Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Jan B.Allongue1 WIENER “MARATON” POWER SUPPLY TESTS Introduction. Magnetic field tests. Plans for radiation and electrical tests. Conclusion.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
MUON piquet report 18/9 -24/ Nikolai Bondar.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
13 Oct 2006Ageing Meeting Geneva, Niels & Gras1/15 NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
CALO News Pascal Perret LPC Clermont 26 November 2014.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Jan 2016 Solar Lunar Data.
Cabling for LHCb Upgrade
LV-workshop during CMS Electronics week
The High Voltage problem
T1 Electronic status Conclusions Electronics Cards:
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender


CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules

Pierluigi Paolucci & Giovanni Polese
Pick Light Inspection Program
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

Niels Tuning (1/9) LV status

Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next steps Niels Tuning (2/9)

1) Preventive Maintenance: Fan replacement CAEN: untouched Wiener LV –PFC (6x)  1 PFC ( ) exploded (AC short) during the final check after preventive maintenance –Fan tray (1x) –Crate PS (1x) Wiener Tell1 Racks –Fan tray (2x) –Crate PS (4x)  1 Crate PS ( ) not switch on  Retested, and seems ok  See logbook:  LHCb week 24 Feb 2014 – LV - N. Tuning (3) PFC Tell1 Rack PS

2) Power supplies: history History (see Moritz’ talk LHCb week 9 Sep 2013):9 Sep 2013 –Switched on LV for commissioning week in Sep 2013 Dirty cooling circuit: (logbook 21 Oct 2013)logbook 21 Oct 2013 LHCb week 24 Feb 2014 – LV - N. Tuning (4)

2) Power supplies: “verification” procedure Water spill when checking cooling circuit –3-SEP-2013: Unconnected cooling water for T1C and T2A3-SEP-2013: –4-SEP-2013:4-SEP-2013: A-side: T1A, T2A OK; T3A ERROR C-side: T1C, T2C, T3C ERROR JAN-2014: Unmounted all 6 Being tested one at the time: OK, with worries?? –17-OCT: T2C OK, with worries??17-OCT –22-JAN: T1C OK22-JAN –30-JAN: T3C OK30-JAN –12-FEB: T1A OK12-FEB –21-FEB: T2A OK21-FEB –To be done: T3A –To be done: Spare LHCb week 24 Feb 2014 – LV - N. Tuning (5)  Will order one extra spare PS

3) Next steps Clogged cooling water circuit at Sep comm. week Water spill damaged LV power supplies Next: –Check carefully all 6 power supplies (long term, with load) –Buy extra spare –Replace water connectors (thanks Laurent Roy for help!) –Re-install power supplies Test at next commissioning week (~17-MAR) LHCb week 24 Feb 2014 – LV - N. Tuning (6)

Backup LHCb week 24 Feb 2014 – LV - N. Tuning (7)

1) Preventive Maintenance: Fan replacement WienerWiener: our fans are under maintenance now –LV power supply (PFC) + fan trays –Tell1 crates fan trays –Total cost 6k CHF CAENCAEN: we wish not to touch Niels Tuning (8/9) Ken Wyllie, TB 26 feb 2013

Intermezzo: Fans in OT 1)CAEN HV 1)CAEN HV (2 SY1527 Mainframes): We prefer not to touch the system a)They have a lifetime of 20khours at 60 C. This corresponds to 2.3 years continuous operation at 60 C. Suppose operation at 30 C, the lifetime increases to (1.26)^3 x 2.3 = 4.6 years of continuous running. b)Actual experience suggests lifetime is longer. c)We think the risk of damage when taking apart the system is considerable. d)We will try to remove dust during LS1. 2)Wiener LV 2)Wiener LV: We wish to have the fans replaced I.PFC units (6) a)They have fans with a lifetime of 39khours at 40 C. This corresponds to 4.5 years continuous operation at 40 C (or 5.7 years at 30 C). b)At the same time, we have the chance to check/replace suspicious capacitors. c)This (simply) implies sliding out the PFC units, and does not form a big risk. II.Fan-Tray a)Lower priority, as they have longer lifetime 65 khours + easy to replace. III.Crate-power-supply of the RCM-crate 3)Wiener TELL1 3)Wiener TELL1: We wish to have the fan-tray replaced I.Fan-trays a)Lower priority, as they have longer lifetime 65 khours + easy to replace II.Crate-power-supplies LHCb week 9 Dec 2013 – LV - N. Tuning (9)

CAEN HV (SY1527) LHCb week 9 Dec 2013 – LV - N. Tuning (10)

Wiener LV I. PFC (x6): II. Fan tray: Front: Back: III. Crate Power Supply

Wiener TELL1 I. Fan tray: II. Crate power supplies Front: Back: