US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 1 MDT Electronics.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
The MAD chip: 4 channel preamplifier + discriminator.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
E. Hazen - LECC Amsterdam1 Production Testing of ATLAS MDT Front-End Electronics G. Brandenburg, J. Oliver, M. Nudell, Harvard University,
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
ATLAS MDT-ASD PRR – 30-August-2002George Brandenburg – Page 1 ATLAS MDT-ASD Operational Tests at Harvard George Brandenburg Michelle Dolinski Peter Hurst.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Walls crates cables gas chambers electronics CERN adb.
R. Ball September 27 th  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
T1 Electronic status Conclusions Electronics Cards:
Sheng-Li Liu, James Pinfold. University of Alberta
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
CMX Status and News - post PRR -
RPC Front End Electronics
SALTRO16 activities in Lund
Presentation transcript:

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 1 MDT Electronics

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 2 On-Chamber Electronics Faraday bottom plate Hedgehog card (passive) 24 MTD array : 3x8 & 4x6 Faraday top plate (sides not shown) Mezzanine card (ASDs, TDC, i/o) Mezzanine card enclosure

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 3 PCB Requirements Mezzanine Board ASDs, TDC, --> Mixed signal design Low crosstalk Robust esd/spark protection Maintain thermal noise levels (< 1 fc) -6 layer designs -Split (Analog/Digital) power & ground planes -LVDS for all “real time signaling” Signal Hedgehog 3.2 kV operation, 6kV components Low capacitance (Hi-Z) signal traces (noise, signal quality) Low crosstalk - “widely” separated signal traces Low noise - 4 layers with ground planes on top and bottom

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 4 ASD Chip Requirements Low noise/low input impedance for good signal integrity High background rate of up to 300kHz per channel In-situ timing calibration Pulse height measurement for time-slewing correction Eliminate "fake" after-pulsing by programmable dead-time Low cost, reliable, rad-tolerant, analog CMOS technology –HP 0.5u CMOS

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 5 Component Connections Mezz Chamber Service Module Data (fiber) MROD TTC 40 conductor Mezz-CSM ribbon calbles carry : Clk, trigger,calibration (fiber) Power, Gnd Data Clk Timing calibration V,T monitoring DCS

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 6 CSM Design Highlights Motherboard has connectors to service up to 18 Mezz Boards Daughterboard has multiplexor and communications chips Initialization - Cat5 Cable JTAG from MROD (Opto-isolate) Environment Monitoring - ELMB Analog Mux (64 channels) Calibration - Standard TTC System Link to ROD - Low Power Optical G-Link at 53.3MHz Simple time division multiplexing 1.8 volt LVDS capable FPGA

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 7 CSM-1 Daughter/Mother

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 8 Design Responsibilities HedgeHog Boards –EndCap: MIT (HV), Boston U (signal) –Barrel: Pavia (HV), Rome III (signal) MDT-ASD Chip - Boston U and Harvard AMT-TDC Chip - KEK Mezzanine Boards - Harvard and Boston U Mezz-CSM Cables - Boston U and Harvard Chamber Service Module - Michigan ROD - NIKHEF

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 9 Production Responsibilities HedgeHogs (common production in Italy) –Signal - Boston (EndCap), Chamber-Builders (Barrel) –HV - INFN (all types) ASD - Boston U and Harvard AMT-TDC - KEK Mezzanine Boards - Israel ( Harvard : coord./testing) Mezz-CSM Cables - Harvard and BU (EndCap) Chamber Service Module - Michigan (EndCap) ROD - Nijmegen plus several European institutions

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 10 HV Hedgehog Status Production responsibility: Pavia -Agostino Lanza Manufacturer: SEI Systems in Genoa, Italy First batch of 600 boards arrived in March 2003 –220 Type I, 280 Type II, 40 Type III, 60 Type IV Will deliver 2000 (one eighth) every 2 months EndCap boards will be distributed from Harvard Board to board jumpers all delivered

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 11 Signal Hedgehog Status Production responsibility: BU for EndCap Manufacturer: SEI Systems in Genoa, Italy Eleuterio Spiriti (Rome III) will oversee First small batch arrived in March 2003 Next batch of ~500 being distributed now Then deliver 1000 (1/16th) every month Harvard will also distribute the EndCap boards Improvements in delivery rate needed to keep pace (see next transparency)

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 12 Signal Hedgehog (cont.) Delivery rate for EndCaps must improve –Need 50% by Dec 03, remaining 50% by April 04 SEI Systems visit last week: –Test rig bugs worked out (humidity control etc.) –Rate will now exceed 1000/mo (1200/mo?) –R. Richter says it can be improved --> 2000/mo –Progress will be tracked bi-weekly Accelerated delivery schedule for EndCap? –R. Ricter says Barrel builders not ready for full rate –Distribution re-balancing favoring EC to be discussed

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 13 ASD and AMT Chip Status ASD production responsibility: BU (+Harvard) –80K ASD chips delivered in January –90% tested (Harvard) and ready for shipment to Israel –Yield: 70% top quality + 15% additional OK quality –Main problem: chan to chan variation in threshold offset AMT production responsibility: KEK -Yasuo Arai –24 channel TDC chip with trigger windowing –100 AMT3 chips already delivered to Israel for Mezz –Remaining 17K will be delivered early June

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 14 Mezz Board Status Original production responsibility: Harvard + BU Israel (G.M.) offered to produce using special funds! 100 “pre-production” boards installed at H8 test beam “Final” layout sent to Israeli vendors in April –Eltek (PCBs), Arotek and PMI (fab) –Expect first production batch of 100 boards in June –Next batch of 5K boards in August, tested by September –Remainder (12K) delivered by Nov, tested by Feb 04 Testing will take place at Harvard –Test 1000/wk using 16 board test stand –Possible second test site at CERN?

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 15 Mezz-CSM Cable Status Design responsibility: Harvard (and BU) Production responsibility: Harvard (for EndCap) Shielded, halogen-free, round ribbon cable Locking connectors used - shield grounded at FC Prototype cables being used/tested at H8 5000’ of cable (~1/3 of EC total) due May (.5m f-f) Another 5000’ of cable due July (.33m f-f) First big batch of fabricated cables available July Will stay ahead of Mezz Board production / testing

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 16 CSM Status Production responsibility: Michigan (for EndCap) CSM-1 prototypes being used at H8 –Motherboard production can begin September –Install on chambers to “terminate” Mezz-CSM cables –Daughter boards with fiber optics produced in early 04 –Easy to plug into already mounted motherboards “CSM-0.5” daughter board (BU) for chamber tests –Uses CSM-1 motherboard for chamber mount –Final Mezz-CSM cabling can be installed –Patches JTAG and data to CSM-0 using Cat 5 cables –Can use existing prototype test stands

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 17 Production Schedule

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 18 Est. Cost to Complete

US ATLAS Lehman Review – 22-May-2003George Brandenburg – Page 19 Est. Cost Comments