Chapter 5 Patching and Edge Repair

Slides:



Advertisements
Similar presentations
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Advertisements

1 Cold planers Prestudy Jan 2009 / Jürgen Seemann.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Fog and Rejuvenating Seals.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Comal County Chip Sealing June 26, 2007.
2014 Chip Seal Training ODOT Specifications
Highway Engineering Pavement Types
Module 4-2 : Joint Sealing
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
Properties of Asphalt Important properties of asphalt include: Adhesion Consistency Specific Gravity Durability Rate of curing Ductility Aging and.
Conversion of Petroleum Contaminated Soil into Asphalt-Treated Road Base U.S. Army Corps of Engineers, Alaska District.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 6 Dowel Bar Retrofit.
The Future is Thin: Surface Mix Experience and Performance in the City of Ottawa Steve Goodman, M.Eng., P.Eng. Senior Pavement Engineer, City of Ottawa.
Pavement Design Terms and Concepts
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
Fog Seals, Sand Seals, Scrub Seals, and Rejuvenators.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Surface Rehabilitation Treatments
A mixture of asphalt emulsion, crushed aggregate, mineral filler, water and other additives properly proportioned, mixed and spread as a surface treatment.
HMA Construction Program
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
PCC Overlays of HMA Pavements
HMA Pavement Recycling and Reconstruction
Session 3-6 HMA Overlays.
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 4 Joint Resealing and Crack Sealing.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Isolated Partial Depth Concrete Repair.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Chapter 4 Crack Sealing, Crack Filling, and Joint Sealing From… Maintenance Technical Advisory Guide (MTAG)
Pavement Maintenance II
Pavement Distresses Flexible Pavement
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Analysis and Design
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
Micro-surfacing SRF Consulting Group, Inc. SemMaterials
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
MODULE 3-3 Patching With Bituminous Mixtures. Learning Objectives  Describe the conditions that require patching  Distinguish between hot-, cold-, and.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Surface Treatments #2.
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Russian Engineers Training March 2011
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Concrete Repair.
City of Abilene Pavement Condition Survey 2017 Results and Discussion
HIGHWAY MAINTENANCE Failures in flexible pavement.
Surface Preparation before laying Hot Mix
Pavement condition index calculation
20th National Trails Symposium
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
Pavement Preservation
Surface Treatments #2.
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Presentation transcript:

Chapter 5 Patching and Edge Repair From… Maintenance Technical Advisory Guide (MTAG) Delete Caltrans logo. Use same slide for end of discussion. Include module 1 etc.

From… Maintenance Technical Advisory Guide (MTAG) Manager’s Overview From… Maintenance Technical Advisory Guide (MTAG) The intent of the Manager’s Overview is to give a basic understanding of each application or process available. This overview should be 5-8 minutes maximum. ANYTHING IN RED NEEDS TO BE CHANGED TO FIT THE SURFACE TREATMENT THAT YOU ARE WORKING ON. Slides with “Permanent” will be the same for all presentations and should not be changed.

Introduction to Patching and Edge Repair What is patching and edge repair ? Why use patching and edge repair ? When to use patching and edge repair ? Where to use patching and edge repair ? May want to include Module numbers for each section.

What is Patching? Patching consist of removing and replacing the material in a highly distressed area, or adding additional material to cover up the distressed area

Why Use Patching? Restores the pavement surface to a state where other preservation treatments can be used with a good chance of success Often done in preparation for other forms of corrective maintenance, pavement preservation, or pre-treatment prior to an overlay

When to use? Site Selection Guidelines Patching is not pavement preservation. It may be used prior to pavement preservation treatments in isolated areas What criteria are used by Caltrans to determine when and where to patch?-need to include Patching is generally reactive-after some distress has been noted

Where to use? Localized areas where even the underlying support materials have disintegrated, contaminated, or lost their load-carrying capacity Pavement failure along the edges due to traffic and loss of edge support

High Severity Block Cracking High Severity Alligator Cracking Where to use! High Severity Alligator Cracking

Mechanisms for Pothole Formation Raveling, stripping, or cracking in the pavement surface. Softening of the underlying pavement layers due to water penetration increasing deflections.

Mechanisms for Pothole Formation Ice formation and heaving Lost of fines from the underlying pavement layers are lost. Once a hole is formed, it will continue to grow until it is repaired.

Patching and Edge Repair Course Training Modules Available Design, Materials & Specifications Construction & Inspection

Summary Patching is a treatment applied prior to other preservation treatments Patching by itself is not a preservation treatment Patching is a reactive treatment, not a proactive treatment

End Overview Begin Project Design, Materials & Specifications This has to be a separate title slide. Use template from slide. Request to change color red to something else. Request to have a closing slide (i.e., thanks any questions, etc.)

Design, Materials & Specifications Module 5-1 Design, Materials & Specifications From… Maintenance Technical Advisory Guide (MTAG) Delete Caltrans logo. Use same slide for end of discussion. Include module 1 etc.

Topics to be Covered Project Selection Design Considerations Distress and Other Application Considerations Cost and Performance Design Considerations Mobilization Typical Materials Items Quantity Calculations Production Rates Materials and Specifications (including SSP’s) Summary Request to include cost as another item. Possibly include cost in Project Cost. Keep in mind cost changing. Possibly adding date to this information. What is the normal cost, night cost, and etc. Need to get cost from local agencies (MTC). Re-number training Modules. This should be a treatment module 2. Delete first two lines. Training Module 1: Design, Materials & Specifications - Technical Training

Project Selection Distress and Application Considerations Performance

Factors to Consider When Choosing a Maintenance Treatment Will the treatment address the distresses present? (i.e., Will it work?) Can the required preparation for the treatment be carried out? Is the treatment affordable and cost effective? Will the treatment be performed before the situation being addressed changes?

Three Basic Steps In The Selection Process Assess the existing conditions. Determine the feasible treatment options. Analyze and compare the feasible options with each other.

Initial Site Assessment – Distress Identification Types of Distresses and Definitions Definitions from Caltrans pavement Distress manual (include reference) What distresses are usually patched? Potholes Localized base failure others

DISTRESS AND APPLICATION CONSIDERATIONS Patching is a viable application for treating localized highly distressed areas Based on the type of distress and the severity level on of the following types of patching method shall be used to restore the pavement surface Types of Patching Methods: Pothole patching Material dig out and replacement Edge repair Surface reinstatement

Other Selection Considerations Traffic level Time of the year during which the repair is carried out Time until scheduled rehabilitation Availability of equipment and personnel

Cost and Performance Main costs associated with patching include: Labor Materials Equipment Traffic Delays Cost effectiveness is determined by the patch survival rate

Design Considerations Mobilization Typical Materials Items Quantity Calculations Production Rates

Mobilization Depends on patching material to be used. HMA – Requires an Asphalt Paving plant close to construction site. Special Permitting - None

Typical Materials Items Hot-Mix Asphalt Cold-Mix Asphalt (temporary fix) Aggregate / asphalt emulsion (injection patching) Asphalt emulsions Granular aggregate base

Quantity Calculations Σ length x width Production Rates Production Rate Type of patching method Quantity of patches Need to verify fog line. One or two words.

Material Specifications Based on procedures of application and the use of appropriate materials Generally HMA materials are specified based on Caltrans Dense-Graded Asphalt Concrete (DGAC) specifications as presented in Standard Specifications Section 39 Cold-mixes for patching. These are generally proprietary products and should be handled according to the manufacturer’s specifications

End Project Design, Materials & Specifications Begin Construction Inspection This has to be a separate title slide. Use template from slide. Request to change color red to something else. Request to have a closing slide (i.e., thanks any questions, etc.)

Construction & Inspection Module 5-2 Construction & Inspection From… Maintenance Technical Advisory Guide (MTAG) Delete Caltrans logo. Use same slide for end of discussion. Include module 1 etc.

Topics to be covered Understand/Review Specifications Safety and Traffic Control SWPPP Sampling and Testing Type of Patching Methods Patching Throw and Roll Semi-permanent patches Injection patches Dig Outs Edge Repairs Surface Reinstatement HMA application Emulsion seal coat Cold mix Application Problems and Solutions Training Module 2 : Construction and Inspection - Technical Training

Understand/Review Specifications Review Construction Manual Chapter 4 Section 94 emulsion (emulsion membrane) Section 39 Asphalt Concrete (mix and placement) Review RE file notes Project special provisions Header corrections throughout rest of document.

Safety and Traffic Control Traffic control is required both for the safety of the traveling public and the personnel performing the work. It is also used to ensure the new surface is compacted and allowed to cool to below 70°C (158°F) prior to reopening the surface to traffic. Traffic control includes placing construction signs, construction cones and/or barricades, flag personnel, and pilot cars required to direct traffic clear of the maintenance operation.

SWPPP Review the storm water requirements for the project. Any questions should be directed to the construction storm water coordinator.

Sampling and Testing Required California Test 125 July 2002 METHODS FOR SAMPLING HIGHWAY MATERIALS AND PRODUCTS USED IN THE ROADWAY STRUCTURAL SECTIONS ASPHALT CONCRETE Aggregates . . Part 1, Sections 1-2 Asphalt . . . . . Part 6, Sections 1-3 BITUMINOUS SEAL Asphalt Emulsion . Part 6, Section 4 Two slides 1) Sampling 2) Testing May want to include reference to Caltrans SSP

Types of Patching Methods Throw and Roll Semi-permanent patches Injection patches Dig Outs Edge Repairs Surface Reinstatement HMA application Emulsion seal coat Cold mix

Patching Throw and Roll used for temporary patches most inexpensive and least labor-intensive method Steps: Placed patching material into the hole, with or without cleaning and/or drying of the hole. Compact material using the maintenance truck tires. The finished patch should have 1/8 to ¼ in (3 to 6 mm) of crown to help avoid water ponding. Clean up is generally not required.

Patching Semi-Permanent Patches effective patching method (second only to complete removal and replacement of the failed area) Steps: Mark the boundaries of the distressed area. Cut the boundaries of the patch square. Square up the sides of the hole until the edges of the hole are sound pavement. Remove water and debris from the hole. Apply a tack coat of asphalt emulsion to the sides and bottom of the hole (rate: 0.2 gal/yd2)

Patching Semi-Permanent Patches Place the patch material in the hole. Steps: Place the patch material in the hole. Compact the patch material with a hand device or a small vibratory roller. The finished patch should have a 0.1 to 0.2 in (3 to 6 mm) crown Seam the patch area with a crack sealant and fog seal.

Patching Injection patching rapid and effective method of patching requires specialized equipment not currently used by Caltrans used for lower trafficked roads alternative to the throw and roll method Steps: Blow debris and water from the hole Spray a tack coat of emulsion on the sides and bottom of the hole (rate: 0.2 gal/yd2) Fill the hole to the top with asphalt/aggregate mixture Apply of a finish coat of dry aggregate to minimize pick up

Dig Outs Required when edge of the pavement has broken away or the base has failed due to severe alligator cracking Permanent patches most expensive and labor-intensive method Steps: Mark the boundaries of the distressed area to be replaced. Cut out the perimeter of the area with a diamond saw or cold milling machine. Break up and remove the failed pavement to the subgrade material. Clean and dry the dig out area.

Dig Outs Steps: Place and compact new (virgin) base course material. Apply a tack coat of emulsion to the sides of the repair area (rate: 0.2 gal/yd2). Place the patch material in the prepared dig out area. The thickness of any lift should not exceed 4 in. Compact each lift using equipment similar to that typically used in hot-mix asphalt compaction operations. The finished patched area should have a crown of 1/8 to ¼ in.

Edge Repairs Intent: provide improved lateral support along the pavement’s edge. If the distress is confined mainly to the HMA surface, then regular patching operation should be employed. If the deterioration extends well below the surface, then a dig out is more appropriate. Achieving adequate compaction and maintaining good drainage at the interface with the shoulder

Surface Reinstatement Method A – HMA Application Steps: Clean the area to be patched of debris. Apply a diluted tack coat emulsion (rate: 0.1 gal/yd2) Lay the HMA over the surface and spread. The HMA should be spread to a minimum of twice the thickness of the largest aggregate size.  Compact the HMA using a pneumatic tired roller and possibly a steel wheel finish roller.

Surface Reinstatement Method B – Emulsion Seal Tack Coat Steps: Clean the area to be patched of debris. Apply a diluted tack coat emulsion (rate: 0.2 gal/yd2) Lay a layer of sand or fine aggregate, typically 0.1 to 0.2 in (3 to 5 mm) in depth.  Roll the patched area with a pneumatic tired roller.

Surface Reinstatement Method C – Cold Mix Steps: Clean the area to be patched of debris. Apply a diluted tack coat emulsion (rate: 0.1 gal/yd2) Spread mix over area to be repaired to a depth of 1 in. Compact mix using a pneumatic tire roller (or haul trucks) and finish with a steel wheel roller. Follow up before winter with a fog seal.

Application Problems and Solutions Patching Material Picks Out Ensure the hole is cleaned properly and not too wet. Ensure sufficient tack coat is applied. Use a self-setting cold-mix when holes cannot be dried properly. Ensure the patch is solid before trafficking. Dust patch surface with sand or small aggregate. Wait for better weather. Do not use cutback based cold-mix (unless a temporary repair is being done). For HMA patches, allow to cool before traffic is allowed over the patch. Ensure required compaction is achieved. Flush Surface Reduce asphalt or emulsion content in the mix. Reduce tack coat application. Allow longer time before trafficking. Ensure the gradation of the aggregate is appropriate.

Application Problems and Solutions Uneven Surface Ensure cold-mix is workable. Ensure HMA is at the right temperature for placement and compaction. Ensure adequate compaction is achieved. Loss of Cover Rock in Seal Coat Patches Ensure surface is clean. Ensure correct emulsion content is sprayed. Ensure aggregate is spread while the emulsion is still brown. Ensure emulsion is broken before traffic is allowed. Allow longer cure time before traffic. Traffic Compacts Mix to Below Edge of Hole Ensure finished hole is overfilled 0.1 to 0.2 in (3 to 6 mm). Ensure mix is workable at application temperatures. Allow longer time before trafficking.