1 If I were to give grades today… > 80A8 78-80A-2 76-78B+4 70-76B7 68-70B-5 66-68C+4 60-66C7 58-60C-1 56-58D+1 50-56D8 48-50D-1 <48F2 =(0.2*Ex1+0.2*Ex2+0.15*HW)/0.55.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

NERC Footnote b / 12 – Load Loss
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Goshen Area Bus Reconfiguration
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
and Trend for Smart Grid
1 INTRODUCTION 1.The Bulk Power Supply 2.Reliability criteria The 2 components Security assessment from operators view Requirements of a reliable electric.
EE 369 POWER SYSTEM ANALYSIS
August 14, 2003 Blackout Final Report
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
INTRODUCTION The Bulk Power Supply Reliability criteria
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
WECC and NERC Protection Criteria and Standards
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Synchrophasor: Implementation,Testing & Operational Experience
Project WECC-0100 Update Reliability Subcommittee February 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
WECC Load Model Sensitivity Study “ An Analysis of the Sensitivity of WECC Grid Planning Models to Assumptions Regarding the Composition of Loads ” Task.
Peak RCCo Performance Metrics Draft –November 2013.
1 Security assessment: decision support tools for power system operators James D. McCalley, Iowa State University, Ames, Iowa September.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Responding to post contingency overloads, IROL’s and SOL’s Art Gardiner – CPS Energy Steve Rainwater - LCRA 1.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
NERC Standards Update Colleen Frosch ROS Meeting January 7, 2016.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Special thanks to Dr. Kai Van Horn Dept. of Electrical and Computer Engineering.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Announcements Design Project has firm due date of Dec 4
IG BASED WINDFARMS USING STATCOM
ECE 476 Power System Analysis
Grid Integration of Intermittent Resources
ECEN 460 Power System Operation and Control
Presented by: LADWP November 14, 2017
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Series Capacitor Compensation
Project WECC-0100 Update Load Modeling Task Force
Determine Facility Ratings, SOLs and Transfer Capabilities
Peter van Oirsouw (Phase to Phase)
Security assessment: decision support tools for power system operators
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
TONBRIDGE POWER GREEN LINE
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
ECE 576 POWER SYSTEM DYNAMICS AND STABILITY
Presentation transcript:

1 If I were to give grades today… > 80A A B B B C C C D D D-1 <48F2 =(0.2*Ex1+0.2*Ex2+0.15*HW)/0.55

2 Notes on security assessment James D. McCalley

3

4 Types of security violations & consequences Security Overload Security Voltage Security Dynamic Security Xfmr overload Line overload Low Voltage Unstable Voltage Early- swing instability Oscillatory instability (damping) Large- disturbance instability Small- disturbance instability Fast voltage collapse Slow voltage collapse Cascading overloads

5 Types of security violations & consequences Security Overload Security Voltage Security Dynamic Security Xfmr overload Line overload Low Voltage Unstable Voltage Early- swing instability Oscillatory instability (damping) Large- disturbance instability Small- disturbance instability Fast voltage collapse Slow voltage collapse Cascading overloads Overloaded xfmr/line has higher tripping likelihood, resulting in loss of another element, possible cascading, voltage or dynamic insecurity Low voltage affects load and generation operation. Voltage instability can result in widespread loss of load. Dynamic security can result in loss of generation; growing oscillations can cause large power swings to enter relay trip zones

6 Traditional assessment & decision The NERC Disturbance-Performance Table DyLiacco’s operational decision paradigm System operating limits

7 NERC Disturbance-Performance Table

8 NERC Disturbance-Performance Table, cont

9

10 Normal One Element Out of Service Single Contingency (Forced or Maint) Category B Event B Results In: No Cascading No load loss No overload No voltage limit violation Possible RAS operation B Single Line Ground (SLG) or 3-Phase (3Ø) Fault, with Normal Clearing on: 1. Generator 2. Transmission Circuit 3. Transformer Or loss of an element without a fault. 4. Single Pole Block, Normal Clearing of a DC Line Prepare for Contingency Implement Limits No Cascading May Result In: Generation curtailment Load shedding Import/Export reductions Safety Net operation Prepare for Next Contingency Limit Import/Export Curtail Generation Shed Load Prepare for Next Contingency Limit Import/Export Curtail Generation Shed Load Two of More Elements Out of Service Extreme Events (Two or More Elements Out of Service) Single Contingency (Category B Event) B Category C event: A first contingency, followed by adjustments, followed by a second contingency)

11 Normal One Element Out of Service Multiple Contingencies – Category C Event C1-8 D1 3Ø Fault, with Delayed Clearing (stuck breaker or protection system failure): 1. Generator 2. trans Circuit 3. Xmer 4. Bus Section 3Ø Fault, with Normal Clearing: 5. Breaker (failure or internal fault) 6. Loss of tower line with 3 or more ckts 7. All trans lines on a common right-of way 8. Loss of a subs (one voltage level +Xmer) 9. Loss of a switching st (one voltage + plus Xmer) 10. Loss of all generating units at a station 11. Loss of a large load or major load center D Failure of a fully redundant special protection system (or remedial action scheme) to operate when required 13. Operation, partial operation or misoperation of a fully redundant special protection system (or remedial action scheme) for an event or condition for which it was not intended to operate 14. Impact of severe power swings or oscillations from disturbances in another Regional Council. Extreme (Category D) Event – May originate from any Operating State D1-14 Prepare for Next Contingency Limit Import/Export Curtail Generation Shed Load No Cascading May Result In: Generation curtailment Load shedding Import/Export reductions Safety Net operation Prepare for Next Contingency Limit Import/Export Curtail Generation Shed Load No Cascading May Result In: Generation curtailment Load shedding Import/Export reductions Safety Net operation Two of More Elements Out of Service Extreme Events (Two or More Elements Out of Service) C1-3 SLG Fault, with Normal Clearing: 1. Bus Section 2. Breaker (failure or internal fault) SLG or 3Ø Fault, with Normal Clearing. 3. Category B (B1, B2, B3, or B4) contingency, manual system adjustments, followed by another Category B (B1, B2, B3, or B4) contingency C Bipolar (dc) Line Fault (non 3Ø), with Normal Clearing: 5. Any two circuits of a multiple circuit towerline SLG Fault, with Delayed Clearing and (stuck breaker or protection system failure): 6.Generator 7.Trans Circuit 8. Xmer 9. Bus Section

12 DyLiacco’s operational decision paradigm Normal (secure) Emergency Restorative Extreme emergency. Separation, cascading delivery point interruption, load shedding Alert, Not secure Take corrective actions

13 System operating limits (SOLs) The value (such as MW, MVar, Amperes, Frequency or Volts) that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria. System Operating Limits are based upon certain operating criteria. These include, but are not limited to applicable pre- and post-contingency… Facility Ratings Transient Stability Ratings Voltage Stability Ratings System Voltage Limits There is a subset of SOLs that are known as Interconnection Reliability Operating Limits (IROL). IROLs are defined as, “The value (such as MW, MVar, Amperes, Frequency or Volts) derived from, or a subset of the System Operating Limits, which if exceeded, could expose a widespread area of the Bulk Electric System to instability, uncontrolled separation(s) or cascading outages.”

14 Cascading outages – the public perception….

15 System operating limits 1200 MW 300 MW 900 MW Bus 1 Bus 2 Bus 3 Question 2: What is maximum cct 1-3 flow such that reliability criteria is satisfied? Continuous rating=1200MW Emergency rating=1300 MW X 13 =1 X 12 =1 X 23 =1 Question 1: Is it “secure”?

16 Treating power as if it is current…. A very basic relation for power system engineers expresses the real power flow across a transmission circuit as: (1) Here, φ is the angle by which the voltage leads the current and is called the power factor angle. If we assume that electric loads are purely resistive, so that only real power flows in the network, then φ≈0 (φ will not be exactly zero because of line reactance). In this case, eq. (1) is: (2)

17 Treating power as if it is current…. A basic fact of power system is that the voltages usually do not deviate significantly from their nominal value. Under a system of normalization (called per-unit), where all voltages are normalized with respect to this nominal voltage, it will be the case that |Vk|≈1.0. As a result, eq. (2) becomes: (3) In other words, the numerical value of the real power flowing on the circuit is the same as the numerical value of the current magnitude flowing on that circuit (under the system of normalization). If, again, the electric load is purely resistive, then all currents will have almost the same angle, and one can treat the current magnitude as if it were the current phasor. Useful conclusion: If we assume voltage magnitudes are all unity, and all loads are purely resistive, then whatever rules we have of dealing with currents also work with real pu power flows! (or S base ×pu pwr flws)

18 Two good approximations for parallel flows 1. Current division: For 2 parallel paths A and B, power flows on path A according to 900 MW Bus 1 Bus 2 Bus 3 X 23 =1 X 13 =1 X 12 =1 300

MW Bus 1 Bus 2 Bus 3 1. Current division: For 2 parallel paths A and B, power flows on path A according to 100 X 23 =1 X 13 =1 X 12 =1 Two good approximations for parallel flows

MW 300 MW MW Total=700 Total=200 Total=500 Bus 1 Bus 2 Bus 3 Continuous rating=1200MW Emergency rating=1300 MW IS IT SATISFYING RELIABILITY CRITERIA? 2. Superposition: Results of 2 independent calculations will add Two good approximations for parallel flows

21 System operating limits 1200 MW 300 MW 900 MW Continuous rating=1200MW Emergency rating=1300 MW IS IT SATISFYING RELIABILITY CRITERIA? Total=1200 Bus 1 Bus 2 Bus 3 Lose Cct 2-3! YES!!! The answer to Question 1: Is it “secure”?

22 System operating limits 1200 MW 300 MW 900 MW Total=700 Total=200 Total=500 Bus 1 Bus 2 Bus 3 Question 2: What is maximum cct 1-3 flow such that reliability criteria is satisfied?  Depends on how flow is increased: assume stress direction of Bus1/Bus3.  Desire precontingency limits to reflect postcontingency effects

23 System operating limits 1300 MW 300 MW MW Total=767 Total=233 Total=533 Bus 1 Bus 2 Bus 3 Continuous rating=1200MW Emergency rating=1300 MW IS IT SATISFYING RELIABILITY CRITERIA? Question 2: What is maximum cct 1-3 flow such that reliability criteria is satisfied?

24 System operating limits 1300 MW 300 MW 1000MW Continuous limit=1200MW Emergency limit=1300 MW IS IT SATISFYING RELIABILITY CRITERIA? Total=1300 Bus 1 Bus 2 Bus 3 Lose Cct 2-3! It is right at the limit!

25 System operating limits 1200 MW 300 MW 900 MW Total=700 Total=200 Total=500 Bus 1 Bus 2 Bus 3 Question 2: What is maximum cct 1-3 flow such that reliability criteria is satisfied? SOL=767 Answer

26 Illustration of real-time calculation of operating security limits w/ DTS What is dispatcher training simulator? PTDF and OTDF Automatic calculation of SOL Sample system

27 What is the DTS? An off-line environment that: Emulates an energy control center's EMS Simulates the physical power system DTS uses the same interfaces and is composed of much of the same software as the real-time EMS

28 PTDF and OTDF Power transfer dist. factors: Outage transfer dist. factors:

29 PTDF and OTDF Power transfer dist. factors: Outage transfer dist. factors: We will later show how to compute SOL using PTDFs a li and LODF d l,k

30 Automatic calculation of SOLs More than identifying contingencies that result in violations, it identifies the LIMIT Overload security only Uses PTDFs, OTDFs, stress direction SOL for each cct computed as most restrictive of Normal condition, using continuous rating or All contingencies, using emergency rating Embedded in Areva’s DTS Updates SOL for all circuits every 8 sec

31 Monitored Line Outaged Line

32 More than identifying contingencies resulting in violations, it identifies LIMITS

33 More than identifying contingencies resulting in violations, it identifies LIMITS

34 More than identifying contingencies resulting in violations, it identifies LIMITS

35 More than identifying contingencies resulting in violations, it identifies LIMITS

36 More than identifying contingencies resulting in violations, it identifies LIMITS

37

38 Computing SOL using PTDFs a li and LODF d l,k