Mars BOF Meeting Report Colorado January 2007 Chris Taylor.

Slides:



Advertisements
Similar presentations
CEOS WGISS & Subgroup Meeting, Budapest, May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ
Advertisements

Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
Migration Considerations and Techniques to MPLS-TP based Networks and Services Nurit Sprecher / Nokia Siemens Networks Yaacov Weingarten / Nokia Siemens.
SIS_DTN 1 DTN BP Protocol Specification May 2010 Darmstadt 2012.
SDLS impact on TM, AOS, TC Space Data Link Protocols Greg Kazz NASA/JPL Oct 16/17, 2012.
Getting Your EMS Started: Policy Statements EPA Regions 9 & 10 and The Federal Network for Sustainability.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
SIS_DTN 1 SIS-DTN Forward Planning October 2013 San Antonio Fall 2013.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Glenn Research Center Networks & Architectures Branch Communications Technology IETF73 - IRTF DTNRG Meeting November Space-based DTN Low Earth Orbit.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
11 August 2010Abstract Test Cases 1 Abstract Test Case Development Phil Beecher (BCC) Edge / Enterprise Conformity.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 In-Space Cross Support Using Delay / Disruption Tolerant Networking Keith Scott 15 October, 2008 Berlin, Germany October 15, 2008.
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
April-2009CCSDS SOIS Wireless WG 1 Magenta Book Strategies for Success Kevin Gifford, NASA/UC-Boulder Patrick Fink, NASA JSC.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
© 2006 Open Grid Forum Service Level Terms Andrew Grimshaw.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
1 CCSDS Security Working Group Spring Meeting Colorado Springs Security Architecture January 19 th 2007.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 SecWG New Business Discussions CCSDS CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA November 2004.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
CCSDS march 2008 meeting – Crystal City 1 TC/TM space links security SEA / SLS cross area meeting.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Status of SSI Architecture Green Book Scott Burleigh, JPL Lena Braatz, Booz Allen Hamilton 2 November 2011.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Towards a Cislunar Working Group Adrian Hooke Cislunar BOF Meeting 14 May 2004 CSA, Montreal.
Key Management V 0.4 Discussion of document revision SeaSec Intermediary Meeting, Heppenheim, October 07 Daniel Fischer Uni Lux SECAN-Lab / ESA OPS-GDA.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Internal Auditing ISO 9001:2015
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Overview of Space Communication Cross Support Architecture April 2013 Takahiro Yamada (JAXA/ISAS) 1.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Brainstorming for Future WWG Activities 1.High data rate wireless Blue Book (Start 2012) –PHY and MAC, star topology; we offer a set of recommendations.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
Interplanetary Networking Issues Dai Stanton DTN working Group Input October 2009.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
Fall ‘99 Simulation Interoperability Workshop RTI Interoperability Study Group Final Report Michael D. Myjak, Chair.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
Mars BOF Meeting Report
NASA AES DTN Status Keith Scott CCSDS Meetings, Spring 2016
Brainstorming for Future WWG Activities
SPACE INTERNETWORKING SERVICES (SIS) AREA
Mars BOF Meeting Report
SPACE LINK AREA MID-TERM REPORT
Computer Science Life Cycle Models.
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Presentation transcript:

Mars BOF Meeting Report Colorado January 2007 Chris Taylor

Meeting Attendance list Dai Mathew Bob Keith Dave Howard Wallace Chad Greg Mike Nestor Chris Scott

What we learnt NASA and ESA both have infrastructure in place but the capability for relaying data between elements is very basic, essentially bitstream (ExoMars assumes packets) Proximity 1 protocol is operating as specified but it took an extremely long time to identify, negotiate and test the previous implementations (no CCSDS prototyping!) X-support points are project negotiated and not brought into the CCSDS standards regime, actual x-support capabilities are not widely publicised The real issue is not with Proximity-1 but with the data that it carries – which services and protocols are used for data exchange – thus a real internetworking and x-support issue that should have already been tackled in CCSDS The result: CCSDS presently has no clear interoperability strategy for current and future Mars missions.

What we propose to do Form a Mars working group with 3 outputs: –A PICS (protocol implementation conformance statement) proforma –A magenta book documenting the scenarios, protocol profiles and end- to-end x- support services to be used for Mars missions circa 2010 –A green book which gives an evolutionary path for the protocols, interoperability and x-support for Mars missions beyond 2010

PICS – ISO definition A Protocol Implementation Conformance Statement (PICS) Proforma is a companion standard to an OSI protocol standard. It describes all the capabilities and options within a protocol and is completed by the supplier of a product claiming to implement the protocol. The PICS is developed in the form of a questionnaire and the filled out questionnaire becomes the PICS for the product. It indicates which capabilities and options have been implemented and what limitations might prevent interworking. It allows a customer of the product to evaluate its conformance to the standard and to determine whether the product meets the customer's requirements.

PICS for Proximity-1 The PICS proforma for proximity-1 is proposed as three annexes, one for each of the CCSDS Proximity-1 Recommendations – pink sheet process Implementers of Prox-1 should document their implementation using the proforma and use it to demonstrate conformance and capabilities A great deal of information already exists from current implementations and this can be used to derive the proforma, work to be shared between NASA and ESA It is recommended that all CCSDS protocols, present and future, are complemented by PICS proforma as this will improve the compliance to our Recommendations and clearly identify incompatibilities

Mars Profiling – Issue 1 (descriptive only - not perfect ISO) Prox-1 Protocol stack CCSDS Stack ? protocol Application Prox-1 Protocol stack ? Services Agency A Landed element Agency B Orbiter Agency B Ground Infrastructure Agency A Ground Infrastructure X-Support point CCSDS Stack Application ? Services CCSDS Stack CCSDS Stack ? protocol X-Support point For Agency A to communicate using resources of Agency B both ground and flight x-support points need to be defined. For the current Mars missions these are mostly ad-hoc and not defined by CCSDS

Mars Profiling – Issue 2 Orbiter with Legacy Protocols Rover with Legacy protocols Orbiter with Future Protocols Rover with Future protocols Even if we are able to agree on an updated set of x-support services and protocols, we will remain with the issue of legacy hardware which may have a fixed implementation OK ?

Mars Profiling – Issue 2 Orbiter with Legacy Protocols Rover with Legacy protocols Orbiter with Future and legacy Protocols Rover with Future and legacy protocols If new elements implement new protocols they must also implement legacy protocols, we therefore probably need two protocol profiles All OK

Summary of Magenta book Identify the international elements which will be in place in the course of the next 10 years Document their capabilities and requirements, together with possible adaptations to arrive at a set of scenarios covering the end-to-end transmission system Specify the interoperability points and select the services and protocols to be used for internetworking Provision of protocol profiles to be used. Space Packet Protocol (ESA) and Legacy protocol (JPL). Note that prototyping may be applicable if non CCSDS x-support services are selected

Green Book - Need The work previously described should provide a workable Mars solution for the near future without changing the present Agency infrastructures. This is urgently needed and necessarily based on existing protocols However, the capabilities provided are likely to be very basic, and may not support the necessary growth as new elements arrive It may also result in an entrenched set of implementations that are unable to take advantage of emerging needs and related CCSDS developments It is therefore proposed to develop, in parallel, a CCSDS Green book which shows an evolutionary path for internetworking services and protocols to be used beyond circa 2010

Green book Contents Proposal The green book will take account of the profiles developed under the Magenta book activity and propose an evolutionary path for improving the capabilities of Mars based missions beyond 2010, typically it would cover: –Provision of a notional Mars network topology based on Mars mission proposals under consideration at ESA, NASA, and other agencies –Definition of capabilities and services predicted to be required and the operational scenarios that need to be supported –An analysis and trade-off of the most appropriate protocols to meet our needs –Identification of x-support and interoperability points –Proposed protocol stack diagrams accommodating the notional Mars network topologies, highlighting the insertion of new protocols –Plan for assuring continuation of support for legacy infrastructure as new capabilities are introduced Discussions on physical and datalink layers would be covered only to the extent of that needed for internetworking