Chapter 16. Distinguish between job order costing and process costing.

Slides:



Advertisements
Similar presentations
Job Order and Process Costing
Advertisements

Basics of Job-Order Costing
Copyright © 2008 Prentice Hall. All rights reserved 3-1 Job Costing Chapter 3.
Copyright © 2008 Prentice Hall All rights reserved 4-1 Process Costing Chapter 4.
Chapter 2 Job Order Cost Systems.
Click to edit Master title style 1 Job Order Cost Systems 17.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Order Costing Chapter 4 2/14/05.
4 - 1 Job Order Costing Chapter Learning Objective 1 Describe the building-block concepts of costing systems.
Systems Design: Process Costing
Copyright © 2007 Prentice-Hall. All rights reserved 1 Process Costing Chapter 20.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Job Order Costing Chapter 19.
Job Order Costing Systems
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Transactions Work in Process Control: Job No ,000 Job.
19 Job Order Costing Accounting 26e C H A P T E R Warren Reeve Duchac
CHAPTER 19 JOB ORDER COSTING.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
Chapter 5 Job Order Costing
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Managerial Accounting
4 - 1 Job Order Costing – Chapter 4 Describe the building-block concepts of costing systems. Learning Objective 1.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Process Costing Chapter 4.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER20 Job Order Costing. CHAPTER20 Job Order Costing.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Job Costing Chapter 3.
Job Order and Process Costing
1 Copyright © 2008 Cengage Learning South-Western. Heitger/Mowen/Hansen Job-Order Costing Chapter Four Fundamental Cornerstones of Managerial Accounting.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 13 Job Costing Systems.
20 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Job Costing Chapter 20.
27-1. Job Order Cost Accounting Section 1: Cost Accounting Chapter 27 Section Objectives 1.Explain how a job order cost accounting system operates. McGraw-Hill©
Job Order Costing Chapter 2 Learning Objectives
Cost Accounting Systems
JOB ORDER COST ACCOUNTING
Costing of Job Orders and Processes Albee Barretto Matt Casilan Patrick Lim.
Lecture 6 COSTING SYSTEMS 1 Job Costing Reference : Course Text Chapter 2.
Is it a complex process for Washburn Guitars to accumulate the cost of each Maya Series guitar? 1.Yes 2.No.
Chapter 17 Job Order Costing
Chapter 18 Process Costing
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. Process Costing Chapter5 1.
Traditions and Innovations
Introduction to Managerial Accounting Chapter M1.
Click to edit Master title style 1 Lesson Click to edit Master title style 2 Job Order Cost Systems 19.
Chapter 16. Distinguish between job order costing and process costing.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective Distinguish actual costing from normal costing.
A control account is a summary account within a general ledger that accumulates the details of an account in a subsidiary ledger.
Chapter 18 Process Costing. Describe the flow of costs through a process costing system 18-2.
Copyright © 2015 McGraw-Hill Education. All rights reserved
Job-Order Costing: A Microsoft Excel-Based Approach
Chapter 17 Job Order Costing
Chapter 3 Costing Systems: Job Order Costing
Chapter 4 Chapter 3 Job Order Costing Job Order Costing.
Job Order and Process Costing
Job-Costing and Process-Costing Systems
Chapter 4 Job Costing.
Job Order Costing Chapter 2.
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
2 Job Order Costing Learning Objectives
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
Systems Design: Job-Order Costing
17 Job Order Costing Financial and Managerial Accounting 13e
CHAPTER 4 Job Costing © 2009 Pearson Prentice Hall. All rights reserved.
Chapter 17 Job Order Costing
Chapter 17 Job Order Costing Student Version
Process Costing Chapter 04 Chapter 4: Process Costing
Cornerstones of Managerial Accounting 2e
© 2015 Pearson Education, Limited.
CHAPTER 4 Job Costing © 2012 Pearson Prentice Hall. All rights reserved.
2 Job Order Costing Managerial Accounting 13e C H A P T E R Warren
CHAPTER 4 Job Costing © 2012 Pearson Prentice Hall. All rights reserved.
Presentation transcript:

Chapter 16

Distinguish between job order costing and process costing

 Gather information to determine the production cost per unit  Help managers: ◦ Set selling price so profit can be earned ◦ Compute cost of goods sold  Income Statement ◦ Compute cost of inventory  Balance sheet  Assign costs to products using one of two systems: ◦ Job order costing ◦ Process costing 3Copyright (c) 2009 Prentice Hall. All rights reserved.

Job Order CostingProcess Costing  For companies that manufacture batches of unique products or specialized services ◦ Accounting firms ◦ Music studios ◦ Building contractors ◦ Health-care providers  Accumulates cost per batch or job  More prevalent with service-based economies and ERP systems  For companies that produce identical units through a series of processes ◦ Large producer of similar goods  Accumulates cost of each process needed to complete the produce 4Copyright (c) 2009 Prentice Hall. All rights reserved.

Record materials and labor in a job order costing system

6 Direct materials Direct labor Manufacturing overhead Direct materials Direct labor Manufacturing overhead Job 1 Job Cost Record Work in process inventory Costs incurred in Job 1 Costs incurred in Job 1 Finished goods inventory Costs of Completed Job 1 Costs of Completed Job 1 Cost of goods sold Costs of Job 1’s output when sold Costs of Job 1’s output when sold Ledger accounts Copyright (c) 2009 Prentice Hall. All rights reserved.

7 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Materials inventory Accounts payable Subsidiary Materials Ledger Card Item No. ________Description _________________________ DateReceivedUsedBalance UnitsCostTotalUnitsCostTotalUnitsCostTotal Purchases Copyright (c) 2009 Prentice Hall. All rights reserved.

8 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Work in process inventory Manufacturing overhead Materials inventory Subsidiary Materials Ledger Card Item No. ________Description _________________________ DateReceivedUsedBalance UnitsCostTotalUnitsCostTotalUnitsCostTotal Requisitioned Direct materials Indirect materials Copyright (c) 2009 Prentice Hall. All rights reserved.

9  Used to authorize the use of materials on a job  Serves as a source document for recording material usage Copyright (c) 2009 Prentice Hall. All rights reserved.

10 Materials inventory Material Purchases Direct Materials Accounting for Materials Indirect materials Indirect Materials Manufacturing overhead Work in process Copyright (c) 2009 Prentice Hall. All rights reserved.

11Copyright (c) 2009 Prentice Hall. All rights reserved.

12 Work in process Incurred Direct Materials Manufacturing wages Accounting for Labor Manufacturing overhead Actual Overhead Costs Indirect Labor Direct Labor Copyright (c) 2009 Prentice Hall. All rights reserved.

13 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Manufacturing wages Wages payable Includes both direct and indirect labor Copyright (c) 2009 Prentice Hall. All rights reserved.

14 J. Khan K13 J hours $11.25 $78.75 Copyright (c) 2009 Prentice Hall. All rights reserved.

15 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Work in process inventory Manufacturing overhead Manufacturing wages Zeroes out Manufacturing wages accounts Copyright (c) 2009 Prentice Hall. All rights reserved.

Record overhead in a job order costing system

17 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Manufacturing overhead Accumulated depreciation Manufacturing overhead Cash Manufacturing overhead Property taxes payable Copyright (c) 2009 Prentice Hall. All rights reserved.

 Actual overhead costs are debited to the Manufacturing overhead account  Overhead costs are essential to production  Must be assigned to specific jobs to determine full cost  A predetermined overhead rate is used 18Copyright (c) 2009 Prentice Hall. All rights reserved.

19 Total estimated manufacturing overhead costs Total estimated quantity of the manufacturing overhead allocation base Primary cost driver of overhead costs Examples: Direct labor hours Direct labor cost Machine hours Examples: Direct labor hours Direct labor cost Machine hours Copyright (c) 2009 Prentice Hall. All rights reserved.

20 Allocated manufacturing overhead cost Actual quantity of allocation base used on the job Predetermined overhead application rate Copyright (c) 2009 Prentice Hall. All rights reserved.

21 GENERAL JOURNAL DATEDESCRIPTION REF DEBITCREDIT Work in process Manufacturing overhead Copyright (c) 2009 Prentice Hall. All rights reserved.

Work in process Direct Materials Accounting for Manufacturing Overhead Manufacturing overhead Actual Overhead Costs Overhead Allocated Direct Labor 22Copyright (c) 2009 Prentice Hall. All rights reserved.

Record completion and sales of finished goods and the adjustment for under- or overallocated overhead

24 GENERAL JOURNAL DATEDESCRIPTIONREFDEBITCREDIT Finished goods Work in process Accounts receivable Sales revenue Cost of goods sold Finished goods Copyright (c) 2009 Prentice Hall. All rights reserved.

25 Work inpProcess Direct MaterialsDirect Materials Direct LaborDirect Labor Manufacturing OverheadManufacturing Overhead Finished goods Cost of Goods Manufactured Cost of goods sold Cost of Goods Sold Accounting for Finished Goods Cost of Goods Manufactured Copyright (c) 2009 Prentice Hall. All rights reserved.

26 GENERAL JOURNAL DATEDESCRIPTIONREFDEBITCREDIT (a)Advertising expense2,100 Cash2,100 (b)Manufacturing wages17,000 Cash17,000 (c)Materials inventory15,000 Accounts payable15,000 Copyright (c) 2009 Prentice Hall. All rights reserved.

27 GENERAL JOURNAL DATEDESCRIPTIONREFDEBITCREDIT (d)Work in process9,000 Manufacturing overhead1,500 Materials inventory10,500 (e)Work in process9,350 Manufacturing overhead7,650 Manufacturing wages17,000 Copyright (c) 2009 Prentice Hall. All rights reserved.

28 GENERAL JOURNAL DATEDESCRIPTIONREFDEBITCREDIT (f)Manufacturing overhead16,100 Accumulated depreciation11,000 Prepaid insurance1,000 Property taxes payable4,100 (g)Work in process14,960 Manufacturing overhead14,960 ($9,350 Direct labor x 160%) Copyright (c) 2009 Prentice Hall. All rights reserved.

29 GENERAL JOURNAL DATEDESCRIPTIONREFDEBITCREDIT (h)Finished goods32,000 Work in process32,000 (i)Accounts receivable24,000 Sales revenue24,000 Cost of goods sold16,000 Finished goods16,000 Copyright (c) 2009 Prentice Hall. All rights reserved.

30 Manufacturing overhead Actual costsApplied to jobs If actual costs are greater, overhead is underallocated If amount applied to jobs is greater, overhead is overallocated Adjusting Under- or Overallocated Manufacturing Overhead Copyright (c) 2009 Prentice Hall. All rights reserved.

 The underallocated or overallocated overhead amount is closed to Cost of goods sold 31 GENERAL JOURNAL DATEDESCRIPTIONDEBITCREDIT Cost of goods sold Manufacturing overhead If underallocated, Cost of goods sold increases GENERAL JOURNAL DATEDESCRIPTIONDEBITCREDIT Manufacturing overhead Cost of goods sold If overallocated, Cost of goods sold decreases Copyright (c) 2009 Prentice Hall. All rights reserved.

Calculate unit costs for a service company

 Have no inventory  Managers need to know the cost of jobs to set prices 33 Cost of Job X$1,000 Standard markup of 40% 400 Sale price of Job X$1,400 Copyright (c) 2009 Prentice Hall. All rights reserved.

 Often service companies largest cost is labor  Employees keep track of time spent on each client or job ◦ Manually using a time record ◦ Automated system 34 Hourly rate to the employer Employee’s annual salary 2,000 work hours per year Copyright (c) 2009 Prentice Hall. All rights reserved.

35 Hourly direct labor costs Direct labor costs Direct labor hours $2,150,000 14,000 hours $ Copyright (c) 2009 Prentice Hall. All rights reserved.

36 Predetermined indirect cost allocation rate Expected indirect costs Expected direct labor hours Office rent$260,000 Support staff 850,000 Utilities 350,000 Total$1,460,000 14,000 hours $ Copyright (c) 2009 Prentice Hall. All rights reserved.

37 $ Hourly direct labor costs Predetermined indirect cost allocation rate $ Service cost per hour $ hours $67,044 Copyright (c) 2009 Prentice Hall. All rights reserved.

38 $67, % $103,918 Round to $104,000 Copyright (c) 2009 Prentice Hall. All rights reserved.

Process Costing: Weighted-average method

 Used by companies who manufacture large quantities of similar products  Building blocks ◦ Conversion costs  Direct labor and manufacturing overhead  Costs incurred to convert materials into finished products ◦ Equivalent units  Allows measurement of partially finished goods  Percent complete estimated for goods in process  Materials may have different percent complete than conversion costs 40Copyright (c) 2009 Prentice Hall. All rights reserved.

41 Cost of goods sold Manufacturing wages Materials inventory Finished goods Manufacturing overhead Work in Process Job 90 Job 91 Job 92 Copyright (c) 2009 Prentice Hall. All rights reserved.

42 Cost of goods sold Manufacturing wages Materials inventory Finished goods Work in process, Mixing Dept Work in process, Molding Dept Work in process, Packaging Dept Manufacturing overhead Copyright (c) 2009 Prentice Hall. All rights reserved.

Summarize the flow of physical units Compute output in equivalent units Compute the cost per equivalent unit Assign costs to completed and ending inventory units 43Copyright (c) 2009 Prentice Hall. All rights reserved.

Department 1 Physical units DollarsPhysical units Beginning inventory0$ 0Transferred out40,000 Production started50,000 Direct materials$140,000 Conversion costs Direct labor20,000 Manufacturing overhead48,000 Total to account for50,000$208,000 Ending inventory-25% complete 10,000 44Copyright (c) 2009 Prentice Hall. All rights reserved.

45Copyright (c) 2009 Prentice Hall. All rights reserved. Ending WIP units are 25% complete as to conversion costs

Department 1 Direct materials Conversion costs Beginning work in process00 Costs added$140,000$68,000 Divide by equivalent units÷ 50,000÷ 42,500 Cost per equivalent unit$2.80$ Copyright (c) 2009 Prentice Hall. All rights reserved.

47Copyright (c) 2009 Prentice Hall. All rights reserved.

48 GENERAL JOURNAL DATEDESCRIPTIONDEBITCREDIT Work in process – Dept. 2176,000 Work in process – Dept. 1176,000 Copyright (c) 2009 Prentice Hall. All rights reserved.

49 Work in process – Dept , ,000 Work in process - Dept. 1 Copyright (c) 2009 Prentice Hall. All rights reserved. 20,000 48,000 32,000 Direct materials Direct labor Manufacturing overhead Completed and transferred out Ending WIP