MEGAPROJECT Case Study Basic Project Information Case compiled by: Roland Gareis and Claudia Weninger Contact details: and

Slides:



Advertisements
Similar presentations
Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions.
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
N.Vakalis, MEP, ITRE “Greek experiences in using Structural funds for regional development” Conference "Research and Innovation - an Opportunity for Convergence.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Chapter 3 Project Initiation
MEGAPROJECT Stakeholder Analysis Starting Point: How to Conduct this Analysis and Common Understandings SECTION 5 - PROJECT ENVIRONMENT 1.For this specific.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
MEGAPROJECT Case Study Basic Project Information Case compiled by: Dr. Athena Romboutsos Contact details: Project TitleAthens Ring Road.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
European Union | European Regional Development Fund Zooming in Interreg Europe Nicolas Singer | Senior Project Officer Interreg Europe Secretariat 24 April.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Smart Service Delivery in Challenging Times Shared services – what does it mean for you? Alan Higgins Chair, CIEH Council Director, Environmental Health.
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU 9 TH P UBLIC P ROCUREMENT K NOWLEDGE E XCHANGE P LATFORM,
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Slide 1 WP D Integrating Mobility Management and Land Use Planning How can Mobility Management be included in the planning and building permission process.
Resource Efficiency Opportunities in the Building Sector
THE ROLE OF CIVIL SOCIETY IN WELFARE MIX MODEL CREATION Best Practice Model Social Center "Home of colors"
MEGAPROJECT Case Study Basic Project Information Case compiled by: Milen Baltov Contact details: Project Title Design and Development of.
MEGAPROJECT Case Study Case compiled by: Agnieszka Łukasiewicz Contact details: tel
Supporting Tourism Investment in the Pacific Islands: IFC’s Sector-based Approach to Overcoming Investment Climate Barriers Trinnex Meeting 30 August 2010.
GPP in practice: Vienna EcoBuy programme Eva Persy, City of Vienna, Environmental Department Tallinn GPP Seminar, May 2013.
Hinkley Point Nuclear Power Point.
BŁAŻEJ MODER PRESIDENT LODZ REGIONAL DEVELOPMENT AGENCY LODZ, OCTOBER 8, 2008 THE EU SUPPORT FOR REGIONAL DEVELOPMENT.
Business Model for an Industrial development agency
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
Info Day: “2015 European Capital of Culture” Detailed insight.
TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström Contact.
Towards a policy paper for Italy: Voluntary tools in the implementation of the European low carbon strategy in Italy: the Covenant of Mayors and other.
ESPON 2020 Cooperation Programme EU Stakeholder consultation 27 March 2013 ESPON renewal, refocus and upgrade: Mission, Priority Axes, Specific Objectives,
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
Commissioning Self Analysis and Planning Exercise activity sheets.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Ukraine energy policy outlook Ildar GAZIZULLIN International Centre for Policy Studies May 25, 2012, KSE Alumni congress.
Kick-off Meeting Belgrade, 4-5 December 2008 Network of Centres for Project Development and Management.
MAP-IT! Review Meeting 5 March Brussels Intermediate results Jordan INNOVA.
EU Structural Funds Presentation to Chief Executives 9 May 2006 Hillgrove Hotel Monaghan.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
Regulations of Geothermal HP systems at local and regional level in Europe Contract nº: IEE/11/041 01/05/2012 to 30/04/2015updated: March 2014.
MEGAPROJECT Case Study Basic Project Information Case compiled by: Milen Baltov, Kostadin Kostadinov Contact details: Project Title Design.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
A project implemented by the HTSPE consortium This project is funded by the European Union SECURITY AND CITIZENSHIP RIGHT AND CITIZENSHIP
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
Hessian Ministry of Economics, Transport, Urban and Regional Development Different approaches of the State of Hessen to adapt labour and qualification.
Training for Rebuilding Europe Retrofitting buildings, training and improved skills, and financing energy efficiency in buildings. 10 December 2010 – 10.
REGIONAL POLICY EUROPEAN COMMISSION The contribution of EU Regional/Cohesion programmes Corinne Hermant-de Callataÿ European Commission,
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
A project implemented by the HTSPE consortium This project is funded by the European Union SMART AND INCLUSIVE GROWTH CUSTOMS
33 3. IS Planning Issues Scope of IS planning Barriers in IS planning Overview of IS planning Inputs to IS planning Process of IS planning Outputs from.
EU-China: : Demonstrating Smart Cities achievements Dr Shaun Topham EU eForum.
CITYnvest Increasing Capacities in Cities for Innovative Financing in Energy Efficiency Agnieszka Pietruczuk CITYnvest project officer CEMR.
Reporting on the main discussion points Rapporteur Mr Jan Maarten de Vet, Ecorys High Level Tripartite Strategic Forum on construction 14th April 2016.
Turin Final Conference 25 September 2014 Work Group 1 Cordelia Koenig Ministry of Urban Development and Environment Hamburg Turin Final Conference 25 September.
State aid for broadband Internet development in Lithuania TAIEX Multi-beneficiary Workshop on TAIEX Assistance within Chapter 10 – Information society.
Environment Premium environmental management EU Eco-Management and Audit Scheme.
CENTRAL EUROPE PROGRAMME WORKSHOP A: Preparing an application – focus on activities and partnership Project development seminar Prague, 1-2 February.
ISO/IEC
TERRITORIAL COOPERATION PROGRAMMES FOR EUSDR - PA 8
Projects under DTP Thematic Pole 2 TP2 (Framework Support for RDI)
GPP Training Toolkit An Introduction European Commission
MEGAPROJECT Case Study
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Presentation transcript:

MEGAPROJECT Case Study Basic Project Information Case compiled by: Roland Gareis and Claudia Weninger Contact details: and Project Title Vienna Hospital North Location Vienna, Austria Purpose Establishment of a new central hospital in Vienna Scope Planning and establishing the hospital including the buildings, the organisation, the services, the processes, the ICT infrastructure, etc. Contractual Framework Vienna Hospital Association establishes the new hospital. Funding by the Vienna Hospital Association, municipality of Vienna and the EU Relevant Physical Dimensions Plot size: m² Building area: m² Gross floor area: m² Healing Garden (Park): m² Building height/top edge height of the attic of the nursing wing: 38,10 m Bed capacity: rd. 800 Construction costs: about 850 million € SECTION 1 - BASIC PROJECT INFORMATION

MEGAPROJECT Stakeholder Identification (Internal) SECTION 2 - PROJECT STAKEHOLDERS Stakeholder Category Case-StudyComments (e.g. maturity, previous experiences of stakeholders, skills, influence on project) Supply-SideClient/InvestorVienna Hospital Association FinanciersVienna Hospital Association (3), municipality of Vienna, EU Sponsors- Client’s CustomersPatients (and their families) Client’s Owners- Other internal supply-side categories ( please specify) CategoryCase-Study UsersFuture employees Demand SidePrincipal Contractors Construction companies Architects, planners Consultants First Tier Contractors nA Will cooperation in different service areas nA Professional Services Providers nA Other internal supply-side categories ( please specify)

MEGAPROJECT Stakeholder Identification (External) SECTION 2 - PROJECT STAKEHOLDERS Stakeholder CategoryCase-StudyComments (e.g. maturity, previous experiences of stakeholders, skills, influence on project) Public Regulatory Agencies Licensing authority, municipality of Vienna MA 15, MA 40, MA 37 etc.High inspection effort Local Government Municipality of Vienna National Government Austria governnment Other internal supply- side categories ( please specify) CategoryCase-studyGet new services or are closed Other hospitalsSemmelweis, Gersthof, Hietzing, Otto-Wagner, Floridsdorf Privat e Local residents Inhabitants of the 21 district of Vienna Local Landowners - Environmentalists None apparent - offshore Conservationists None apparent – offshore Archaeologists n/a Other External Private stakeholders (please specify) CategoryCasestudy Social orgnizationRed noses

SECTION 2 -PROJECT STAKEHOLDERS MEGAPROJECT Stakeholder Relationship Maps Key: - Project Actor - Project Relationship Name of Actor Description of relationship VHA VHA… Vienna Hospital Association PORRVAMEDOther Munici- pality of Vienna Austrian Railway Operator Vienna Public Transport Vienna Danube Hospital Hospital Semmel- weis Hospital Hietzing Hospital Otto- Wagner Hospital Gersthof Hospital Florids- dorf EU Architect Con- sultants Other license agencies (AGES) Future em- ployees Diff. religion assoc. Social Assoc. Owns 100% Contracts With … Contracts investments.. Gives financial support Integrated in planning Sub- contract or Contracts With … Gives licenses to..

SECTION 2 - PROJECT STAKEHOLDERS MEGAPROJECT External Stakeholder Attitude Analysis External StakeholderExternal Stakeholder’s Attitude to this Project External Stakeholder’s Influence on project Impact of Project on External Stakeholder

MEGAPROJECT Project Management Project Organisation Client Project Team Size & Structure Project Team of the Vienna Hospital Association: about 20 people Architects, planners and consultants Construction companies Contractor Project Team Size and Structure Sub-Contractor Project Team Involvement Project Tools and Techniques Please √ if present, x if absent, leave blank if unknown Life-Cycle Costing Approaches □ Stakeholder Involvement □ Building Information Modelling (BIM) □ Project Management Software □ Relationship Management Tools □ Project Knowledge Management Tools □ Lessons Learnt Transfers □ Team Building Tools □ Competency framework □ Other Tools and Techniques or More Information SECTION 3 - PROJECT MANAGEMENT √ √

Risk Management Processes 29 Present (describe below) □ Not Present □ No Information x HR Management ProcessesPresent (describe below) □Not Present □ No Information X Procurement Management Processes Present (describe below) □Not Present □ No Information □ Green Procurement 5 Integration Management Processes Present (describe below) □Not Present □ No Information X Scope Management ProcessesPresent (describe below) □Not Present □ No Information X Time Management ProcessesPresent (describe below) □Not Present □ No Information X Cost Management ProcessesPresent (describe below) □Not Present □ No Information X Quality management ProcessesPresent (describe below) □Not Present □ No Information X Communications Management Processes Present (describe below) □Not Present □ No Information X Project Processes SECTION 3 - PROJECT MANAGEMENT

MEGAPROJECT Project Performance Aspects of Performance Concerned with Doing the Project Right Original Targets and changes to targetsActual Achievements Against Targets Performance relating to time The project started in The hospital will start operations in No delay Performance relating to cost Ok- Performance related to specification -- SECTION 4 - PROJECT PERFORMANCE StakeholderOriginal Aims of Project Involvement and Changes to these AimsAchievement of these Aims Municipality of Vienna OkStronger involvement in project team Vienna Hospital Association ok Aspects of Performance Concerned with Doing the Right Project

MEGAPROJECT Project Environment Legal and Regulatory Environment Legal and Regulatory Project Environment (regionally, nationally and Europe wide) The Vienna Hospital Association is responsible for all public hospitals in Vienna. It is a public organisation and strongly connected to the municipality of Vienna. The VHA invests 2 million € per year in Viennese hospitals. The organisation is also responsible for medicine and administrative staff but also for patients. The VHA is very interested in sustainable development and developed the sustainability charta for the hospital north. The hospital north is party founded by the European investment bank. Thus the project has to consider sustainable development parts e.g. co² emission. Specific Legal and Regulatory events impacting on the project The sustainability charta was developed from the VHA in cooperation with the municipality of Vienna. In Vienna different regulations e.g. green procurement exist. The projects needs to consider all local regulations. The VHA reports to the municipality of Vienna. SECTION 5 - PROJECT ENVIRONMENT Economic Project Environment - Specific Economic Events impacting on the project None identified Political Project Environment As the hospital north is a public hospital all political parties are very interested in the project. Specific Political Events impacting on the project None Identified Economic Environment Political Environment

MEGAPROJECT Project Key Events and Activities Timeline SECTION 6 - PROJECT TIMELINE TIME Start conceptualizing EVENTS IN THE PROJECT EVENTS IN THE ENVIRONMENT Conceptualizing & Planning Implementation Commission Part 1 Rough planning finished Architectural competition finished Implementation started Detailed planning finished Info centre on site established Sustainability charta developed Green Public Procurement award winner Site preparation Contract (ground) signed Participation workshops performed Financial agreement between VHA and european investment bank

1.Vienna Hospital Association – Hospital North: 2.Sustainablity Charta: 3.Vienna Hospital Association 4.Red-noses organization 5.GPP case study