Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Kirthy.

Slides:



Advertisements
Similar presentations
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
Advertisements

Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
S MAART S OPHISTICATED M OBILE A PPLICATION USING A UGMENTED REALITY T ECHNOLOGY Team number #5 Date:03/03/2011 Atlink Communications.
DESIGN AND IMPLEMENTATION OF SOFTWARE COMPONENTS FOR A REMOTE LABORATORY J. Fernandez, J. Crespo, R. Barber, J. Carretero University Carlos III of Madrid.
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
Team 5 Chemical Engineering Lab Scheduler Zach Frichtl Brent Ellwein Ryan Poplin Shawn Windler Chris Ciscsko Erik Halvorson Ben Linden.
The Sherlock Project Purdue University, Department of Computer Sciences Sponsored by Tellabs, Inc. Doug Clark - Group Leader Tobey Pasheilich Raj Talwar.
SE 470 Software Development Processes James Nowotarski 21 April 2003.
1 SWE Introduction to Software Engineering Lecture 5.
Iterative development and The Unified process
Chapter 3: The Project Management Process Groups
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Himendra.
Resume Extraction with Business Process Management (BPM) tools
1 Generic SMS Gateway for AtLink Enterprise Voice Integration Instructor: Dr. Kwok-Bun Yue, Ph.D Mentor: Mr. Dilhar De Silva Team #6: Dang Nguyen Huy Do.
Distributed Software Development
Chapter 1 The Systems Development Environment
Chapter 1 The Systems Development Environment
Resume Extraction with Business Process Management (BPM) tool Team #3 Fall Team Website :
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
The Systems Development Environment. Learning Objectives Define information systems analysis and design. Describe the different types of information systems.
S/W Project Management
RUP Requirements RUP Artifacts and Deliverables
Software Engineering Chapter 12 The Generic Iteration Workflow Fall 2000.
Chapter 1 The Systems Development Environment
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
CSCI Research Project and Seminar Team #1 10/02/2007.
Welcomes you ! To a Gateway for Total Project Planning, Review, Cost Monitoring & Reports
Team 6: Faisal Moiz Raymond Nnodim Michael Woodruff Instructor: Dr. Bun Yue Mentor: Craig Russell – Tietronix Software 1 Capstone – Spring 2012 Android.
An Introduction to IBM Systems Director
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Message Analysis Table.
Prepared by Afra`a Sayah. Introduction. Weekly Tasks. Plane Phase. Analysis Phase. Design Phase. Report Rules. Conclusion. 2.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
1 RoboComm: Rule-Baseo d Scheduling for Communication Systems CSCI Research Project and Seminar Team #7 Instructor: Dr. Kwok-Bun Yue Mentor: Mr.
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
team # 5 CSCI-6838 Fall 2007 UHCL RoboComm: Rule-Based Scheduling for Communication Systems (Version 2.5) CSCI Research Project and.
September 3, 2013 Project on Inventory Control System (PICS) P.I.C.S
1 Systems Analysis and Design in a Changing World, Thursday, January 18, 2007.
Introduction to Making Multimedia
1 RoboComm: Rule-Based Scheduling for Communication Systems CSCI Research Project and Seminar Team #7 Instructor: Dr. Kwok-Bun Yue Mentor: Mr. Dilhar.
L6-S1 UML Overview 2003 SJSU -- CmpE Advanced Object-Oriented Analysis & Design Dr. M.E. Fayad, Professor Computer Engineering Department, Room #283I College.
Ad Hoc Graphical Reports Ad Hoc Graphical Reports Copyright © Team #4 CSCI 6838 Spring CSCI Research Project and Seminar Team# 4 (
Midterm Presentation Capstone Team#1, Spring 2011 Irshad Ahmad KhanBalaji Srinivasan Ramakrishna AtluruVideesh Gogineni Instructor: Dr. Kwok-Bun Yue Mentor:
TieFlow Process Editor CAPSTONE TEAM # 2 03/04/2009CSCI Spring 2009.
Rational Unified Process (RUP) Process Meta-model Inception Phase These notes adopted and slightly modified from “RUP Made Easy”, provided by the IBM Academic.
Yokogawa Global MES Solution Centre (GMSC)
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Requirements Document Work Breakdown Structure. Schedule DateTooicAssignment 1-Oct-08work breakdown/features breakdown 8-Oct-08agile methodsrequirements.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Rational.
07/21/97 MOSS Project Introduction and Definition -Senior Project-
Rational Unified Process (RUP)
RIA to visualize the health of a project Team #4 Midterm presentation February 28,2008.
Web-based Front End for Kraken Jing Ai Jingfei Kong Yinghua Hu.
Meeting Scheduling System Capstone Project - Team#5 Fall2007.
Bugflow Enhancements 2/9/ :53:58 PM Team#2 Bugflow Enhancements 1 Team # 2 10/07/200 8.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
Statistics Monitor of SPMSII -High level and detailed design Warrior Team Pu Su Heng Tan Kening Zhang.
A web based tool for estimation of Gage R&R and Measurement Uncertainty Siva Venkatachalam & Dr. Jay Raja Center for Precision Metrology The University.
Retele de senzori EEMon Electrical Energy Monitoring System.
1 Process activities. 2 Software specification Software design and implementation Software validation Software evolution.
June 2008Mike Woodard Rational Unified Process Overview Mike Woodard.
Content - Introduction. - Problem statement. - Objectives.
IEEE Std 1074: Standard for Software Lifecycle
Disaster Recovery Model and Resource Tracking
Rational Unified Process (RUP)
Sophisticated Mobile Application using Augmented reality Technology
The Unified/Rational Unified Process (UP/RUP) Defined
TEAM BARCODERS 4/29/ :10 AM4/29/ :10 AM Capstone Team # 7.
Presentation transcript:

Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Kirthy Kolluri Mugdha Dixit Himendra Kandipaty RadhaKrishna Kancherla Capstone Project CSCI 6838 – Spring 2010 Team 8 1http://dcm.uhcl.edu/caps10g8/

Team Details * Kirthy Kolluri. (Team Leader & Programmer) * Mugdha Dixit. (Programmer) * Himendra Kandipaty. (Database Administrator) * RadhaKrishna Kancherla. (User Interface Developer) Mentor: Dilhar De Silva CTO, AtLink Communications. Instructor: Dr. Kwok-Bun Yue Team Members: 2http://dcm.uhcl.edu/caps10g8/

Agenda Introduction Problem Statement Rational Unified Process Life Cycle of the project Software Requirement Specifications Database Design Conclusion 3http://dcm.uhcl.edu/caps10g8/

Introduction Background: Present scenario of various oil and gas industries. Controlling the oil platforms off-shore. Amount of money invested on controlling the oil platforms. Project Description: Control and monitor oil platforms off-shore. Design a prototype for remotely monitoring the oil platform. 4http://dcm.uhcl.edu/caps10g8/

Problem Statement Physical model is provided by Epic Services. User Interface is the visualization of the Yokogawa Screenshot. 5http://dcm.uhcl.edu/caps10g8/

Cont’d… Physical Model

Cont’d… Solution: There are 3 major parts that we have to design: 1.Control system 2.User Interface 3.Database Client: Epic Services Stakeholder: AtLinks Communications 7http://dcm.uhcl.edu/caps10g8/

Rational Unified Process (RUP) Software engineering process Tool to assign tasks and responsibility within organization The process can be explained as shown in fig. 8http://dcm.uhcl.edu/caps10g8/

Life Cycle of The Project Phases of the RUP: 1.Inception: 2 weeks 2.Elaboration: 2 weeks 3.Construction: 6 weeks 4.Transition: 1 week 9http://dcm.uhcl.edu/caps10g8/

Cont’d… 10http://dcm.uhcl.edu/caps10g8/

Authentication Login Page Types of Users 1.Administrator 2.Operator 11http://dcm.uhcl.edu/caps10g8/

Cont’d… 12http://dcm.uhcl.edu/caps10g8/

User Interface Display status of the physical model Conventional representation used Yokogawa screenshots Display of controls and their status 13http://dcm.uhcl.edu/caps10g8/

14http://dcm.uhcl.edu/caps10g8/

Software Requirement Specification: Monitor & Control Physical Model: 1.Operations & Operator 2.Instructions e.g. - ~M050516,0;M050516A,1;HE050516,1;C060515,1;FV050516,90;FV A,130;LT050515,HH;LT050516,LL;TT050516,98;shutdown,0~. So to turn a motor OFF operator send: ~M050516, 0~ or ON you send ~M050516, 1~. 3. Update of status of the Physical Model 4. Display the updated status 15http://dcm.uhcl.edu/caps10g8/

Cont’d… Faceplates: Representation of all the equipments. 1.Location 2.Make 3.Volume 4.Control 5.Capacity 16http://dcm.uhcl.edu/caps10g8/

Cont’d… Business Rules 1.Store the standard and recommended status or values of all the equipments in the Database. 2.Every updated status will be checked with the business rules. e.g. – If pump-1 and Motor-2 is ON then operator should not ON the pump-3. 17http://dcm.uhcl.edu/caps10g8/

Cont’d… Warning and Alerts: 1.Error messages and alerts 2.Warnings e.g. – Alert: Pump-1 & Motor-2 ON. Warning: Check Pump-1 & Motor -2 status. 18http://dcm.uhcl.edu/caps10g8/

Cont’d… 19http://dcm.uhcl.edu/caps10g8/

Database Design Store status of the physical model Update status every second User authentication Business rules List of all the equipments Tag number unique identifier of all the equipments 20http://dcm.uhcl.edu/caps10g8/

Cont’d… Store operations with user, date, and time information. Retrieve history - archive is used to store information Warnings & alerts 21http://dcm.uhcl.edu/caps10g8/

Work to be done Complete construction phase Design user interface according to the Yokogawa screenshots Establish connection between Distributed Control System and control system. In Transition phase, testing the system, verification and validation 22http://dcm.uhcl.edu/caps10g8/

23http://dcm.uhcl.edu/caps10g8/

Questions? 24http://dcm.uhcl.edu/caps10g8/