Fumigant Management Plans and Post Application Summary Reports Module 6 Soil Fumigant RED Requirements.

Slides:



Advertisements
Similar presentations
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Advertisements

(Individuals with Disabilities Education Improvement Act) and
P RIVATE A PPLICATOR R ECERTIFICATION North Carolina Department of Agriculture & Consumer Services Structural Pest Control & Pesticides Division,
HAZARD ANALYSIS CRITICAL CONTROL POINT Food Safety in Action for Transported Meals North Carolina Department of Public Instruction Safe and Healthy Schools.
1 Overview of Soil Fumigant Uses Module 2 Soil Fumigant RED Requirements.
Buffer Zones Distances, Credits & Posting (2011) Module 7 Soil Fumigant RED Requirements.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
Overview of Risk: The Need for New Requirements Module 3 Soil Fumigant RED Requirements.
11. As part of its mission to protect human health and the environment, EPA works with various partners, including schools, to share information, resources.
Module Three Chapters 7, 8, & 9. Chapter 7 Site Assessment and Weather.
OEHS Academy OEHS Academy New and Aspiring Principals OEHS Responsibilities Presented by: Office of Environmental Health and Safety Modification Date:
How to Implement the CalARP Program
New Requirements For Soil Fumigant Pesticide Products EPA and UGA Grower Trainings Nov 2010 Culpepper and Sumner.
Site Specific Fumigant Management Plan And Post Application Summary Joel Kangiser WSDA.
Western Regions Pesticide Meeting May 2010 Inspection Checklist.
Western Regions Pesticide Meeting May 2010 Tools, Calculators And Mapping Tools.
2010 Fumigant Handler and Worker Protection Measures Western Regions Pesticide Meeting May 2010.
Norton, 2010 E. Randall Norton, Ph.D. The University of Arizona Safford Agricultural Center.
Overview and Implementation Schedules Richard Keigwin, Director EPA Pesticide Re-evaluation Division.
Registrant Requirements; EPA, Registrant, and Partner Roles in Training Richard Keigwin, Director Pesticide Re-evaluation Division.
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
EPA Resource Development And Outreach Activities John Leahy, EPA Pesticide Re-evaluation Division.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Management Responsibility Procedure Tutorial. Introduction to Management Responsibility In this presentation we will discuss how to write a procedure.
October Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made.
Safety Management Strategies for Extended Care Facilities.
Good Agricultural Practices (GAPs) Module 4 Soil Fumigant RED Requirements.
1 Introducing BSI Health & Safety Self-assessment Online.
Establish Documentation and Record Keeping (Task 12 / Principle 7)

World Health Organization
PENNSAFE ONLINE HSSF Pennsylvania Worker & Community Right to Know Act
ACCIDENT INVESTIGATION. Accident Investigation An Employer should immediately investigate the cause of any accident or other incident that : çresulted.
NC A&T STATE UNIVERSITY
Module 1 Chapter 1, 2, and 3. Chapter 1 Overview of Soil Fumigants and Soil Fumigation.
Authorization and Inspection of Cyclotron Facilities Inspections.
Safety and Health Program Section B of the Forest Activities Code.
Basics of OHSAS Occupational Health & Safety Management System
Standard 29 CFR Part Hazard Communication.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
OREGON OSHA PESTICIDE EMPHASIS PROGRAM ANNUAL REPORT FFY 2009.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Health and Safety Policy
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Food Safety Plans  GAP/Food Safety Plan  Processor/Preventive Controls Food Safety Plans Produce Food Safety Plan.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
Protections for Handlers & Workers (2010) Module 5 Soil Fumigant RED Requirements.
-Emergency Preparedness and Response - Difficult to Evacuate Sites - Notice to State Lead Agencies (2011) Module 8 Soil Fumigant RED Requirements.
Registrant Requirements (2010 & 2011) Module 9 Soil Fumigant RED Requirements.
New Requirements For Soil Fumigant Pesticide Products EPA - August 2010 Soil Fumigant RED Requirements Training Program Module 1: The EPA Regulatory Process.
NEW PHOSTOXIN LABELING
California Department of Pesticide Regulation 1001 I Street, Sacramento CA October Application Phase Module 1.5: Observing the Application.
Worker Protection Standard 40 CFR –
Office of Human Research Protection Georgia Health Sciences University.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Communication of Control Measures. Who do we need to Communicate To Employees Subcontractors Professionals Visitors.
Soil Fumigant Training Requirements & Implementation Presented by Jeanne Kasai, EPA to the 13 th Annual Conference of The Pesticide Stewardship Alliance.
Steps in Developing a Competency Assessment Plan.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Essential Requirements of Pool Management Companies
Food Safety Program Based on HACCP Principles by Ramadan Badran
Fumigation Updates Presented by: Blanca Enriquez-Pratt
Management Responsibility
Fumigant Reregistration New Labels, Applicator / Handler Training
Where We Are OVERVIEW Lesson 1: Course Overview
Oleh : Ir. Sjaifuddin Thahir, MSc.
ZeraWare Safety Software is a sustainable safety management system for managing the core components of a sound safety program. Our user- friendly software.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

Fumigant Management Plans and Post Application Summary Reports Module 6 Soil Fumigant RED Requirements

22 What is a Fumigant Management Plan (FMP)?  A written, site-specific plan prepared before fumigation begins  Plan all aspects of a safe and effective fumigation to help: Prevent accidents Ensure, demonstrate & verify compliance Define procedures in case of accidents or unforeseen events Module 6: FMPs

FMPs – Who?  Completed by grower, commercial applicator, crop consultant, or others  Certified applicator in charge: Verifies accuracy Signs  May be farm-wide Common information in one place Separate sections for information unique to each fumigant application  Must be available to handlers, enforcement personnel, and emergency response personnel Module 6: FMPs

44 FMPs - First Phase  General information Site, applicator, applications  Steps taken to verify compliance GAPs and worker protection  Procedures Air monitoring; hazard communication; posting treated areas and record-keeping In case of accidents or unforeseen events  Safe handling information provided  Post application summary report Module 6: FMPs

5 FMPs – Second Phase  Buffer zones How they were calculated, including credits  Site map or sketch  Procedures Posting buffer zones Emergency preparedness and response (if triggered)  Records Applicator training Notice given to States of applications (if required) Module 6: FMPs

66 Post Application Summary  Deviations from FMP E.g., date of application, procedures, personnel, etc.  Summary of weather, site conditions  Description of problems or complaints  Actual dates of tarp activities, sign removal, etc.  Must complete within 30 days of application Module 6: Post Application Summary

7 Record Keeping  Keep FMPs and Post Application Summaries for 2 years supervising certified applicator owner/operator (if not the certified applicator)  Keep with other records required for application of RUPs Module 6: FMPs & Post Application Summary

FMP Templates and Tools  Adobe Acrobat templates  Microsoft Word templates  Web-based tool Module 6: Templates and Tools

99 FMP Sample Template Module 6: FMP Template

10 FMP Sample Template Module 6: FMP Template

11 FMP Sample Template Module 6: FMP Template

12 FMP Sample Template Module 6: FMP Template

13 FMP Sample Template

Post Application Summary Sample Template Module 6: Post Application Template

Post Application Summary Sample Template Module 6: Post Application Template

16 Figure 1. Example of Introductory Screen - Web-based Program Module 6: Web-based FMP Program

17 Figure 3. Example of screen illustrating general site information Module 6: Web-based Program

18 Figure 4. Example of screen illustrating general application information Module 6: Web-based Program

True or False? 1. A site specific FMP must be prepared by a certified applicator. 2. An FMP has requirements that are in addition to those that are on the label. 3. FMPs and Post-Application Summaries must be kept for 1 year by the fumigator and owner/operator. Review Questions Module 6: FMPs and Post Application Summary

20 4. The label requires that FMPs are available: a) for viewing on site by handlers involved in the application b) to enforcement personnel, upon request c) to emergency response personnel, in case of an emergency d) for viewing by neighbors, upon request e) a, b, and c f) a, b, c, and d Review Question Module 6: FMPs

Summary  Fumigant Management Plans Are required to prepare for safe and effective applications Must be filled out by grower, commercial applicator, crop advisor, or other Will be implemented in 2 phases May be farm-wide, with sections on application-specific information Must be Signed and verified by certified applicator in charge Kept for 2 years Available to handlers, inspectors and emergency personnel  Post Application Reports Show any deviations from the FMP Document measurements taken Must be Completed within 30 days of application Kept with the FMP Module 6: FMPs and Post Application Summary

EPA Contact Information  General Contact: John Leahy (703)  Team Leaders: Steven Weiss (703) Cathryn O’Connell (703)  Chemical Review Managers: Methyl bromide: Susan Bartow (703) Metam sodium: Dana Friedman (703) and Jose Gayoso (703) Dazomet: Dana Friedman (703) ,3-D & Chloropicrin: Andrea Carone (703) Module 1: The EPA Regulatory Process; Implementation & Outreach