Chapter 18 Multinational Capital Budgeting 1. Extension of the domestic capital budgeting analysis to evaluate a Greenfield foreign project Distinctions.

Slides:



Advertisements
Similar presentations
1 CAPITAL BUDGETING ISSUES IN FAST- GROWING ECONOMIES.
Advertisements

Chapter 10 Project Cash Flows and Risk
Multinational Capital Budgeting
Multinational Capital Budgeting 14 Chapter South-Western/Thomson Learning © 2006 Slides by Yee-Tien (Ted) Fu.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Copyright © 2003 Pearson Education, Inc.Slide 16-1 Prepared by Shafiq Jadallah To Accompany Fundamentals of Multinational Finance Michael H. Moffett, Arthur.
International Finance FIN456 ♦ Spring 2013 Michael Dimond.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
1 FINANCE 7311 CAPITAL BUDETING. 2 Outline 4 Projects 4 Investment Criteria 4 NPV v. IRR 4 Sources of NPV 4 Project Cash Flow Checklist.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
1 (of 30) IBUS 302: International Finance Topic 20-International Capital Budgeting II Lawrence Schrenk, Instructor.
Multinational Capital Budgeting
Multinational Capital Budgeting
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Copyright © 2011 Pearson Prentice Hall. All rights reserved. Chapter 11 Cash Flows and Other Topics in Capital Budgeting.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
International Capital Budgeting Chapter 18
1 (of 30) IBUS 302: International Finance Topic 16-International Capital Budgeting Lawrence Schrenk, Instructor.
18-1  International Capital Budgeting (Eun and Resnick chapter 18)
Chapter Outline Foreign Exchange Markets and Exchange Rates
FIN ©2001 M. P. NarayananUniversity of Michigan Valuation methods An overview.
Copyright (C) 2000 by Harcourt, Inc. All rights reserved.
Chapter 10. Cash Flows and Other Topics in Capital Budgeting.
Multinational Financial Management Alan Shapiro 9 th Edition J.Wiley & Sons Power Points by Joseph F. Greco, Ph.D. California State University, Fullerton.
Chapter 9 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Chapter Outline Review of Domestic Capital Budgeting
Financing International Projects. Capital Budgeting Capital budgeting requires estimation of a project’s incremental cash flows - which are determined.
Capital Budgeting Chapter 13. Capital Budgeting uThe process of planning investments in assets whose cash flows are expected to extend beyond one year.
Multinational Capital Budgeting and Cross-Border Acquisitions
Investment Analysis Lecture: 7 Course Code: MBF702.
BU Finance & Investment Club Joseph McNiff & Xun Yao Chen Spring 2013 Introduction to Valuation.
Multinational Capital Budgeting 14 Chapter South-Western/Thomson Learning © 2003.
INTERNATIONAL FINANCIAL MANAGEMENT EUN / RESNICK Fifth Edition Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
FINC3240 International Finance
International Finance FIN456 ♦ Spring 2013 Michael Dimond.
1 Chapter 2: Project Cash Flows The definition, identification, and measurement of cash flows relevant to project evaluation.
Multinational Capital Budgeting
Financing and Valuation
Forecasting and Valuation of Free Cash Flows Arzac, Chapter 2.
VALUATION AND FINANCING
Multinational Capital Budgeting 7 7 Chapter. Chapter Objectives To compare the capital budgeting analysis of an MNC’s subsidiary with that of its parent;
Chapter 20 Principles PrinciplesofCorporateFinance Ninth Edition Financing and Valuation Slides by Matthew Will Copyright © 2008 by The McGraw-Hill Companies,
10/23/2015Multinational Corporate Finance Prof. R.A. Michelfelder 1 Outline 7 7. Measuring and Managing Economic Exposure 7.1Value of the MC 7.2 Types.
CHAPTER TEN Capital Budgeting: Basic Framework J.D. Han.
Multinational Capital Budgeting
© 2011, 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses Chapter 9 Capital Expenditure Decisions Maher, Stickney and Weil.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
Chapter 18 Multinational Capital Budgeting. Copyright © 2004 Pearson Addison-Wesley. All rights reserved Multinational Capital Budgeting Although.
0 1. Identify the SIZE and TIMING of all relevant cash flows on a time line. 2.Identify the RISKINESS of the cash flows to determine the appropriate discount.
Kirt C. Butler, Multinational Finance, South-Western College Publishing, 3e 15-1 Chapter 15 Cross-Border Capital Budgeting 15.1The Algebra of Cross-Border.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
INTERNATIONAL FINANCIAL MANAGEMENT EUN / RESNICK Second Edition 17 Chapter Seventeen International Capital Budgeting Chapter Objective: This chapter discusses.
FIN 614: Financial Management Larry Schrenk, Instructor.
Multinational Capital Budgeting 15 Lecture Chapter Objectives To compare the capital budgeting analysis of an MNC’s subsidiary with that of its.
Lecture 12. Lecture Review Capital Budgeting Subsidiary versus Parent Perspective Remitting Subsidiary Earnings to the Parent Input for Multinational.
Multinational Capital Budgeting Multinational Business Finance
International Capital Budgeting
International Bond Market
Financing and Valuation
Ch. 9: Making Capital Investment Decisions
Measuring Exposure To Exchange Rate Fluctuations
Evaluating International Investment Projects
Multinational Capital Budgeting
Capital Budgeting in Foreign Subsidiaries
Multinational Capital Budgeting
Exchange Rate Fluctuations
FIN 440: International Finance
International Finance
Presentation transcript:

Chapter 18 Multinational Capital Budgeting 1

Extension of the domestic capital budgeting analysis to evaluate a Greenfield foreign project Distinctions between the project viewpoint & the parent viewpoint when analyzing a potential foreign investment Adjusting the capital budgeting analysis of a foreign project for risk Introduction of the use of real option analysis as a complement to DCF analysis in the evaluation of potential international investments 2

Multinational Capital Budgeting Like domestic capital budgeting, this focuses on the cash inflows and outflows associated with prospective long-term investment projects Capital budgeting follows same framework as domestic budgeting – Identify initial capital invested or put at risk – Estimate cash inflows, including the terminal value or salvage value of the investment – Identify appropriate discount rate for NPV calculation – Determine the NPV and IRR 3

Complexities of Budgeting for a Foreign Project Several factors make budgeting for a foreign project more complex – Parent cash flows must be distinguished from project – Parent cash flows often depend on the form of financing, thus cannot clearly separate cash flows from financing – this changes the meaning of NPV – Additional cash flows from new investment may in part or in whole take away from another subsidiary; thus as a stand alone a project may provide cash flows but overall may add no value to the entire organization – Parent must recognize remittances from foreign investment because of differing tax systems, legal and political constraints 4

Complexities of Budgeting for a Foreign Project Non-financial payments can generate cash flows to parent in the form of licensing fees, royalty payments, etc. – relevant for parent’s perspective Managers must anticipate differing rates of national inflation which can affect cash flows Use of segmented national capital markets may create opportunity for financial gains or additional costs Use of host government subsidies complicates capital structure and parent’s ability to determine appropriate WACC Managers must evaluate political risk Terminal value is more difficult to estimate because potential purchasers have widely divergent views 5

Project versus Parent Valuation Most firms evaluate foreign projects from both parent and project viewpoints – The parent’s viewpoint analyzes investment’s cash flows as operating cash flows instead of financing due to remittance of royalty or licensing fees and interest payments – Funds that are permanently blocked from repatriation are excluded The parent’s viewpoint gives results closer to traditional NPV capital budgeting analysis Project valuation provides closer approximation of effect on consolidated EPS 6

Project versus Parent Valuation 7 Foreign Investment US$ invested in overseas Particular investment Project Viewpoint Capital Budget (Local Currency) Estimated cash flows of project Parent Viewpoint Capital Budget (U.S. dollars) Cash flows remitted to Parent (FC to US$) END Is the project investment Justified (NPV > 0)? Parent Firm (US) START

Project Assumptions Financial assumptions – Capital Investment – cost to build a plant – Financing – depending on financing methods WACC should be calculated for both the project and parent – Revenues – Costs – Exchange rate assumption – parent’s cash flows are converted into home currency 8

Estimating Cash Flows from Project Viewpoint Project Viewpoint Capital Budget – Estimate the free cash flows of the project by determining EBITDA and not EBT – Taxes are calculated based on this amount – Net Operating Cash Flow = Net Operating Profit After Tax – NOCF = NOPAT 9

Estimating Cash Flows from Project Viewpoint (Continued) Project Viewpoint Capital Budget – Estimate and incorporate net working capital and capital spending – Free Cash Flow (FCF) = Net Operating Cash Flow – Changes in Net Working Capital – Changes in Fixed Assets 10

Estimating Cash Flows from Project Viewpoint (Continued) Project Viewpoint Capital Budget – Terminal value is calculated for the continuing value of the project after the investment horizon TV is calculated as a perpetual net operating cash flow after the investment horizon All FCFs and Terminal Value is discounted using subsidiary WACC. 11

Parent Viewpoint Parent Viewpoint Capital Budget – Cash flows estimates are constructed from parent’s viewpoint Estimate individual cash flows to parent after adjusting for withholding taxes. These cash flows must be in parent firm’s currency Use parent firm’s investment in subsidiary to determine NPV at parent’s WACC – Parent must now use it’s cost of capital and not the project’s – Parent may require an additional yield for international projects 12

Sensitivity Analysis Project Valuation Sensitivity Analysis – Political risk – biggest risk is blocked funds or expropriation Analysis should build in these scenarios and answer questions such as how, when, how much, etc. – Foreign exchange risk Analysis should also consider appreciation or depreciation of the US dollar 13

Real Options Real Option Analysis – DCF analysis cannot capture the value of the strategic options, yet real option analysis allows this valuation – Real option analysis includes the valuation of the project with future choices such as The option to defer The option to abandon The option to alter capacity The option to start up or shut down (switching) 14

Real Options (Continued) Real Option Analysis – Real option analysis treats cash flows in terms of future value in a positive sense whereas DCF treats future cash flows negatively (on a discounted basis) – The valuation of real options and the variables’ volatilities is similar to equity option math 15