Module 4: Fundamentals of Wastewater Treatment Wastewater Treatment Plant Operator Training.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
Clarifier Calculations
CE 370 Sedimentation.
Treatment of Slaughterhouse Wastewater
1 CTC 450 Review Preliminary & Primary Treatment Preliminary & Primary Treatment Measure flow Measure flow Screen Screen Grit chamber Grit chamber Primary.
Biological waste water treatment
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
An-Najah National University Civil Engineering Department
FE Review for Environmental Engineering Problems, problems, problems Presented by L.R. Chevalier, Ph.D., P.E. Department of Civil and Environmental Engineering.
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping Treatment.
Math Basics I Area, Volume, Circumference, Converting Inches to Feet, Converting Flow, Converting Percent/Decimal Point, Decimal Point, Detention Time.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Review of Settling AKA sedimentation – suspended solids removed from liquid phase by gravity Common applications in Wastewater Treatment – grit chamber,
DESIGN OF WASTEWATER TREATMENT PLANT
Water, Part 2 Wastewater Treatment Primary Chapter: 11 Supplemental Chapters: 8, 9 1.
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
Attached Growth Biological WW treatment Systems
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
ACTIVATED SLUDGE PROCESS
Lecture 6: Water & Wastewater Treatment
SETTLING TANKS.
Domestic Waste Water Treatment
7.1 Wastewater Treatment Process
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping.
Pounds Formula Prepared By Michigan Department of Environmental Quality Operator Training and Certification Unit.
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
WASTEWATER STABILIZATION LAGOON PROCESS
PHOSPHORUS REMOVAL FOR LAGOON OPERATORS WHY THE CONCERN OVER P.
ANAEROBIC SLUDGE DIGESTION PROCESS Prepared By Michigan Department of Environmental Quality Operator Training and Certification Unit.
Why do we need to treat wastewater ?
IV. Wastewater Treatment Technologies Topic IV. 7
Wastewater Treatment Processes
DECENTRALISED WASTEWATER TREATMENT AND REUSE Components and Designing
Chapter 11 Wastewater Treatment. On-Site Disposal Systems Septic Tanks Pit Toilets.
Lecture 6: Water & Wastewater Treatment Objectives: Objectives: Define primary, secondary, and tertiary treatment Define primary, secondary, and tertiary.
Chapter 10 Test Formula Review.  Find the circumference of a circle with a diameter of 10. Identify the formula needed for the following questions.
DESIGN OF WASTEWATER TREATMENT PLANT
5.6 SEDIMENTATION Objective
Environmental Engineering (Wastewater treatment) Core Course Laboratory of Environmental Engineering & Planning Department of Civil Engineering Aristotle.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
CE 356 Fundamental of Environmental Engineering
CTC 450 Review WW Collection Systems Types of pipes Installation.
WATER MANAGEMENT.
Conventional Sewage Treatment Plants:
WASTEWATER.
National University Of Kaohsiung Taiwan
Chapter 7 - Fundamentals of Biological Treatment
Attached Growth Biological WW treatment Systems
Modified Ludzack-Ettinger Wastewater Plant
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Wastewater Treatment Dr.Gulve R.M..
Wastewater Treatment.
CTC 450 Review Preliminary & Primary Treatment Measure flow Screen
Methods for Wastewater and Sludge Treatment
Individual Household Treatment Systems (Septic Tanks)
Sizing Septic Tank Volume:
Wastewater Facilities Upgrade Project
Wastewater Treatment Secondary Treatment.
Wastewater Treatment Secondary Treatment.
Clarifier Calculations Prepared By Debremarkos Department of HWRE Water treatment unit.
Presentation transcript:

Module 4: Fundamentals of Wastewater Treatment Wastewater Treatment Plant Operator Training

Learning Objectives Explain the general purpose of preliminary treatment. Explain the purpose of screening, grit removal, and pre-aeration. Differentiate between manually and mechanically cleaned racks and screens. Define differences between screening and comminution. Describe safe disposal of screenings and grit. Unit 1–Preliminary Treatment 2

Manually Cleaned Bar Screen 3 Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I. AERATION TANK

Mechanically Cleaned Bar Screen 4 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

5 Aerated Grit Chamber AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Cyclone Separator 6 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Grit Washer 7 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Comminutor 8 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Comminutor with By-Pass Screen 9 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Barminutor 10 AERATION TANK Diagram excerpted from Chapter 4: Racks, Screens, Comminutors and Grit Removal. In Operation of Wastewater Treatment Plants Volume I.

Learning Objectives Explain sedimentation and flotation principles. List factors that indicate a clarifier is not performing properly. Use mathematical formulas to solve for detention time, weir overflow, surface loading, and solids loading. Unit 2–Primary Treatment: Sedimentation & Flotation 11

Detention Time Formulas 12 Formulas Detention Time, hr. = Tank Volume, cu ft x 7.5 gal/cu ft x 24 hr/day Flow, gal/day Rectangular Tank Volume, cu ft = Length, ft x Width, ft x Height (Depth), ft Area of Circle, ft 2 = (0.785)(Diameter 2 ) or (  )(Radius 2 ) Note:  = 3.14 Circular Tank Volume, cu ft = Area x Height (Depth), ft Circular Tank Volume, cu ft = (0.785)(Diameter, ft) 2 x Height (Depth), ft or (3.14)(Radius, ft) 2 x Height (Depth), ft

What is the detention time when… The flow is 3.0 million gallons per day (MGD) or 3,000,000 gal/day, and Tank dimensions are 60 feet long by 30 feet wide by 10 feet deep? Detention Time: Sample

Given: Volume= 60 feet by 30 feet by 10 feet = 18,000 cu ft Step #1 - Volume 14

Given: Flow = 3.0 million gallons per day (MGD) or 3,000,000 gal/day Step #2 - Flow 15

Detention= Tank Volume, cu ft x 7.5 gal/cu ft x 24 hr/day Time, hr Flow, gal/day = 18,000 cu ft X 7.5 gal/cu ft x 24 hr/day 3,000,000 gal/day = 3,240,000 gal/hr/day 3.0 MGD = 1.08 hours Step #3 - Calculation 16

What is the detention time when… The flow is 2.5 million gallons per day (MGD), and Circular clarifier is 60 ft in diameter with a depth of 12 ft? Detention Time: Sample

Reminder: Circular Tank Volume, cu ft = x (Diameter, ft) 2 x Depth, ft Volume = (0.785) x (60 ft) 2 x 12 ft deep = 33,912 cu ft Step #1 - Volume 18

Given: Flow = 2.5 million gallons per day (MGD) or 2,500,000 gal/day Step #2 - Flow 19

Detention Time, hr= 33,912 cu ft x 7.48 gal/cu ft x 24 hr/day 2.5 MGD = 6,087,882 gal/hr/day 2,500,000 gal/day = 2.44 hours Step #3 - Calculation 20

Formulas Weir Overflow, gpd/ft = Flow Rate, GPD Length of Weir, ft Length of Circular Weir = 3.14 x Weir Diameter, ft Weir Overflow Rate 21

What is the weir overflow rate when… The flow rate into the unit is 3.5 MGD, and The circular clarifier has a 75 foot diameter overflow weir Weir Overflow Rate: Problem

Weir overflow rate, gpd/ft = 3,500,000 gallons/day 3.14 x 75 feet = 3,500,000 gal/day feet = 14,862 gpd/ft Weir Overflow Rate: Problem

What is the surface loading rate when… The flow into a rectangular clarifier is 5.0 MGD The clarifier is 40 feet wide by 110 feet long by 12 feet deep – Reminder: Surface loading rate, gpd/ft 2 = Flow Rate, gpd Surface area, ft 2 Surface Loading Rate: Problem

Surface loading rate, gpd/ft 2 = 5,000,000 gallons/day 40 ft x 110 feet = 5,000,000 gal/day 4400 ft 2 = 1,136 gpd/ft 2 Surface Loading Rate: Problem

Pa DEP - Domestic Wastewater Facilities Manual Operation of Wastewater Treatment Plants, Vol I Primary ClarifiersNot consideredNot generally considered Conventional Activated Sludge Secondary Clarifiers 40 #/day/sq ft average, 50 peak 12 to 30 lbs/day/sq ft Extended Aeration Secondary Clarifiers 30 #/day/sq ft average, 50 peak N/A Nitrification Secondary Clarifiers: Separate Nitrification Stage 30 average, 50 peakN/A Carbonaceous Stage45 average, 50 peakN/A Dissolved-Air Flotation40 #/day/sq ft (w/o polymer addition), 20 #/day sq ft (w polymer addition) 5 to 40 lbs/day/sq ft Sludge Thickening5 to 12 #/day/sq ft5 to 20 lbs/day/sq ft Solids Loading Guidelines 26

Formulas Solids Loading, lbs/day/ft 2 = Solids Applied, lbs/day Surface Area, ft 2 – Solids Applied, lbs/day = Flow, MGD x Conc., mg/L x 8.34 lbs/gal Solids Loading 27

Calculate the solids loading at which a clarifier is operating given the following… The circular clarifier has a diameter of 125 feet Forward flow is 6.0 MGD and the return sludge flow is 2.0 MGD MLSS is mg/L Solids Loading: Problem

Reminder: Solids Applied, lbs/day = Flow, MGD x MLSS conc., mg/L x 8.34 lbs/gal Solids Applied = 8 MGD x 4,000 mg/L x 8.34 lbs/gal = 266,880 lbs/day Step # 1 - Solids Applied 29

Given: The circular clarifier has a diameter of 125 feet Area of Circle, ft 2 = (0.785)(Diameter) 2 = (0.785)(125 ft) 2 = (0.785)(15,625 ft 2 ) = 12,266 ft 2 Step # 2 – Surface Area 30

Solids Loading, lbs/day/ft 2 = Solids Applied, lbs/day Surface Area, ft 2 = 266,880 lbs/day 12,266 ft 2 = 22 lbs/day/ft 2 Step # 3 – Solids Loading 31

Learning Objectives List four biological secondary treatment processes. Explain the principles of the trickling filter process. Identify the different types of trickling filters. Explain the principles of the rotating biological contactor (RBC) process. Explain the principles of the activated sludge process. List the three waste treatment pond classifications and explain the principles of each. Unit 3–Overview of Biological Secondary Treatment 32

Trickling Filter Process 33 AERATION TANK

Trickling Filter 34 Diagram excerpted from Chapter 6: Trickling Filters. In Operation of Wastewater Treatment Plants Volume I. AERATION TANK

Rotating Biological Contactor Process 35 AERATION TANK

Complete Mix Activated Sludge 36

37 Contact Stabilization Schematic AERATION TANK

38 AERATION TANK Extended Aeration Schematic

Two Unit SBR Time Chart 39 Time Period (hrs)Unit #1Unit # FillAeration 1 - 2FillSettle 2 - 3Fill / AerationSettle 3 - 4Fill / AerationDraw 4 - 5AerationFill 5 - 6SettleFill 6 - 7SettleFill / Aeration 7 - 8DrawFill / Aeration

Oxidation Ditch Schematic 40 AERATION TANK