SPC – Attribute Control Charts

Slides:



Advertisements
Similar presentations
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Advertisements

Quality and Operations Management Process Control and Capability Analysis.
Quality Assurance (Quality Control)
Statistical Process Control
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
Chapter 6 - Part 1 Introduction to SPC.
CD-ROM Chap 17-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition CD-ROM Chapter 17 Introduction.
Chapter 18 Introduction to Quality
Chapter 10 Quality Control McGraw-Hill/Irwin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
originally developed by Walter A. Shewhart
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
Statistical Process Control (SPC)
10 Quality Control CHAPTER
Statistical Process Control
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Statistical Quality Control
Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6.
8/4/2015IENG 486: Statistical Quality & Process Control 1 IENG Lecture 16 P, NP, C, & U Control Charts (Attributes Charts)
X-bar and R Control Charts
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Chapter 10 Quality Control McGraw-Hill/Irwin
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Welcome to MM305 Unit 8 Seminar Prof Greg Statistical Quality Control.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 17-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Control Charts for Attributes
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Chapter 10 Quality Control.
Statistical Process Control (SPC)
Control Charts.
Operations Management
Chapter 7 Statistical Quality Control. Quality Control Approaches l Statistical process control (SPC) Monitors the production process to prevent poor.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
The Certified Quality Engineer Handbook Examples from Ch
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Statistical Quality Control
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
MGS8020 Measure.ppt/Mar 26, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Measure Mar 26, 2015.
Statistical Process Control Production and Process Management.
Quality Control  Statistical Process Control (SPC)
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Yandell – Econ 216 Chapter 17 Statistical Applications in Quality Management Chap 17-1.
Statistical Process Control (SPC)
Statistical Process Control
Chapter 6 Revised Homework Problems 6, 8, 10, 21.
Presentation transcript:

SPC – Attribute Control Charts Chapter 6 - Part 2 SPC – Attribute Control Charts

Types of Control Charts Attribute charts Monitor fraction of defective units Monitor number of defects Difference between “defective unit” and a “defect?” A defective unit is a unit that is either defective. A defect is flaw on a given unit of a product. A unit can have many defects. A defective unit may be defined as, for example, a unit that has 3 or more defects.

Types of Control Charts Variables charts Monitors continuous quality characteristics. Continuous values (variables data) can theoretically assume an infinite number of values in some interval. Time Weight Ounces Diameter

Types of Control Control Chart Monitors Attribute control charts p chart Process fraction defective c chart number of defects u chart defects per unit Variables control charts X-bar chart Process mean R chart (Range Chart) Process variability

Use of p-Charts When observations can be placed into two categories. Good or bad Pass or fail Operate or doesn’t operate

p-chart A company that makes light bulbs wants to monitor the fraction of defective bulbs. The company decides to select a random sample of 100 bulbs in each day over a 5 day period Each of the 100 bulbs are tested to determine if they light up.

p-chart If a bulb does not light up, the bulb is defective. The company wants to Estimate the percentage of defective bulbs and Determine if the percentage of defective bulbs is increasing over time. A p chart is the appropriate tool for providing the company with this information.

Notation Sample size = n = 100 Number of samples (subgroups) = k = 5 X = number of defective bulbs in a sample p = sample fraction defective = ??? p-bar = estimated process fraction defective P = process fraction defective (unknown) p-bar is an estimate of P

Inspection Results

Compute p and p-bar

p-bar (Estimated Process Fraction Defective)

p-Chart Control Limits

p-Chart - Control Limits

Interpretation The estimated fraction of defective bulbs produced is .23. On Day 2, p was below the LCL. This means that a special cause occurred on that day to cause the process to go out of control. The special cause shifted the process fraction defective downward. This special cause was therefore favorable and should be ???

Interpretation After Day 2, the special cause lost its impact because on Day 4, the process appears to be back in control and at old fraction defective of .23. Until the special cause is identified and made part of the process, the process will be unstable and unpredictable. It is therefore impossible to obtain a statistical valid estimate of the process fraction defective because it can change from day to day.

Trend Within Control Limits Process fractions defective is shifting (trending) upward P = process fraction defective P P Sampling Distribution P P UCL LCL p-Chart

Applications Think of an application of a p-chart in: Sales Shipping department Law

Use of c-Charts When we are interested in monitoring number of defects on a given unit of product or service. Scratches, chips, dents on an airplane wing Errors on an invoice Pot holes on a 5-mile section of highway Complaints received per day Opportunity for a defect must be infinite. Probability of a defect on any one location or any one point in time must be small.

c-Chart c-chart notation: c = number of defects k = number of samples

c-Chart A car company wants to monitor the number of paint defects on a certain new model of one of its cars. Each day one car in inspected. The results after 5 days are shown on the next slide.

c-Chart

c-Chart - Mean

c-Chart – Control Limits

c-Chart – Control Limits

Conclusion Process shows upward trend. Even though trend is within the control limits, the process is out of control. Mean is shifting upward This is due to an unfavorable special cause. Must identify special cause and eliminate it from process. Who is responsible for finding and eliminating special cause?

Mini Case Think of an application of a c-chart bank.

u-Chart With a c chart, the sample size is one unit. A u-chart is like a c-chart, except that the sample size is greater than one unit. As a result, a u-chart tracks the number of defects per unit. A c-chart monitors the number of defects on one unit.

u-Chart A car company monitors the number of paint defects per car by taking a sample of 5 cars each day over the next 6 days. The results are shown on next side.

u-Chart

u-Chart

u-Chart

u-Chart

u-Chart

Conclusion The process appears stable. We can therefore get a statistically valid estimate the process mean number of defects per car. Our estimate of the mean number of paint defects per car is 10.5, the center line on the control chart. Thus, we expect each car to have, on average, 10.5 paint defects.

Conclusion Although the process is stable, the number of defects per car is too high. Deming calls this a stable process for the production of defective product. Important take away: A stable process (process in control) is not necessarily a good process because it can be in control at the wrong level. A stable process is predictable, but this doesn’t mean that what is being predicted is favorable.

Mini Case Who is responsible for improving this process? What is required to improve the process?

u-Chart vs. c-Chart If n = 1, u = c and Control limits of the two chart will therefore be the same.

Sample Size Control Chart When To Use Sample Size p-Chart Monitor the proportion of defectives in a process At least 50 c-Chart Monitor the number of defects 1 u-chart Monitor the number of defects per unit >1

In Practice You need 25 to 30 samples before computing initial control limits. When a special cause occurs, you should eliminate that sample and re-compute control limits if Special cause is identified Eliminated or made part of process To identify special causes, workers must keep log sheet, where they record any changes they make to the process.

Tracking Improvements UCL LCL Process not centered and not stable Process centered and stable Additional improvements made to the process