1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Direct Drive Wave Energy Buoy Ken Rhinefrank [Columbia Power Technologies, Inc.]

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Underwater Active Acoustic Monitoring (AAM) Network for Marine and Hydrokinetic.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Document number Finding Financial Solutions & Models for Microgrids Maryland Clean Energy Summit Panel Wednesday, October 16, 2013.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Iowa Hill Pumped-storage Development PI:
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Acoustic Deterrence of Migratory Whales Steve Kopf, Program Manager Pacific.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Water Use Optimization: Hydrologic Forecasting Presenter: Mark Wigmosta Organization:
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review [Annex IV] Hoyt Battey Andrea Copping DOE Water Power Program
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Puget Sound Pilot Tidal Energy Project (TRL 7/8) Dr. Brian Polagye (for Craig.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower Innovative System Testing (1.2) Department of Energy,
ASME Oral Presentation Competition Stevens Institute of Technology Mechanical Engineering Dept. Senior Design 2005~06 April 1 st, 2006 Presented By: Lazaro.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
Interested in developing a new, clean source of energy from the sea? We want you!!! Graduate research at Oregon State University
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- AWP Alex Fleming: PI Dehlsen.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced, High Power, Next Scale, Wave Energy Conversion Device Dr. Philip R.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Near Space Systems Inc. Small Hydropower Research and Development Technology.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
1 | Wind and Water Power Programeere.energy.gov Development of a wave-actuated electric power take-off device 2011 Water Power Peer Review Meeting Development.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
AMP – SAMS/MAMS/PIMS 1 GRC Project Manager: MSI/Kevin McPherson Chief Engineer: Alan Linne Safety Mission Assurance Lead: Bipin Patel NASA Customer: SOMD/Brad.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Northwest National Marine Renewable Energy Center Belinda A. Batten Oregon State.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
Server Virtualization: Navy Network Operations Centers
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Effects of Hydrokinetic Tidal Turbines Dr. Brian Polagye University.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A-WEC Franc Mouwen Wavebob LLC November 2011.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review SubTask CH TD Day-ahead Scheduling and Real-time Operations Tool Conventional.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower System and Component Development (1.1) Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Cycloidal Wave Energy Converter TRL Advancement to Level 4 Dr. Stefan G. Siegel,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review THOR’ s Power Method for Hydrokinetic Devices Turner Hunt THOR Energy Group LLC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Environmentally Benign and Permanent Modifications to Prevent Biofouling on Marine.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Understanding Small Wind David Ryan PE NCAT 3040 Continental Drive Butte, MT
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reference Model Development Richard Jepsen Sandia National Labs
1 IRU Data versus information Geoff Leese Sept 2001, revised Sept 2002, Sept 2003, August 2008, October 2009.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of the Environmental Effects of Hydrokinetic Turbines on Fish: Desktop.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
The Challenge Thermal Efficiency & Ventilation Air Vents (air bricks)
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Direct Drive Wave Energy Buoy Ken Rhinefrank [Columbia Power Technologies, Inc.] [November 2, 2011] Manta Direct Drive Wave Energy Converter

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Challenges-Barriers-Knowledge Gaps Wave energy is the only renewable energy source that is not commercially installed. Numerous designs and concepts exist and most are early stage with limited knowledge concerning the actual CoE or ability to operate and survive in this harsh environment. Furthermore the systems can be complex in design, non- linear in performance and include numerous cost uncertainties such as grid integration and permitting. In real sea conditions, numerical energy predictions can be off by over 40%. Until prototypes are designed built and tested we will not know the true cost of energy or be able to reliably forecast methods of cost reduction.

3 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration How Solving Problem Relates to Program Mission The design and development of a wave energy system is complex and detailed. Only through a staged project development approach, where actual performance and operation are measured and observed experimentally at a sufficiently large scale and where complete system designs are developed, built and tested, can the actual cost of energy can be assessed.

4 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Integration of this Project Results from this project are used to inform the utility- scale design process, improve cost estimates, accurately forecast energy production and to observe system operation and survivability. Knowledge and experience gained from this project is applied to major program objectives including: Design and certification of the commercial-scale system Land-based test of a commercial-scale generator, bearing and seals Open-ocean deployment of a commercial-scale DDR WEC in conjunction with a recognized independent testing center.

5 | Wind and Water Power Programeere.energy.gov Technical Approach Project Approach The primary goal of this project is an intermediate-scale (1:7) bay/ocean test of a novel Direct-Drive Rotary Wave Energy Converter (DDR WEC). Key tasks include: WEC Optimization –Shape, CG, inertial using AQWA and Wave Dyne numerical models –PTO Controls Optimization 33 rd scale tank testing, performance and survival analysis 7 th scale testing at sea (design, build, deployment and experiments) Data analysis of 7 th scale results Integration of findings into Commercial Scale Design

6 | Wind and Water Power Programeere.energy.gov WEC body optimization complete AQWA numerical optimization Over 368 unique shape simulations 311 unique CG and inertia simulations hours of computer simulation time “Gen 3.1” 230% energy capture improvement versus “Gen 3 “ 15 th scale PTO Controls Optimization Ballast Optimization Interim Optimization Report complete Technical Approach

7 | Wind and Water Power Programeere.energy.gov 33 rd scale tank testing and performance analysis complete Design & Fabrication complete Testing services and test plan contracted and completed Regular waves, irregular waves, 50 year and 100 year storm waves Wave data has been analyzed Performance measures and RAO’s assessed Numerical and experimental comparisons in progress, example RAO below Technical Approach

8 | Wind and Water Power Programeere.energy.gov Technical Approach 7 th scale Testing at sea (design, fabrication, ops. and experiment) SEA TRIAL UNDERWAY Seattle Deployment Site

9 | Wind and Water Power Programeere.energy.gov Technical Approach Data Analysis Data Collection and Deployment ongoing  Wave occurrence is ~40% of the time in winter  Remote WEC data collection through 3G network  AWAC data collection through periodic site visits  7-24 surveillance camera  Solar power small waves in summer  Periodic service visits  Periodic battery charges Analysis Methodology is developed  Third-party review of approach ongoing  Statistical characterization of waves  Assessment of data quality Integrate Findings into Commercial Scale Design Design in progress

10 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: December 1, 2009 Planned completion date: March 26, 2011 –Deployment extended beyond May 2011 by up to nine months to collect more data Milestones FY10  WEC Optimization  33 rd scale wave tank experiment  7 th scale design FY11  Permits approved  7 th scale fabrication complete  Deployment Underway  WEC Recovery  Data Analysis  Commercial design integration

11 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Go/no-go decision points FY12/FY13 –Performance and cost assessment –Utility scale prototype site selection –Project funding availability for major tasks: PTO test Commercial scale build and deployment Budget: Remaining budget will be utilized during remainder of deployment period 71% of budget utilized to date. Budget History FY2009FY2010FY2011 DOECost-shareDOECost-shareDOECost-share 00$573K $601K

12 | Wind and Water Power Programeere.energy.gov Accomplishments and Results 230% increase in energy capture Successful Design/Fabrication, Puget Sound-Deployment Knowledge gained through the design, fabrication, test and deployment of a 7 ton intermediate scale WEC is extensive and has proven to be an essential and valuable stage in our technology readiness level. Continued operation at sea for over eight months This milestone is demonstrating a viable technology for extracting energy from ocean waves and provides confidence in our design as we move toward an open-ocean utility-scale demonstration. Preliminary indications of energy generation are on track with numerical estimates.

13 | Wind and Water Power Programeere.energy.gov Challenges to Date Prototype Power draw very high Causes: Active/Standby design load 60/40 W, design creep and deviation from spec ->105W 105W = 95 kW full scale equivalent -> “Instrumentation does not scale down well” Original charge frequency 20 to 25 days with average WEC shaft power of 45W Deployment extension into summer months (less wave energy) Power electronics failure Solutions: $3k battery charges at 2x per week Installation of Solar panels kept electronics working all summer without charges Upgrades to wave energy power electronics Future systems installed in small scale wave climates need more storage and backup energy sources.

14 | Wind and Water Power Programeere.energy.gov Challenges to Date DDR voltage and power variance and high demand on electronics eventually caused failure Causes: Cyclic speed and voltage with average levels an order of magnitude lower than peak. Possible damage due to thermal overload No commercially viable solution that fit the prototype needs requiring a custom solution at this scale. Accelerated design path to meet schedule Solutions: Original design and backup designs planned for this failure and applied linear damping controls even in failed conditions which allowed for continued collection of performance data. Redesigned and repaired power electronics. Commercial design includes cost tradeoffs between voltage peak reduction and over- specified power electronics. Post deployment autopsy to find possible cause

15 | Wind and Water Power Programeere.energy.gov Challenges to Date Wave data analysis at 1:7 scale is difficult in ocean setting Causes: Relatively deep water (22m) decreased high frequency response of AWAC 7 th scale spectrum is at the high frequency limit of commercially available and deployable wave monitoring instruments that were practical at this location. Regionally available intermediate scaled (1:4 to 1:10) wave climates do not support larger than 1:7 scale tests. Lager scales too expensive to test for this level of readiness. Solutions: Accept imperfection while assuring data is sufficient (marginally met at Nyquist rate) Mount AWAC on a mid column buoy to increase frequency response. Monitor data from AWAC through acoustic modem to WEC and then to shore Post process time series data into spectral format using in-house code

16 | Wind and Water Power Programeere.energy.gov Challenges to Date Evaluating 1:7 scale wave data Regions where shipping traffic produces relatively large waves introduce post processing requirements not normally associated with tank testing or utility scale ocean testing scenarios. Solutions: Creative post processing Data collection requirements (frequency and quantity) Prototype test requirements exceed those expected for a final utility application. Data collection and storage for prototype testing requires very high reliability. Solutions: Not satisfied with dSpace/PC based solution used this time, alternatives are under investigation

17 | Wind and Water Power Programeere.energy.gov Next Steps  Continue deployed testing & determine when data is sufficient Daily monitoring, post processing, WEC battery charges, AWAC servicing  WEC Recovery Remove all equipment  Data Analysis  Commercial design integration  Final report