Production Preparation Process The SMS Technologies Quality Management System includes: ISO 9001, AS9100, ISO 13485, and ISO/TS 16949  They All Include.

Slides:



Advertisements
Similar presentations
Initial Capacity Assessment Sheet (ICAS) &
Advertisements

A DVANCE P RODUCT Q UALITY P LANNING by : Wahyu Epifanto.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
1 © 2006 Superfactory™. All Rights Reserved. Design for Lean and Six Sigma Superfactory Excellence Program™
Process Analysis 102 Quality: The Basic Tool Kit.
Supplier Development Kaizen Implementation Kit
Popcorn Sample PFMEA: Process Flow
CHAPTER 9: LEARNING OUTCOMES
F AILURE M ODE E FFECT A NALYSIS.
Large Automotive OEM – FMEA Managed Service
Barry Murash MBBit Nortel 2007
Section VI, Measure - Data & Process Analysis
Fundamentals of ISO.
Supplier Program Review Meeting #1
Operational Excellence The Future?: …Process Management and Process Improvement.
Team 2 Portfolio Review Qs 327 Fall 2004 Dr. John Sinn.
Group Exercise Instructions
Visit us at E mail: Tele:
Analyze Opportunity Part 1
BELU, IONESCU, MISZTAL - Computer Aided Design Solution Based on Genetic Algorithms for FMEA … Amsterdam, 06 August 2015 COMPUTER AIDED DESIGN SOLUTION.
S Q A.
353(0) TECHNOLOGY SOLUTION CeADAR’s standalone platform personalises the forecasting model for monitored.
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
McGraw-Hill/Irwin.
Including: PPAP. Advanced Quality Planning is a process to develop quality information in order to develop counter-measures for avoiding similar problems.
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Development Process (3.2.3) Process Owner Presentation
Assembly Line Balancing
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
Copyright 2013 John Wiley & Sons, Inc. Chapter 3 Monitoring and Controlling the Transformation System.
Phase 3: DEVELOPMENT & VALIDATION
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_courseware_quality_ppt _v001_msamc_courseware_quality_ppt7 found in Resources.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
Supplier Performance Development Process
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Learning Objectives Today we will Learn: How to identify the data requirements of a IT system using a Data Flow Diagram.
Eaton Supplier APQP Process Overview
Process engineering Quality controls.
How to apply APQP APQP is comprised of one pre-planning stage and five concurrent phases. Once begun, the process never ends and is often illustrated in.
Control Plan Training.
Integrating QS9000 Requirements
APQP Five Phase Process
BUSINESS PROCESSES MAP
Production and Operations Management Function
Identification of Processes Turtle Diagrams Approach
+  New Product Capable, fast and cheap Manufacturing Processes
Quality Management Systems – Requirements
Global Supplier Quality Early Production Containment Training
Certification Project Template
Supplier Performance Development Process
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
A P C D E X T R N A L C U S O M E X T R N A L C U S O M PROCESS A
IENG 451 / 452 Standardized Work Lab: Work Cells, Standardized Work
CVG Global Phased PPAP Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
It’s Time for a Break!!!.
Supplier Performance Development Process
Integrating TS Requirements
Global Supplier Quality Early Production Containment Training
QFD & FMEA Linkage Requirements & Specifications
Advanced Product Quality Planning 2nd Edition
Complete chart for 18 minutes
1 ADVANCED PRODUCT QUALITY PLANNING Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
PRODUCT QUALITY PLANNING CYCLE
Presentation transcript:

Production Preparation Process The SMS Technologies Quality Management System includes: ISO 9001, AS9100, ISO 13485, and ISO/TS  They All Include Product Realization Advanced Product Quality Planning Production Preparation Process Production Part Approval process

APQP, Flow Charting, Process FMEA, Control Plan, 3-P & PPAP  APQP = Advanced Product Quality Planning Build 1st-time Quality into the Production Process  FMEA = Failure Mode Effects Analysis Minimize Risk (DFM, DFT & Mistake-Proofing)  3-P = Production Preparation Process Build to Customer Demand Beginning at Launch  PPAP = Production Part Approval Process

PRODUCT QUALITY PLANNING TIMING CHART CONCEPT INITIATION/ APPROVAL PROGRAM APPROVAL PROTOTYPE PILOT LAUNCH PLANNING PRODUCTION Production INPUTS | Production OUTPUTS Planning INPUTS | Planning OUTPUTS Product Design & Dev. INPUTS | Product Design & Dev. OUTPUTS Process Design & Dev. INPUTS | Process Design & Dev. OUTPUTS Product & Process Validation INPUTS | Product & Process Validation OUTPUTS PLANNING PRODUCT DESIGN AND DEV. PROCESS DESIGN AND DEVELOPMENT PRODUCT & PROCESS VALIDATION FEEDBACK ASSESSMENT AND CORRECTIVE ACTION

SEI Process Flow Diagram

Process Failure Mode Effects Analysis

Proto-type, Pre-launch & Production Control Plans

Operator Work Instructions Work Instructions with applicable drawings, etc. are developed for each material transformation:

Process Flow Chart FMEAs Control Plans Operator Instructions PPAP Core Tools Applications The Key Linkages for Customer Special Characteristics

Defining & Balancing The Cell

Calculating Takt Time Total Shift Hours = 8 X 60 min. X 60 sec. = 28,800 seconds minute breaks X 30 min. X 60 sec. = 1,800 seconds -Start-up & Shut-down = 15 min. X 60 sec. = 900 seconds Available Work Time = 26,100 seconds Takt Time = Available Work Time / Customer Demand (units) TAKT TIME = 26,100 Seconds / 50 Units = 522 Seconds TAKT TIME = 522 Seconds / 60 = 8.7 Minutes Build a cell that will produce one unit every 8.7 minutes!

Defining & Balancing The Cell

Until learning curves been achieved, work portions are allowed to vary slightly around the takt time until conducting further studies:

Preliminary SEI Cell Floor Layout

Varying The Cell Volume Scaling Volume by Adding Shifts