QMS Tips and Traps (ISO TS16949)

Slides:



Advertisements
Similar presentations
ISO 9001:2000 Documentation Requirements
Advertisements

Environmental Management System (EMS)
QA Programs for Local Health Departments
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
How to Document A Business Management System
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
Product and Process Measures Drive Continuous Product Quality and Business Improvement Angelo G. Scangas, President Quality Support Group, Inc
4. Quality Management System (QMS)
Auditing OEM Customer Specific Requirements under ISO/TS 16949
Basics of Good Documentation Document Control Systems
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
Fundamentals of ISO.
Measurement System Analysis (MSA) Discussions at CSIR S.A
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
How the ISO/TS Additions have moved from 1st to 2nd edition
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
ISO 14001:2004, Environmental Management System
Visit us at E mail: Tele:
Being Audited – Life on the Other Side of the Fence.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
QOS_ISO/ TS_20021 BSC Balanced ScoreCard QOS Quality Operating System.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
A QUALITY IMPROVEMENT TOOL
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Supplier Performance Development Process
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
So where in ISO is Process?
Awareness program on ISO/TS16949:2002
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
Fundamentals of ISO.
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Identification of Processes Turtle Diagrams Approach
Quality Management Systems – Requirements
Supplier Performance Development Process
Process Maps and Turtle Diagram Example
TURTLE DIAGRAM GAGE CALIBRATION
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
Process Name ___________________
Identification of Processes Turtle Diagrams Approach
ISO 9001:2008 Quality Management Systems
Supplier Performance Development Process
TS Training Presented by: Internal Auditor Training.
Company X Process Mapping Training
Identification of Processes Turtle Diagrams Approach
HOW TO AUDIT AND TAKE AN AUDIT
Identification of Processes Turtle Diagrams Approach
Nonconformity Writing
Presentation transcript:

QMS Tips and Traps (ISO TS16949) Presented by: Bert Scali Scali Consulting & Training 216-513-9147

Customer Satisfaction If the customers are not happy, the auditor is not happy. Score cards with unacceptable performance generate NC (8.2.1) Poor customer satisfaction could be a symptom of processes that are failing (What is it that could have failed and caused the complaint/return/issue with the customer?) Internal failures could be a leading indicator to let you know that customer complaints are coming

QMS - General Process names to match throughout the organizations’ documentation (From the organization’s Manual, process description and the flow-down to other related docs the organization may have, i.e. turtles, maps, process flows, audit schedules, mgt. review… )

Sales (7.2.1 d) any additional requirements considered necessary by the organization. “Customer Specific Requirements/Supplier Manuals – considered at time of RFQ/Contract to ensure ALL requirements can be met” (7.2.2.2) Risk Analysis ( compressed lead time, financial, investment, volume, new processes, new materials, new suppliers, new CSR’s…)

Document Control 4.2.3.1 Engineering specs and standards External documents controlled, available, known and implemented within the processes where these apply (i.e. CSR/supplier manuals…) 4.2.4 Retention timing of records to be consistent with CSR’s (and sometimes for documents – depending on customer requirements)

Purchasing 7.4 Which Vendors are being developed now? 7.4.3.2 Vendor performance measurables called out in section 7.4 must be used as a minimum (Quality, Delivery, Customer disruptions, special status and premium freight) 7.4.3.2 The organization shall promote supplier monitoring of the performance of their manufacturing processes (How are you doing that now?)

Resources / Training and Competency Training looked at from company’s eyes is different than auditors CSR and their linked additional documents applicable to company are top priority, then TS, Design methods / Core tools, Job / work related skills, OTJ Effectiveness of training and other actions determined Motivation methods and measuring results of motivation in achieving objectives

Resources / Training and Competency Awareness of resources, especially with downsizing/rightsizing… is everything that needs to get done still getting done? Are performance indicators suffering due to inadequate resources? Are customer complaints increasing or are these related to inadequate resources? Is the system being maintained while resource adjustments are being made?

CALIBRATION / MSA 7.6.2 Records of calibration… shall include… “revisions following engineering changes” Calibrate within the instruments measurement range 7.6.1 MSA for ALL gages called out in Control Plan NDC : Should be 5 of higher 7.6.2 Appropriate studies… (i.e. Bias, Linearity and Stability Studies) Internal lab scope (inspection, test or calibration…)

APQP/PPAP Inputs defined, documented and reviewed Where are these documented? What day where these reviewed and by whom? Where are the action items for Red/Yellows and what date do these need to be completed by? PPAP package includes internal and external laboratory Scope Master samples identified with customer approval date?

PPAP/NC Product Only the customer can provide a waiver to ship product that is different than PPAP/ NC product different than print requirements Get all customer waivers in writing and keep as quality records Complete PPAP – then submit the level the customer wants Don’t lose your PPAP records (scan for back up) – “Active + 1 Year”

INTERNAL AUDIT Processes defined by organization are the processes that are to be audited (same process names from manual, to audit schedule, and to audit records) Evidence that internal auditors did audit the CSR’s applicable to the organization Only internal audit results reported in Management review (the standards states that “Audit results” are the input, not just internal audits, so external audit results need to be included

Tips Consider Active and Passive criteria for process performance Process descriptions not always clearly defined, understood, known or explained to the auditor. (Why are we still talking about processes descriptions, years after the standard/specification became effective?)

Tips Criteria should include Effectiveness and Efficiency of the processes Only the COPS have metrics? Only Core Processes have metrics? Only Manufacturing processes have metrics? Should define measurables and pulse checks that helps management make better decisions

Tips Separate Automotive vs. non-automotive measurables, such as customer score cards, customer performance (separate so you know what your TS certified system is actually doing - remember that TS only covers automotive production and service parts). Link all cases of poor Customer score cards/performance/complaints to a corrective action for analysis.

Tips If Ford is a customer – the trainer of the internal auditors must meet additional requirements (Ford CSR # 4.39.1, 4.39.2 and 4.39.3). Evidence that CSR’s, Core tools, FAQ and Sanctioned interpretations were part of the internal auditing training / competency

Tips Get a written customer deviation if you only want to do 30 piece capability studies Any issues with PPAP to OEM’s can easily generate a Major NC during a 3rd party audit Rely on your internal audits to tell you the system is working, don’t wait for the third party auditor to break the news to you. These need to be more detailed and depth than 3rd party audits (Peel the onion)