October 2011 7-1 Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made.

Slides:



Advertisements
Similar presentations
Stephen J. Klein President The Toxic Substances Control Act (TSCA) Lead Paint Law.
Advertisements

CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR License Requirements & Work Practice Standards.
Lead-Based Paint Renovation, Repair, and Painting Rule Overview of RRP Rule EPA Region 8 ************ Jim Maley.
Lead Dust Sampling Technician June Chapter 1 Introduction.
Property Painting Rule: EPAs Renovation, Repair, and Painting Rule: Guidelines for Property Managers.
Renovation Repair Painting Program Rule 40 CFR Part 745 Subpart E (Residential Property Renovation) (epa.gov/lead)
40 CFR Part 745. Addresses activities that disturb lead-based paint in target housing and child-occupied facilities. It requires: Renovators to be certified.
EPAS FINAL RULE ON REMODELING & RENOVATION West Central Builders Association March 17,
Understanding EPAs LRRP Program
GRIEVANCE TRIP-UPS. BEFORE IT STARTS Policy not up to date Hearing officers not properly named No log book of prior hearings Hearing officers not trained.
DOCUMENTATION Missouri Medicaid Audit and Compliance Provider Certification Review Materials.
January 26, 2015 CDBG Small Cities. What is Triggered under HUD Regulations? HUD Projects costing less than $25,000 When a contract specifies lead remediation.
PPAP Requirements Training
Lead-Based Paint Renovation, Repair, and Painting Overview of Final Rule March 11, 2010.
Lead; Renovation, Repair and Painting Program: Final Rule - April 3, 2008 Lead-Based Paint Hazard Awareness Ark-Tex Council of Governments Texarkana College.
WNV Pesticide Regulations Brian Rowe Pesticide Section Manager Michigan Department of Agriculture.
MOD VIII - REGULATORY OVERVIEW FOR WORKERS IN FEDERALLY-ASSISTED HOUSING  List the major Federal agencies responsible for regulating lead-based paint.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
1 U.S. Environmental Protection Agency Renovation, Repair and Painting Rule Presentation for NJ Lead and Beyond Conference, Edison, NJ April 16, 2010 Jeanette.
Tenant Paid Utility Allowances Cindy Ross Contract Management Services
Connecticut Department of Public Health Lead and Healthy Homes Program What You Should Know About EPA’s Lead Paint; Renovation, Repair, and Painting Rule.
Tulane University - Office of Environmental Health & Safety (OEHS) DEPARTMENTAL SAFETY REPRESENTATIVE (DSR) EXPECTATIONS Information For Tulane Employees.
October Module 1: Regulations - The RRP Rule Addresses activities that disturb lead-based paint in target housing and child-occupied facilities.
2010, 2011 Wisconsin Department of Health Services, Lake States Environmental, Ltd. and Jenny Rogalla Protecting Children from Lead Poisoning with Wisconsin’s.
DOCUMENTATION Missouri Medicaid Audit and Compliance Provider Certification Review Materials.
October Module 8: Training Non-Certified Renovation Workers Certified Renovators are responsible for teaching lead-safe work practices to non-certified.
Subchapter III: Company Certification Requirements.
October Module 2: Testing for Lead-based Paint Overview This module teaches you: To test for lead-based paint. To use EPA-recognized test kits.
HUD’s Lead Safe Housing Rule (LSHR)
Lead Dust Sampling Technician March Chapter 4 Selecting a Laboratory and Interpreting Results.
1 CHILDHOOD LEAD POISONING PREVENTIVE MAINTENANCE PROGRAM.
Lead Dust Sampling Technician March Chapter 1 Introduction.
Tennessee Department of Education Compliance Training February 2012 Department of Exceptional Children.
EPA’s New Requirements for Residential Contractors April 29, 2010.
October Module 7: Training Non-Certified Renovators Certified Renovators are responsible for teaching lead-safe work practices to non- certified.
World Health Organization
Georgia Department of Community Affairs Housing R R & P Issues Lead-Based Paint & (Asbestos) Compliance Georgia Environmental Protection Division Lead-Based.
October Module 2: Regulations U.S. Environmental Protection Agency (EPA): Established accredited training and certification programs for workers,
January 29, 2014 Community Development. Overview of the EPA Renovation, Repair and Painting Rule (RRP Rule) as it relates to the HUD Lead Safe Housing.
Lead-Based Paint Renovation, Repair, and Painting Program New England Lead Coordinating Committee November 19, 2009.
ESA Program Lead and Asbestos Safety Practices Presentation to the Low Income Oversight Board February 26, 2014 San Francisco, CA.
EService Process Descriptions. COSCA/NACM Standards for Electronic Filing Processes Technical and Business Approaches Section 1.2A Court rules may provide.
October Lead Safety for Renovation, Repair, and Painting Welcome and Introductions Please tell the class: Your name, the company you work for, and.
Lead Based Paint 101 September 2005 Liz Wilde X
2012 Lead Workshop Healthy Homes Section Plastic ground cover.
LEAD Hazard Awareness Module II Protect Our Children.
9/30/ Module 5 Talking to Clients and Planning Work.
MyLicense Website Access or
Pre-Renovation Education Program Jim Copeland Compliance Officer Healthy Homes Section Phone: (517) Fax: (517)
Long Term Care Certified Nurse Aide Instructor/Coordinator Certification Workshop Oklahoma Dept. of Career & Technology Education October 7, 2015 Nurse.
Lead-Based Paint Hazard Control Madison County Community Development Alan Dunstan, Madison County Board Chairman Frank Miles, Administrator.
IX-1 MOD IX - ADDRESSING LEAD IN YOUR MAINTENANCE PROGRAM  Explain management’s role in a lead maintenance program  Outline the fundamental components.
SFA At-Risk Afterschool Meal Program Training Recordkeeping and Monitoring.
What is the Home Care Referral Registry? The HCRR is a tool that you and your clients can use to search for and select eligible home care providers. The.
RRP Compliance Monitoring EPA performs inspections: – “For cause” (such as inspections based on tips and complaints) – Neutral scheme inspections, which.
October Lead Safety for Renovation, Repair and Painting Welcome and Introductions Please tell the class: Your name, the company you work for, and.
January 28, 2016 CDBG Small Cities. Does this look lead safe?
Standards for Technical Educators Occupational Safety & Health.
Lead-Based Paint Renovation, Repair, and Painting Overview of Final Rule and Implementation Discussion April 2008.
11 HUD’s Lead Safety Rules and EPA’s Lead in Renovation Rule Dr. Warren Friedman Office of Healthy Homes and Lead Hazard Control
Understanding EPA RRP Presented by:. EPA has issued a final rule under the authority of Section 402(c)(3) of the Toxic Substances Control Act (TSCA) to.
Rose Anne Rudd U.S. EPA, Region 4
Presented by: NAME HERE
Noticing Package NOTICING PACKAGE Melike Altun, EM.
CDRL E003 CFAT REPORT TEMPLATE
Lead-Based Paint Renovation, Repair, and Painting
How to manage the Electronic Signature Process
Pantry System Overview
Planning Services Meeting Client Communications
Compliance Manual Update Staff Requirements Check
Presentation transcript:

October Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made available to EPA, upon request, for 3 years following completion of renovation.

October On-The-Job Records Copies of Certified Firm and Certified Renovator certifications (must be kept on site) Lead-based paint testing results when an EPA- recognized test kit is used Laboratory results when a paint chip sample is obtained by a Certified Renovator Proof of owner/occupant pre-renovation education Non-certified worker training documentation

October Recordkeeping: Pre-Renovation Education Records In Target Housing – Individual units: Must acquire either written proof of receipt by an adult occupant or proof of delivery/unsuccessful delivery of Renovate Right, or: Written proof of receipt of Renovate Right by owner or proof of mailing (if mailing, send 7 days prior to renovation). In Target Housing - Common Areas (Two Options): Provide written notification to each affected unit and make Renovate Right pamphlet available on request; or: Keep copies or pictures of the signs and notices posted. In Child-Occupied Facilities Written proof of receipt of Renovate Right by owner or proof of mailing required (If mailing, send 7 days prior to renovation). Maintain proof of receipt by owner or adult representative, or certify in writing that the Renovate Right pamphlet has been delivered to facility. Keep copies or pictures of the signs and notices posted.

October Sample Confirmation of Receipt of Renovate Right  I have received a copy of the pamphlet, Renovate Right: Important Lead Hazard Information for Families, Child Care Providers and Schools. Recipient Signature:__________ Printed Name: __________ Date:__/__/__ Self-Certification Option (for tenant-occupied dwellings only) - If the lead pamphlet was delivered but a tenant signature was not obtainable, you may check the appropriate box below.  Refusal to sign.  Unavailable for signature. Gather the following information:  Printed name and signature of person certifying lead pamphlet delivery.  Date and time of lead pamphlet delivery.  Unit address.

October Recordkeeping: Non-Certified Worker Training Worker’s name. Description of lead safe work practices the worker is trained to perform. Completed and signed skills evaluation checklists. Date(s) of training. Name and signature of the Certified Renovator who conducted the training.

October Recordkeeping: Test Kit Reporting If an EPA-recognized test kit is used to test surfaces in the work area, the firm must: Submit a report to the person contracting for the work within 30 days after the end of the renovation, containing: Manufacturer and model of the EPA-recognized test kit. A description of the components tested. The location of components tested. Results of the testing. Retain a copy of the test kit documentation form.

Recordkeeping: Paint Chip Sample Results Reporting Paint chip sampling records must be maintained similarly to test kit results Submit a report to the person contracting for the work within 30 days after the end of the renovation, containing: Description and location of the components tested Dimensions of the area sampled, in cm and area in cm 2 Laboratory analysis results Retain a copy of lab results and client report October

October Recordkeeping: Post-Renovation Reporting Following a renovation, firms must document and share the following information Project information documenting compliance with renovation training, certification, and work practice requirements. If performed, documentation of dust clearance sampling. This information must be prepared, retained by the firm and shared with owners and occupants of housing and child-occupied facilities.

October Now You Know… To have records available at the work site of: Certifications for the Certified Firm and Certified Renovators. To retain all records for at least 3 years after completion of the renovation. To keep records of: Training and certifications for all renovation personnel, and for certification of the firm. Distribution of required information. Communications with and certifications from owners and residents. Work activities in compliance to the Rule. Post-renovation reports.