EOQ: How much to order; ROP: When to order Re-Order Point (ROP) in periodic inventory system is the start of the period. Where is ROP in a perpetual system?

Slides:



Advertisements
Similar presentations
Re-Order Point Problems Set 1: General
Advertisements

Chapter 13: Learning Objectives
Stochastic Inventory Modeling
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Control Chapter 17 2.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
Inventory Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
12 Inventory Management.
1 Part II: When to Order? Inventory Management Under Uncertainty u Demand or Lead Time or both uncertain u Even “good” managers are likely to run out once.
12 Inventory Management.
Chapter 12 Inventory Management
Chapter 13 Inventory Systems for Independent Demand
Operations Management
Other Inventory Models 1. Continuous Review or Q System 2 The EOQ model is based on several assumptions, one being that there is a constant demand. This.
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Chapter 13 Inventory Management
Chapter 13 Inventory Management McGraw-Hill/Irwin
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management
Operations Management Inventory Management Chapter 12 - Part 2
Class 22: Chapter 14: Inventory Planning Independent Demand Case Agenda for Class 22 –Hand Out and explain Diary 2 Packet –Discuss revised course schedule.
11 Inventory Management CHAPTER
Inventory Management Ross L. Fink.
(a) : If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP? (b): If average demand per day is.
Customer Demand Customer demand varies in both timing and quantity:
Inventory Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MNG221- Management Science –
Managing Flow Variability: Safety Inventory
13 Inventory Management.
A) If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP. b) If average demand per day is 20 units.
Inventory- a stock or store of goods
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
1 Inventory Analysis under Uncertainty: Lecture 6 Leadtime and reorder point Uncertainty and its impact Safety stock and service level Cycle inventory,
1 Managing Flow Variability: Safety Inventory Forecasts Depend on: (a) Historical Data and (b) Market Intelligence. Demand Forecasts and Forecast Errors.
When to re-order with EOQ Ordering
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Economic Order Quantities (EOQs) The concept of an economic-order quantity addresses the question of how much to order at one time. The concept of an economic-order.
Inventory Management MD707 Operations Management Professor Joy Field.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Inventory Management. Learning Objectives  Define the term inventory and list the major reasons for holding inventories; and list the main requirements.
Budi Harsanto Dept. of Management & Business, Faculty of Economics, Universitas Padjadjaran Inventory Management.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 19 1.
Chapter 12 : Inventory Management Outline  The Importance of Inventory  Functions of Inventory  Types of Inventory.
13Inventory Management. 13Inventory Management Types of Inventories Raw materials & purchased parts Partially completed goods called work in progress.
STORES FUNCTIONS 1.RECEIPT2.STORAGE3.RETRIEVAL4.ISSUE 5.RECORD KEEPING 6.HOUSE KEEPING 7.SURPLUS MANAGEMENT 8.VERIFICATION9.COORDINATION.
1 Managing Flow Variability: Safety Inventory Forecasts Depend on: (a) Historical Data and (b) Market Intelligence. Demand Forecasts and Forecast Errors.
Multiple Choice 1. Inventory that is carried to provide a cushion against uncertainty of the demand is called A) Seasonal inventory B) Safety Stock C)
1. 2 Dependent VS Independent E(1) Independent Demand (Demand not related to other items) Dependent Demand (Derived)
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 18 1.
MBA 8452 Systems and Operations Management
Chapter 17 Inventory Control
Time Inventory Demand During Lead Time. LT ROP when demand during lead time is fixed.
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Managing Uncertainty with Inventory I
Chapter 13 Inventory Management McGraw-Hill/Irwin
Inventory Models (II) under SC environment
Assignment 5: Part (A) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings.
Functions of Inventory
Lecture 24 Order Quantities (Continued)
NATCOR Stochastic Modelling Course Inventory Control – Part 1
Managing Uncertainty in the Supply Chain: Safety Inventory
Chapter 12 Managing Uncertainty in the Supply Chain: Safety Inventory
Random Demand: Fixed Order Quantity
Inventory Management EOQ Model ROP-Reorder Point Safety Stock
a1) On average, how long a diskette spend in stock?
Managing Flow Variability: Safety Inventory
Managing Flow Variability: Safety Inventory
Slides by John Loucks St. Edward’s University.
Presentation transcript:

EOQ: How much to order; ROP: When to order Re-Order Point (ROP) in periodic inventory system is the start of the period. Where is ROP in a perpetual system? ROP in Perpetual System: Quantity on hand drops to a predetermined amount. If there were no variations in demand, and demand was really constant; ROP is when inventory on hand is equal to the [average] demand during lead time. Lead Time is the time interval from placing an order until receiving the order. When to re-order with EOQ Ordering

The greater the variability of demand during lead time, the greater the need for additional inventory to reduce the risk of shortage (i.e., the greater the safety stock). When variability exists in demand or lead time, actual demand during lead time may exceed average demand during lead time. If ROP is equal to average demand during lead time, there is 50% probability of satisfying all the demand. But we want this probability to be greater than 50%. We prefer 90%, 95%, or 99%. Safety Stock (SS): serves to reduce the probability of a stockout during the lead time. ROP in perpetual inventory control is the inventory level equal to the average demand during the lead time + a safety stock (to cover demand variability) When to re-order with EOQ Ordering

Example 1 Average demand for an inventory item is 200 units per day, lead time is three days, there is no variation in demand and lead time and therefore, safety stock is zero. What is the reorder point? In a perpetual inventory system, the ROP is the point at which inventory on hand is equal to the [average] demand in lead time plus safety stock. ROP = 3(200) Whenever inventory level drops to 600 units we place an order. We receive the order in 3 days. Because there is no variations in demand, there is no stock out.

Example 2 Average demand for an inventory item is 200 units per day, lead time is three days, and safety stock is 100 units. What is the reorder point In a perpetual inventory system, the ROP is the point at which inventory on hand is equal to the average demand in lead time plus safety stock. ROP = 3(200)+100 Whenever inventory level drops to 700 units we place an order. Since there is variation in demand, during the next three days, we may have a demand of 500, 600, 700, or even more.

Time Inventory Demand During Lead Time

LT ROP when demand during lead time is fixed

Time Inventory Demand During Lead Time

Demand During Lead Time is Variable

Inventory Time Demand During Lead Time is Variable

Average demand during lead time A large demand during lead time ROP Time Quantity Safety stock reduces risk of stockout during lead time Safety Stock Safety stock LT

ROP Time Quantity Safety Stock LT

When to re-order (ROP) Demand during lead time has Normal distribution. We can accept some risk of being out of stock, but we usually like a risk of less than 50%. If we order when the inventory on hand is equal to the average demand during the lead time; then there is 50% chance that the demand during lead time is less than our inventory. However, there is also 50% chance that the demand during lead time is greater than our inventory, and we will be out of stock for a while. We usually do not like 50% probability of stock out

RO P Risk of a stockout Service level Probability of no stockout Safety stock 0z Quantity z-scale Safety Stock and ROP Each Normal variable x is associated with a standard Normal Variable z x is Normal (Average x, Standard Deviation x)  z is Normal (0,1) There is a table for z which tells us Given any probability of not exceeding z. What is the value of z Given any value for z. What is the probability of not exceeding z Average demand

Common z Values RiskService levelz value RO P Risk of a stockout Service level Probability of no stockout Safety stock 0z Quantity z-scale Average demand

Relationship between z and Normal Variable x RO P Risk of a stockout Service level Probability of no stockout Safety stock 0z Quantity z-scale Average demand z = (x-Average x)/(Standard Deviation of x) x = Average x +z (Standard Deviation of x) μ = Average x σ = Standard Deviation of x RiskService z value level  x = μ +z σ

Relationship between z and Normal Variable ROP ROP Risk of a stockout Service level Probability of no stockout Safety stock 0z Quantity z-scale Average demand LTD = Lead Time Demand ROP = Average LTD +z (Standard Deviation of LTD) ROP = Average LTD +ss ss = z (Standard Deviation of LTD)

Safety Stock and ROP ROP Risk of a stockout Service level Probability of no stockout Safety stock 0z Quantity z-scale RiskService levelz value Average demand ss = z × (standard deviation of demand during lead time)

Do not listen to the rest of this lecture capture Do not listen to the rest of this lecture captur Do not listen to the rest of this lecture ca Do not listen to the rest of this lectur Do not listen to the rest of this lec Do not listen to the rest of this Do not listen to the rest of t Do not listen to the rest o