG mitigation projects. Can occur at a local and international levels Activity shifting Outsourcing Market shifts in supply and demand Inaccurate or incomplete baseline (although should be seen as baseline fault not really leakage)

Set Crediting Period Two Options An initial period of 7 years (may be renewed a maximum of two times, for a total of 21 years) Renewals are contingent on re- validation of the original baseline. Baseline may need to be updated with newly available data A maximum of 10 years with no option of renewal

Calculate Emissions Reductions Determine project boundary Project & Baseline Emissions Estimate Net Emissions Reductions Adjust Results for uncertainties and deduct any possible “leakage”

Emission Reductions Baseline emissions Project emissions Lessons Learned Host country expertise, particularly in sequestration projects, is vital. These experts possess information with respect to best practices and the establishment of baselines that can save both time and considerable expense. – Mikro-Tek

Lessons Learned* Insufficient explanation of baseline scenarios Insufficient explanation of project additionality Baseline information not sufficiently supported by evidence and/or not referenced sufficiently Major risks to the baseline not identified/ described The project boundaries not defined clearly Project and/or crediting start date unclear * Source: CDM PDD Guidebook: Navigating the Pitfalls, DNV & UNEP

Monitoring Plans Lessons Learned Contracting is one of, if not the most, essential steps in the CDM process. Specifically, it is of paramount importance that all contracts (e.g. between buyer and seller of CERs) are legally binding and have an adequate process for arbitration - TransAlta

“Continuous or periodic data collection to check the accuracy of the baseline and project emissions” Required for Validation and Project Design Document (attachment) Builds on Baseline Study Revisions need to be validated Monitoring Basics

Application of a Monitoring Methodology and Plan Provides information on how to collect/ archive data needed to: Estimate/measure emissions within the project boundary; Determine the baseline; and Identify increased emissions outside of the project boundary (i.e. leakage) The Monitoring methodology describes how to prepare a project-specific monitoring plan

Application of a Monitoring Methodology and Plan As with baseline methodologies, project proponents have two options: Use an existing approved methodology Simpler approach Only if a relevant methodology exists Develop a new methodology Additional effort required Necessary if a new baseline methodology is being used

Monitoring Plan A description of the project activities Key parameters involved Emission sources to be monitoredSpecific monitoring process √ The data sources used to calculate baselines √ All sources of GHG’s √ Processes & procedures for data collection, measuring, reporting √ Technical equations √ Roles and responsibilities of participants √ Quality assurance and control procedures √ Record keeping systems √ ER model and calculation procedures

Simple Examples of Data Monitoring Project TypeData to be monitored Retrofit of existing fossil fuel power generation Quantity of fuel being used Electricity being generated Test fuel samples to derive emissions factor Recovery of exhaust gas in oilfield Metering quantity of methane captured and used as fuel Sampling gas composition for CH4 levels Tail Gas Quantity of fuel being loaded Number of manual loads (maintenance) Flare Gas recovery Metering of flare gas composition Quantity being captured, flare & reused Amount of flare gas being exhausted to atmosphere

Preparing a New Monitoring Methodology A template is available from UNFCCC website Key areas: Method description Monitoring of leakage Formulae used to estimate project emissions (as per baseline methodology) Key assumptions (e.g. emission factors) QA & QC procedures Descriptions of past successful application of the method

Lessons Learned* Deviations from monitoring methodology not justified sufficiently Monitoring and project management procedures not defined * Source: CDM PDD Guidebook: Navigating the Pitfalls, DNV & UNEP Lessons Learned: World Bank’s Prototype Carbon Fund (PCF) The WB has developed, applied and tested a number of baseline and monitoring methodologies for a broad range of different project types and locations. Some of their lessons are highlighted in their Annual Reports and on their website

Key References UNFCCC CDM website: Official PDD guideline document Templates for PDDs; new baseline methodologies; and new monitoring methodologies. CDM PDD Guidebook: Navigating the Pitfalls, DNV & UNEP DNV_PDD%20Pitfalls%20Guidebook.pdf DNV_PDD%20Pitfalls%20Guidebook.pdf World Resource Institute GHG Protocol Guide ayout.asp?MenuID=849 ayout.asp?MenuID=849

Small Scale CDM Projects

Small-Scale CDM (SSC) Overview Simplified to reduce cost 14 small-scale CDM project activity classifications Opportunities for bundling projects A simplified project design document Simplified methodologies for baseline determination and monitoring plans

Small-Scale CDM (SSC) Overview Furthermore Simplified provisions for environmental impact analysis Lowered project registration fee Shorter review period for registration of project activities The same DOE can validate as well as verify and certify emissions reductions

SSC Eligible Project Types Type (i) – renewable energy <= 15 MW output capacity (disregarding actual load factor) Type (ii) – energy efficiency improvement (supply and/or demand side) <= 15 GWh per year Type (iii) – other activities that reduce emissions and have direct CO2e emissions <= 15 kT

Eligible Small Scale Project Types Type I: Renewable Energy Projects A. Electricity generation by user B. Mechanical Energy for the user C. Thermal energy for the user D. Renewable Electricity generation for a grid

Eligible Small Scale Project Types Type II: Energy Efficiency Improvement Projects A. Supply side energy efficiency improvements – transmission and distribution B. Supply side energy efficiency improvements – generation C. Demand-side energy efficiency programs for specific technologies D. Energy efficiency and fuel switching measures for industrial facilities E. Energy efficiency and fuel switching measures for buildings

Eligible Small Scale Project Types Type III: Other Project Activities A. Agriculture B. Switching fossil fuels C. Emission reductions by low-greenhouse emission vehicles D. Methane recovery and avoidance Types I - III A. Other small-scale project

PDD for SSC Projects Same general approach, project cycle and PDD sections as for regular CDM projects A. General Description of Project Activity Essentially the same, except that confirmation must be given that the SSC project is not simply a ‘debundled’ large-scale project

PDD for SSC Projects B. Application of a Baseline Methodology Streamlined additionality explanation Project boundary description linked to project type guidance Detailed baseline info not required – simply reference relevant approved methodology

PDD for SSC Projects C. Duration of the Project Activity / Crediting Period Identical D. Application of a Monitoring Methodology and Plan Streamlined requirements For monitoring plan, complete relevant table from approved methodology Information on formula used moved to the next section of the document

PDD for SSC Projects E. Estimation of GHG emissions by sources Essentially the same, except formulae used are to be described in this section for the SSC project document F. Environmental Impacts Streamlined – only a short summary with relevant attached documentation required, if applicable G. Stakeholders Comments Identical

SSC Baseline and Monitoring Methodologies A key area of difference between regular and small-scale project approaches SSC methodologies are very simple, on the order of a few pages for both baseline and monitoring information combined All approved methodologies contained in one document – “Appendix B” Proposed new methodologies are simply submitted in writing to CDM executive board for consideration

SSC Baseline and Monitoring Methodologies – Key Sections Technology/measure Boundary Baseline Leakage Monitoring

Example Cat. 1D: Renewable Electricity generation for a grid E.G.: PVs, hydro, tidal/wave, wind, geothermal and biomass making electricity for a grid. For small networks emission coefficients below is used. For other systems an average of ”approximate operating margin” and ”build margin” is used, or a weighted average emissions of current generation mix if data not available.

Cat. 2C: Demand-side energy efficiency programs for specific technologies This category comprises programmes that encourage the use of energy-efficient equipments, lamps, ballasts, refrigerators, motors, fans, air conditioners, appliances etc. At many sites Baseline: number of devices times power of device times average annual operating hours/ grid loss times emission coefficient as in 1.D. Monitoring: the number and power and operating hours of replaced devices. Annual check of a sample to show that they are still operating.

Further Questions? Please contact: Mike Gerbis The Delphi Group 428 Gilmour Street Ottawa, Ontario Canada Tel: Fax: Web site: