UNIVERSAL COLLEGE OF ENGG. AND TECH.

Slides:



Advertisements
Similar presentations
Traversing 1.
Advertisements

Theory of Measurements and Errors
Traversing 1.
SURVEY ADJUSTMENTS.
ADJUSTMENT COMPUTATIONS
Theodolite: Introduction
2 Acute Angles and Right Triangle
The Traverse المضلع Civil Engineering Students Year (1)
TRAVERSING Computations.
BASICS OF TRAVERSING H.U. MINING ENGINEERING DEPARTMENT
Class 25: Even More Corrections and Survey Networks Project Planning 21 April 2008.
Chapter 4 Traversing Definitions Traverse
Introduction to Traversing using distances and directions of lines between Traversing is the method of using distances and directions of lines between.
Location and Direction
Horizontal Control Horizontal control is required for initial survey work (detail surveys) and for setting out. The simplest form is a TRAVERSE - used.
GEODETIC CONTROL SURVEYS
E4004 Survey Computations A
Selected Problems from Chapter o.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Compass surveying.
Longitude North - South Meridians base point of world system is Greenwich, England Iowa - approximately 93 0 West.
CHAPTER 4 Coordinate Geometry and Traverse Surveying
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Traversing Chapter 9.
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
Surveying I. Lecture 10. Traversing.
Lecture 12- More Ellipsoidal Computations GISC February 2008.
1 Area Calculations. 2 Introduction  Determining the size of an area is a common problem of landscaping. Application of chemicals Amount of sod Number.
BALANCING A GOVERNMENT MEANDER LINE USING STATE PLANE COORDINATES
Coordinate Geometry and Traverse Surveying Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 8 - Week 5 2 nd Semester.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 7 Location and Direction.
TOPIC 5 TRAVERSING MS SITI KAMARIAH MD SA’AT LECTURER
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
How Errors Propagate Error in a Series Errors in a Sum Error in Redundant Measurement.
8-6 Vectors Holt Geometry.
Coordinate systems O.S. Grid Site Grid Norths Whole Circle Bearings
Join Calculation calculation of the
CE 453 – Horizontal / vertical reference systems and mapping.
ST236 Site Calibrations with Trimble GNSS
Theory of Errors in Observations Chapter 3 (continued)
Surveying for non-surveyors National Reference points whose Coordinates are known are used to determine coordinate value of points ( or stations) on site.
Traverse Computation 1) Calculation of starting and closing bearings;
1 TOPIC:- COMPUTATION OF BOUNDARY AREA NAMEPEN NO 1.RUCHIR MISTRY MIYANI DIKEN MOHIT KHANPARA MANSUR ADIL
Trigonometric Functions of Angles 6. Introduction The Law of Sines cannot be used directly to solve triangles if we know either: Two sides and the angle.
Submitted By: Mon Alfred B. Cabia Submitted To: Roberto Cabrera.
Chapter (4) Traverse Computations
Compass surveying.
Surveying 1 / Dr. Najeh Tamim
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
Theodolite: Introduction
Chapter 6 TRAVERSE.
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
Government Engineering College, Bhavnagar Civil Engineering Third Sem
THEODOLITE TRAVERSING BY S N Nanaware
Theory of Measurements and Errors
We have started to compute the traverse station
Angles and Directions.
Angles and Directions.
Local Attraction and Traverse
Angles and Directions.
Angles and Directions.
Acute Angles and Right Triangles
Surveying With Construction Applications, 7th Edition
Angles and Directions.
Angles and Determination of Direction
Horizontal and vertical angles
Latitudes and Departures
Revise No. II.
TRAVERSING.
CHAPTER 3 Engineering Surveying Traversing Survey and Computation By
Presentation transcript:

UNIVERSAL COLLEGE OF ENGG. AND TECH. SURVEYING

LATITUDE & DEPARTURE PREPARED BY : HENAL SONI 130460106102 NEEL PATWA 130460106075 DINESH PRAJAPATI 130460106078

Open Traverse Showing Deflection Angles Computation of Interior and Exterior Angle at STA 1 + 43.26

Closed Traverse Showing Interior Angles

Computation of Azimuths

Computation of Bearings

Step 1: Check Allowable Angle Misclosure where: c is the allowable misclosure in seconds K is a constant that depends on the level of accuracy specified for the survey n is the number of angles Federal Geodetic Control Subcommittee (FGCS) recommends: First order 1.7” Second-order class I 3” Second-order class II 4.5” Third-order class I 10” Third-order class II 20”

Step 2: Balance interior angles Sum of the interior angles must equal (n-2)180 degrees!

Procedures for Balancing Angles Method 1: Multiple Measurements: Use weighted average based on standard errors of angular measurements. Method 2: Single Measurements: Apply an average correction to each angle where observing conditions were approximately the same at all stations. The correction is computed for each angle by dividing the total angular misclosure by the number of angles. Method 3: Single Measurements: Make larger corrections to angles where poor observing conditions were present. This method is seldom used.

Step 3: Computation of Preliminary Azimuths or Bearings

Step 3: Computation of Preliminary Azimuths or Bearings (continued) Beginning at the reference meridian compute the azimuth or bearing for each leg of the traverse. Always check the last leg of the traverse to make sure that you compute the same azimuth or bearing as the reference meridian.

Step 4: Compute Departures and Latitudes

Step 4: Compute Departures and Latitudes (continued) departure = L sin (bearing) latitude = L cos (bearing)

Step 5: Compute Linear Misclosure (continued) Linear misclosure = [(departure misclosure)2 + (latitude misclosure)2]1/2

Step 6: Compute Relative Precision relative precision = linear misclosure / traverse length expressed as a number 1 / ? read as 1’ foot error per ? feet measured Example: linear misclosure = 0.08 ft. traverse length = 2466.00 ft. relative precision = 0.08/2466.00 = 1/30,000 Surveyor would expect 1-foot error for every 30,000 feet surveyed

Step 7: Adjust Departures and Latitudes Methods: Compass (Bowditch) Rule: correction in departure for AB = - [(total departure misclosure)/(traverse perimeter)](length of AB) correction in latitude for AB = - [(total latitude misclosure)/(traverse perimeter)](length of AB) Adjusts the departures and latitudes of the sides of the traverse in proportion to their lengths. Least Squares Adjustment: Rigorous but best method based on probabilistic approach which models the occurrence of random errors. Angle and distance measurements are adjusted simultaneously. Most computer programs employ a least square adjustment methodology. For more information on Least Squares Method see Chapter 15 in your textbook.

Step 8: Compute Rectangular Coordinates XB = XA + departure AB YB = YA + latitude AB

Step 8: Compute Rectangular Coordinates (continued) Compute the coordinates of all points on the traverse taking into account the signs of the latitudes and departures for each side of the traverse. Be sure to compute the coordinates of the beginning point (in this case A) so you can check to see if you have made any errors in your computations.

Signs of Departures and Latitudes North Departure (-) Latitude (+) Departure (+) Latitude (+) West East Departure (-) Latitude (-) Departure (+) Latitude (-) South