Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Hydronic Mechanical Controls
MQXF state of work and analysis of HQ experimental current decays with the QLASA model used for MQXF Vittorio Marinozzi 10/28/
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
CRYOGENICS AND POWERING
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Heat loads to Spectrometer Solenoid helium vessel Tapio Niinikoski Consultant to LBNL Spectrometer Solenoid Review October 25, 2010.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Cryogenic performance of new SS design, compared with Test 2B conditions (work in progress) Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10,
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
HD target.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MICE Spectrometer Solenoid Review A summary of P.Fabbricatore on behalf the review board Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold,
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
MICE Absorber and Focus Coil Magnet – Test Results
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Spectrometer Solenoid Update
Technical Summary - ANL
Cryogenic behavior of the magnet
Cryogenics – The Basics
Thermohydraulic behaviour of the cryogenic system
Presentation transcript:

Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 2 Outline o Purpose and goals of the Test Plan o Vacuum and leak testing o Tests during cooldown o Measurement of the heat load to the helium vessel and to the shield o Initial testing of individual coils and of all coils in series o Training of the coils and testing of quench protection o Conclusions

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 3 Purpose of the test plan o To foresee all instrumentation needed for the tests o To evaluate the needs of personnel needed for the tests o To develop a credible schedule for testing o To reserve space and other resources needed for the tests

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 4 Goals of the Test Plan Instrumentation: Development, debugging, consolidation The test plan helps in establishing the requirements for instrumentation Time should be allocated to the debugging of the instrumentation Validation of magnet and cryostat design: Characterization of steady state and transient behavior of the cryogenic system Training of the coils and mapping of the field Controls: Minimal automation is required in the testing Time should be allocated to tests aiming at the development of controls and interlocks

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 5 Vacuum and leak testing Instruments required: Pirani and ion vacuum gauges Helium mass spectrometer leak detector Residual gas analyzer (RGA), if available All level gauges must be turned “off” (risk of burning the sensor wire) The pressure/vacuum should be monitored and recorded: During all purge and evacuation operations (evacuation time constant gets shorter when water desorbs from the MLI) During the two phases of the cooldown Leak testing: Immediately after purging and final evacuation, leak check vacuum chamber and helium circuit against ambient; then leak check between helium circuit and the vacuum chamber. Foreseeable duration: 2 shifts (16 h)

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 6 Tests during cooldown First phase, using LN2 (about 8 hours; all cryocoolers are “off”) Record vacuum during whole cooldown Record all temperatures during the whole cooldown (coils, helium vessel, shield) Keep maximum  T ≤ 40 K by controlling the inlet temperature and flow rate of nitrogen; record the evolution of the good flow rate for future cooldowns Watch for any cold spots on the external envelope of the vacuum chamber (however, cold touches on VC are unlikely because the shield is not cooled in this phase); watch for cooling of the shield to detect cold touches with the helium vessel Stop before the coldest point of the solenoid reaches 78 K, trying to avoid accumulation of LN2 in the helium vessel Test presence of LN2 by evacuating the helium circuit while monitoring all temperatures; substantial cooling upon evacuation suggests the presence of liquid. If this happens, stop evacuation, turn on the heater on the bottom of the vessel, and monitor the pressure and temperatures. When there is no liquid in the vessel, evacuate N2 gas and purge with helium gas; check leak detector while purging with He gas.

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 7 Tests during cooldown (cont.) Second phase, using LHe (2 h to 3 h for coils, ≈ 24 h for shield) Start cryocoolers when helium circuit is filled with clean helium Record all the time all temperatures, vacuum and helium leak rate Keep maximum  T ≤ 40 K by controlling the flow rate of helium (this is done best by controlling the flow rate of He gas out of the magnet); an automatic flow controller might be handy Start recording the lowest level gauge when the lowest point in the coil reaches 30 K temperature; cooling becomes fast soon after this Monitor cold spots on the vacuum chamber and warm areas of the shield (to identify possible touches between the shield and the VC) After initial filling of the helium vessel, stop helium transfer and monitor boiloff rate, the transient behavior of which may correlate strongly with the transient of the shield temperatures When the outlet flow stops and the pressure of the helium bath drops below that of the helium outlet line (equipped with a check valve), the helium bath can be topped up using the LHe refill line

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 8 Measurement of the heat loads Static heat load measurement (24 to 48 h) The topmost level gauge, the bath pressure, and all temperatures will be recorded all the time. The vacuum and helium leak rate will be also recorded. The known cooling performance of the cryocoolers can be used as a measure of the heat load to the helium vessel and to the shield; this requires the knowledge of the temperatures of the cold heads If the heat load to the helium vessel is smaller than the cooling power at the recondensers, the boiling pressure of the helium bath will go down until the cooling power becomes identical with the heat load to the bath; in the opposite case the boiling pressure will increase and the check valve will let gas come out at a rate that balances the lack of cooling power. If the heat load is very much smaller than the cooling available at the recondensers, one or two of the cryocoolers can be turned off. After reaching a new equilibrium, it may be possible to measure the heat load more accurately It is important to monitor the temperature distribution of the shield over a long period of time, in view of getting an idea of the speed at which the MLI will settle in thermal equilibrium

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 9 Measurement of the heat loads Dynamic heat load measurement (16 h, partly during next item) The topmost level gauge, the bath pressure, and all temperatures will be recorded during all dynamics of the transients. The vacuum and helium leak rate will be also recorded. The known cooling performance of the cryocoolers can be used as a measure of the heat load to the helium vessel and to the shield; this requires the knowledge of the temperatures of the cold heads, but also the bath temperature and pressure will be used for obtaining the dynamic heat loads with precision. Ramping of the current in one or more of the coils will generate a heat load that can be determined from the recorded data. The eddy current heating of the shield will be monitored by the thermometers attached to it. Instabilities and TAO in the helium columns of the inlet and outlet lines will be monitored by the fast pressure gauges in them

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 10 Initial testing of coils During cooldown and after thermal stabilization (8 h) The evolution of the coil resistance is a good and direct measure of the speed at which its average temperature is dropping. Any irregular behavior of the resistance may suggest problems with a joint. The resistance is best measured with DC and with both polarities. The coil isolation with respect to the cryostat should be checked during the cooldown; this is particularly important during the first cooldown When the coils are at 4.2 K, it may be possible to use the voltage taps to detect bad joints, by inserting 5% to 20% of the maximum current to the coils. This is easiest to do with a bipolar supply that has a very low noise. An nV DVM is very useful here. After connecting the current supplies, the joint resistances and load due to the current leads can be determined calorimetrically with ≈ 20% of the maximum current, by determining accurately the increase in the heat load to the helium vessel. The dependence of the heat load on the current ramp speed can also be determined calorimetrically

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 11 Training of the coils and testing of quench protection Testing of the quench protection After the safe current ramp speed has been determined, and before training starts, it is important to first check that all quench protection devices are operational and activated; these are usually designed so that a complete check-up is easy to do The quench trigger is fired at low current, and the operation of all protection devices is monitored. The decay of the current of the coils is recorded as well as the pressure of the helium bath. All temperatures are recorded, even if the readout is not immediately operational during the transient. This may not be applicable to the spectrometer solenoids, unless some kind of quench heaters will be retrofitted in the system.

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 12 Training of the coils and testing of quench protection Training and quench recovery The safe current ramp speed is applied up to about 80% of the maximum design current For the last 20% and 10% of the maximum current, the ramp speed may have to be reduced, depending on the designed operational margins of the conductor in the highest field zones of the coils, and on the available margin of the cryocooler power The cooldown of the magnet after quench is done with the line entering to the bottom, and for the final filling the refill line is used It is important to record also the evolution of the shield temperature during and after the quench, in order to make sure that the proper steady state conditions are established before starting the cycle for the next training quench The integrity of the current leads should be checked before the next training cycle

Spectrometer Solenoid WorkshopTapio NiinikoskiPage 13 Conclusions Cryogenic performance The knowledge of the cryogenic performance is required for the good design of the control system, and for establishing safe practices for the operation of the magnets The heat load measurements can be compared with the predictions, which are still awaiting some input from the final mechanical design The work presented here is in progress. Further iterations and input from all are most welcome. Magnet performance Training results can be compared with the simulations, if the recorded data has the required time and temperature resolution Quench transients are predicted by the simulations presented by Soren Prestemon in this Workshop Field mapping can be done at full or partial current