February 2012 CMWG Constraints Competitiveness Tests (CCT)

Slides:



Advertisements
Similar presentations
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Market Solution 1 Definitions Market Solution A Market Solution exists when at least three unaffiliated Resources, with capacity available, submit bids.
SCED Power Balance Penalty Curve
Critique of Proposal to Designate SAPS-Shrew as CRE Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) June 4, 2009.
1 Measuring Market Structure. 2 Concentration ratios We have seen that the two polar extremes of market structure are monopoly, with one firm, and perfect.
Real-Time Transmission Congestion Management & Market Effects
Discrete Structures Chapter 2 Part A Sequences Nurul Amelina Nasharuddin Multimedia Department.
Finance 510: Microeconomic Analysis
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Fundamentals of Corporate Finance, 2/e ROBERT PARRINO, PH.D. DAVID S. KIDWELL, PH.D. THOMAS W. BATES, PH.D.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Nothing below this point Subtitle Nothing below this point Congestion.
Proposed Revision to the Shadow Price Cap and Power Balance Penalties in SCED Same Transmission Element.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Managerial Economics Demand Estimation & Forecasting.
Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Monopolistic Competition and Oligopolies. Monopolistic Competition Companies offer differentiated products yet face competition Companies face downward.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
1 Capacity Forecast Report Mark Ruane Director, Market Credit CWG / MCWG March 10, 2015 ERCOT Public.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
Congestion Management Working Group WMS update 11/7/2012.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 WMS Report TO TAC April 2007 (which is in March)
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meeting of
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
SPP-Entergy Market Power Analysis Presented By: David B. Patton, Ph.D. President, Potomac Economics June 20, 2008.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
SLED Electricity Modelling results – Serbia László Szabó, András Mezősi
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
1.206J/16.77J/ESD.215J Airline Schedule Planning
Presentation transcript:

February 2012 CMWG Constraints Competitiveness Tests (CCT)

2 Why do we need it? –To mitigate market power When do we need it? –Annual/ Monthly/ Daily? What do we need to identify? –Questions that CCT is trying to answer for each constraint How do we do it? –Is the current design working? ERCOT PublicFebruary 2012

3 CCT Philosophy Competitive Constraint Test tries to identify for each constraint 1.Can a market participant exercise Market Power by a)offering high to increase the price to resolve the constraint? b)offering low to drive another market participant out of the market when the constraint is binding/ violated?  Calculate Element Competitiveness Index (ECI) 2.Can the constraint be resolved without help from non-Base Load generation of a single Decision Making Entity?  Identify existence of Pivotal player ERCOT PublicFebruary 2012

4 ECI - Herfindahl-Hirschman Index (HHI) Definition: HHI = s 1 ^2 + s 2 ^2 + s 3 ^ s n ^2, where s i is the market share percentage of the i-th firm) Example 1: non-competitive market –Only 1 firm in the market –HHI = 100^2 = 10,000 –HHI value indicates the market is non-competitive Example 2: competitive market –10 firms with equal shares in the market –HHI = 10*10^2 = 1,000 –HHI value indicates the market is competitive Example 3: “very-good” competitive market –100 firms with equal shares in the market –HHI = 100*1^2 = 100 –HHI value indicates the market is “very-good” and competitive With existing experience at ERCOT, HHI of 2,000-3,000 is usually considered as boundary between competitive and non-competitive –HHI/ECI < 2000, a competitive market/constraint –HHI/ECI > 3000, a non-competitive market/constraint ERCOT PublicFebruary 2012

5 Example Explaining Issue with ECI of Current CCT Example –Import Terminal SF = -0.72, Export Terminal SF = 0.05 –100MW capacity w/ SF=-0.1, 500MW w/ SF=-0.05, 50000MW w/ SF=0 –50000MW equally belong to 50 DMEs Calculation based on current CCT design –100MW capacity w/ SF=-0.15, 500MW w/ SF=-0.1, 50000MW w/ SF=-0.05 (w.r.t. Export Terminal) –ECI SF Threshold is / 3 = –Total resolving Impact = 100 * * * 0.05 = = 2565 MW –ECI = (15/2565*100)^2 + (50/2565*100)^2 + 50*(50/2565*100)^2 = 194 (competitive) Calculation based on actual impact seen in power flow –Total resolving Impact = 100 * * * 0 = 35 MW –HHI of actual impact = (10/35*100)^2 + (25/35*100)^2 = 5918 (non- competitive) ERCOT PublicFebruary 2012

6 Constraint – Distributed Load Ref Bus ERCOT PublicFebruary 2012 Export Terminal (From Bus) Import Terminal (To Bus) Direction to be Evaluated Has negative shift factor w.r.t distributed load ref bus Can move up to help resolve the constraint Can increase cost to resolve the constraint if market share is high Export-Side Network Import-Side Network Has positive shift factor w.r.t distributed load ref bus Can move down to help resolve the constraint Can offer low to prevent from being moved down and get others moved down to resolve constraint

7 Distributed Loads Reference Bus ERCOT PublicFebruary 2012 Shows how the contribution of each generation MW capacity to line flow is proportional to its shift factor w.r.t distributed loads reference bus SFi and SFj are SFs w.r.t single reference bus. The final equation shows that line flows can be show as the generator MW times an effective SF. This SF is the SF w.r.t distributed loads reference. The effective impact of the loads calculated w.r.t distributed loads reference bus becomes zero

8 ECI Calculation Analysis ECI is equal to the sum of the square of the percentages of effective Managed Capacity by each Entity and its Affiliates where the effective Managed Capacity is determined by summing, over all the resources that are selected (have shift factors greater than one-third of the highest resource shift factor), the products (A) the Available Capacity for that Resource and (B) the shift factor of that Resource Should separate ECI be calculated to identify market power to increase cost and market power to drive others out of market market power to increase cost => ECI based on resources with Negative SF market power to drive others out of market => ECI based on resources with Positive SF OR should their be a single ECI to identify market power to resolve the constraint –ECI based on absolute SF ERCOT PublicFebruary 2012

9 Variables Wind capacity –Should full capacity of WGR be considered or use a percentage of full capacity (ex: 8.65% from SARA) –Should the lower % be used just for resources helping to resolve the constraint (Neg SF) and full capacity be used for resources causing the congestion (Pos SF) SF of resources being considered as having significant impact –Should it be greater than1/3 of highest SF or –Should it be same as SCED (greater than 2%) Constraint loading at system load –Should the constraint be considered as competitive if it will not be overloaded at the system level –Should the ECI be determined irrespective of the system load level. ERCOT PublicFebruary 2012

10 Pivotal Player Index (PPI) DME with biggest market share is identified based on non-base-load resource capacities Base-load resource capacities include –Full capacity of nuclear units –Min-gen capacity of coal and lignite units PPI is the sum of impacts from –All base-load –Non-base-load capacity, other than from the biggest DME, needed in addition to base-load to meet the system loads Pivotal player exists if –PPI > Limit ERCOT PublicFebruary 2012

11 PPI Calculation Analysis Should best case scenario be considered –Consider all resources, except those from largest entity, with negative SF are used to meet the system load Or should typical scenario be considered –Consider all resources, except those from largest entity, with significant SF, both positive and negative, are used to meet the system load Should all resources be considered when determining largest entity –Or should only non-base-load be considered Should all resources be used in determining largest entity –Or should resources with SF greater than1/3 SF be used 1/3 of highest non-base-load SF or 1/3 of highest SF ERCOT PublicFebruary 2012