NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON

Slides:



Advertisements
Similar presentations
Statistical Quality Control
Advertisements

Chapter 6 - Statistical Process Control
Control Charts for Variables
Chapter 6 - Statistical Quality Control
Chapter 9A Process Capability and Statistical Quality Control
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Chapter Topics Total Quality Management (TQM) Theory of Process Management (Deming’s Fourteen points) The Theory of Control Charts Common Cause Variation.
BMM 3633 Industrial Engineering
Statistical Process Control. 4-2 Lecture Outline  Basics of Statistical Process Control  Control Charts  Control Charts for Attributes  Control Charts.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright ©2011 Pearson Education 17-1 Chapter 17 Statistical Applications in Quality Management Statistics for Managers using Microsoft Excel 6 th Global.
Quality management: SPC II
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Agenda Review homework Lecture/discussion Week 10 assignment
CD-ROM Chap 17-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition CD-ROM Chapter 17 Introduction.
Chapter 18 Introduction to Quality
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
Statistical Process Control
© 2007 Wiley Chapter 6 - Statistical Quality Control Operations Management by R. Dan Reid & Nada R. Sanders 3 rd Edition © Wiley 2007.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
15 Statistical Quality Control CHAPTER OUTLINE
QUALITY CONTROL AND SPC
Methods and Philosophy of Statistical Process Control
Chapter 17 Statistical Applications in Quality Management
X-bar and R Control Charts
Statistics for Managers Using Microsoft® Excel 4th Edition
Statistical Process Control
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
© 2004 Prentice-Hall, Inc. Basic Business Statistics (9 th Edition) Chapter 18 Statistical Applications in Quality and Productivity Management Chap 18-1.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Process Capability and SPC
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 17-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
© 2003 Prentice-Hall, Inc.Chap 13-1 Business Statistics: A First Course (3 rd Edition) Chapter 13 Statistical Applications in Quality and Productivity.
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chapter 14 Statistical Applications in Quality Management Business Statistics: A First.
© 2002 Prentice-Hall, Inc.Chap 15-1 Statistics for Managers Using Microsoft Excel 3 rd Edition Chapter 15 Statistical Applications in Quality and Productivity.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
© 2003 Prentice-Hall, Inc. Quantitative Analysis Chapter 17 Statistical Quality Control Chap 17-1.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Statistical Quality Control
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
© 2005 Wiley Chapter 6 - Statistical Quality Control Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 18-1 Chapter 18 Statistical Applications in Quality and Productivity Management Basic Business.
Yandell – Econ 216 Chapter 17 Statistical Applications in Quality Management Chap 17-1.
Statistical Quality Control
Chapter 7 Process Control.
Statistical Process Control (SPC)
Statistics for Managers Using Microsoft Excel 3rd Edition
Agenda Review homework Lecture/discussion Week 10 assignment
Statistical Process Control
Process Capability.
Presentation transcript:

NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director

Three SQC Categories Traditional descriptive statistics e.g. the mean, standard deviation, and range Acceptance sampling used to randomly inspect a batch of goods to determine acceptance/rejection Does not help to catch in-process problems Statistical process control (SPC) Involves inspecting the output from a process Quality characteristics are measured and charted Helpful in identifying in-process variations

Statistical Process Control (SPC) A methodology for monitoring a process to identify special causes of variation and signal the need to take corrective action when appropriate SPC relies on control charts

SPC Implementation Requirements Top management commitment Project champion Initial workable project Employee education and training Accurate measurement system

Traditional Statistical Tools The Mean- measure of central tendency The Range- difference between largest/smallest observations in a set of data Standard Deviation measures the amount of data dispersion around mean

Distribution of Data Normal distributions Skewed distribution

Sources of Variation Common causes of variation Random causes that we cannot identify Unavoidable e.g. slight differences in process variables like diameter, weight, service time, temperature Assignable causes of variation Causes can be identified and eliminated e.g. poor employee training, worn tool, machine needing repair

Common Causes Special Causes

Histograms do not take into account changes over time. Control charts can tell us when a process changes

Introduction to Control Charts Important uses of the control chart Most processes do not operate in a state of statistical control Consequently, the routine and attentive use of control charts will identify assignable causes. If these causes can be eliminated from the process, variability will be reduced and the process will be improved The control chart only detects assignable causes. Management, operator, and engineering action will be necessary to eliminate the assignable causes.

Introduction to Control Charts Monitor Variation in Data Exhibit trend - make correction before process is out of control A Process - A Repeatable Series of Steps Leading to a Specific Goal

Introduction to Control Charts (continued) Show When Changes in Data are Due to: Special or assignable causes Fluctuations not inherent to a process Represent problems to be corrected Data outside control limits or trend Chance or common causes Inherent random variations Consist of numerous small causes of random variability

Introduction to Control Charts Graph of sample data plotted over time Special Cause Variation Process Average  UCL Mean LCL Common Cause Variation

Commonly Used Control Charts Variables data x-bar and R-charts x-bar and s-charts Charts for individuals (x-charts) Attribute data For “defectives” (p-chart, np-chart) For “defects” (c-chart, u-chart)

Introduction to Control Charts Popularity of control charts 1) Control charts are a proven technique for improving productivity. 2) Control charts are effective in defect prevention. 3) Control charts prevent unnecessary process adjustment. 4) Control charts provide diagnostic information. 5) Control charts provide information about process capability.

Control Chart Selection Quality Characteristic variable attribute defective defect no n>1? x and MR constant sampling unit? yes constant sample size? yes p or np no n>=10 or computer? x and R yes no no yes p-chart with variable sample size c u x and s

SPC Methods-Control Charts Control Charts show sample data plotted on a graph with CL, UCL, and LCL Control chart for variables are used to monitor characteristics that can be measured, e.g. length, weight, diameter, time Control charts for attributes are used to monitor characteristics that have discrete values and can be counted, e.g. % defective, number of flaws in a shirt, number of broken eggs in a box

Control Charts for Attributes –P-Charts & C-Charts Use P-Charts for quality characteristics that are discrete and involve yes/no or good/bad decisions Number of leaking caulking tubes in a box of 48 Number of broken eggs in a carton Use C-Charts for discrete defects when there can be more than one defect per unit Number of flaws or stains in a carpet sample cut from a production run Number of complaints per customer at a hotel

Control Chart Design Issues Basis for sampling Sample size Frequency of sampling Location of control limits

Developing Control Charts Prepare Choose measurement Determine how to collect data, sample size, and frequency of sampling Set up an initial control chart Collect Data Record data Calculate appropriate statistics Plot statistics on chart

Pre-Control nominal value Green Zone Yellow Zones Red Zone LTL UTL Good for machining, but only when Cp is 1.14 Initiate mfg run: 5 consecutive must fall in green zone, if not reevaluate setup. Sample a part. If green continue. If yellow sample another. If second is green continue, and if not look for special cause. If any part is red look for special cause. Sample rate is time between out of control divided by 6.

Control Limits UCL = Process Average + 3 Standard Deviations LCL = Process Average - 3 Standard Deviations X UCL + 3 Process Average - 3 LCL TIME

Next Steps Determine trial control limits Center line (process average) Compute UCL, LCL Analyze and interpret results Determine if in control Eliminate out-of-control points Recompute control limits as necessary

Setting Control Limits Control limits balance risks like Type I error Percentage of values under normal curve

Comparing Control Chart Patterns X X X Common Cause Variation: No Points Outside Control Limits Special Cause Variation: 2 Points Outside Control Limits Downward Pattern: No Points Outside Control Limits but Trend Exists

Typical Out-of-Control Patterns Point outside control limits Sudden shift in process average Cycles Trends Hugging the center line Hugging the control limits Instability

Control Charts for Variables Use x-bar and R-bar charts together Used to monitor different variables X-bar & R-bar Charts reveal different problems In statistical control on one chart, out of control on the other chart? OK?

Processes In Control

Process Out of Control

Shift in Process Average

Identifying Potential Shifts

Cycles

Trend

PROCESS STREAMS UCL Mixtures Sudden stability Center line LCL

Interpreting Control Charts Process In Control Out of Run Chart points do not form a parti- cular pattern and lie within the upper and lower chart limits Chart points form a particular pattern OR one or more points lie beyond the uppor or lower Chart points are on one side of the center line. The number of points in a run is called the “length of the run” UCL 10 x 19 lcl 30 The process is stable, not changing. Doesn’t necesarily mean to leave the process alone. May be opportunities to improve the process and enjoy substantial benefits Alerts us that the process is changing. Doesn’t mean you need to take a corrective action. May be relate to a change you have made. Be sureto identify the reason\(s) before taking any constructive actions(w) Suggest the process has undergone a permanent change (positive or negative) and is now becoming stable. Often requires tha t you recompute the control lines for future interpre- tation efforts. Description Example # 1 Example # 2 Interpretation

Interpreting Control Charts Trend Cycle Hugging A continued rise or fall in a series of points (7 or more consecutive points direction) Chart ponts show the same pattern changes (e.g.rise or fall) over equal periods of time Chart points are close to the center line or to a control limit line (2 out of 3, 3 out of 4, or 4 out of 10.) UCL 10 x 19 lcl 30 CL 10 Description Example # 1 Example # 2 Interpretation 1 2 3 4 5 6 7 1/2 Often seen after some change has been made. Helps tell you if the change(s) had a positive or negative effect. may also be part of a learning curve associated with some form of training often relates to factors that influence the process in a predictable manner. Factors occur over a set time period and a positive/negative effect Helps determine future work load and staffing levels Suggests a different type of data has been mixed into the sub-group being sampled. Often need to change the sub-group, reassemble the data, redraw the control chart

When to Take Corrective Action Corrective Action Should Be Taken When Observing Points Outside the Control Limits or when a Trend Has Been Detected Eight consecutive points above the center line (or eight below) Eight consecutive points that are increasing (decreasing)

Out-of-Control Processes If the Control Chart Indicates an Out-of-Control Condition (a Point Outside the Control Limits or Exhibiting Trend) Contains both common causes of variation and assignable causes of variation The assignable causes of variation must be identified If detrimental to quality, assignable causes of variation must be removed If increases quality, assignable causes must be incorporated into the process design

In-Control Process If the Control Chart is Not Indicating Any Out-of-Control Condition, then Only common causes of variation exist It is sometimes said to be in a state of statistical control If the common-cause variation is small, then control chart can be used to monitor the process If the common-cause variation is too large, the process needs to be altered

Types of Error First Type: Second Type: Belief that observed value represents special cause when, in fact, it is due to common cause Second Type: Treating special cause variation as if it is common cause variation

Remember Control does not mean that the product or service will meet the needs. It only means that the process is consistent (may be consistently bad). Capability of meeting the specification.

How to use the results By eliminating the special causes first and then reducing the common causes, quality can be improved.

Final Steps Use as a problem-solving tool Compute process capability Continue to collect and plot data Take corrective action when necessary Compute process capability

Process Capability Product Specifications Preset product or service dimensions, tolerances e.g. bottle fill might be 16 oz. ±.2 oz. (15.8oz.-16.2oz.) Based on how product is to be used or what the customer expects Process Capability – Cp and Cpk Assessing capability involves evaluating process variability relative to preset product or service specifications Cp assumes that the process is centered in the specification range Cpk helps to address a possible lack of centering of the process

Relationship between Process Variability and Specification Width Three possible ranges for Cp Cp = 1, as in Fig. (a), process variability just meets specifications Cp ≤ 1, as in Fig. (b), process not capable of producing within specifications Cp ≥ 1, as in Fig. (c), process exceeds minimal specifications One shortcoming, Cp assumes that the process is centered on the specification range Cp=Cpk when process is centered

Computing the Cp Value at Cocoa Fizz: three bottling machines are being evaluated for possible use at the Fizz plant. The machines must be capable of meeting the design specification of 15.8-16.2 oz. with at least a process capability index of 1.0 (Cp≥1) The table below shows the information gathered from production runs on each machine. Are they all acceptable? Solution: Machine A Machine B Cp= Machine C Machine σ USL-LSL 6σ A .05 .4 .3 B .1 .6 C .2 1.2

Computing the Cpk Value at Cocoa Fizz Design specifications call for a target value of 16.0 ±0.2 OZ. (USL = 16.2 & LSL = 15.8) Observed process output has now shifted and has a µ of 15.9 and a σ of 0.1 oz. Cpk is less than 1, revealing that the process is not capable

Process Capability (2)

Capability Versus Control Capable Not Capable In Control Out of Control IDEAL

Excel Template

Special Variables Control Charts x-bar and s charts x-chart for individuals

Charts for Attributes Fraction nonconforming (p-chart) Fixed sample size Variable sample size np-chart for number nonconforming Charts for defects c-chart u-chart

p Chart Control Chart for Proportions Is an attribute chart Shows Proportion of Nonconforming (Success ) Items E.g., Count # of nonconforming chairs & divide by total chairs inspected Chair is either conforming or nonconforming Used with Equal or Unequal Sample Sizes Over Time Unequal sizes should not differ by more than ±25% from average sample size

p Chart Control Limits Average Proportion of Nonconforming Items Average Group Size # Defective Items in Sample i # of Samples Size of Sample i

p Chart Example You’re manager of a 500-room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control?

p Chart Hotel Data # Not Day # Rooms Ready Proportion 1 200 16 0.080 2 200 7 0.035 3 200 21 0.105 4 200 17 0.085 5 200 25 0.125 6 200 19 0.095 7 200 16 0.080

p Chart Control Limits Solution 16 + 7 +...+ 16

p Chart Control Chart Solution 0.15 UCL 0.10 Mean 0.05 LCL 0.00 1 2 3 4 5 6 7 Day Individual points are distributed around without any pattern. Any improvement in the process must come from reduction of common-cause variation, which is the responsibility of the management.

p Chart in PHStat PHStat | Control Charts | p Chart … Excel Spreadsheet for the Hotel Room Example

Understanding Process Variability: Red Bead Example Four workers (A, B, C, D) spend 3 days to collect beads, at 50 beads per day. The expected number of red beads to be collected per day per worker is 10 or 20%. Worker Day 1 Day 2 Day 3 All Days A 9 (18%) 11 (12%) 6 (12%) 26 (17.33%) B 12 (24%) 12 (24%) 8 (16%) 32 (21.33%) C 13 (26%) 6 (12%) 12 (24%) 31(20.67%) D 7 (14%) 9 (18%) 8 (16%) 24 (16.0%) Totals 41 38 34 113

Understanding Process Variability: Example Calculations Average Day 1 Day 2 Day 3 All Days X 10.25 9.5 8.5 9.42 p 20.5% 19% 17% 18.83% _

Understanding Process Variability: Example Control Chart UCL .30 .20 .10 _ p LCL 0 A1 B1 C1 D1 A2 B2 C2 D2 A3 B3 C3 D3

Morals of the Example Variation is an inherent part of any process. The system is primarily responsible for worker performance. Only management can change the system. Some workers will always be above average, and some will be below.

The c Chart Control Chart for Number of Nonconformities (Occurrences) in a Unit (an Area of Opportunity) Is an attribute chart Shows Total Number of Nonconforming Items in a Unit E.g., Count # of defective chairs manufactured per day Assume that the Size of Each Subgroup Unit Remains Constant

c Chart Control Limits Average Number of Occurrences # of Occurrences in Sample i # of Samples

c Chart: Example You’re manager of a 500-room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control?

c Chart: Hotel Data # Not Day # Rooms Ready 1 200 16 2 200 7 3 200 21 4 200 17 5 200 25 6 200 19 7 200 16

c Chart: Control Limits Solution

c Chart: Control Chart Solution 30 UCL 20 10 LCL 1 2 3 4 5 6 7 Day Individual points are distributed around without any pattern. Any improvement in the process must come from reduction of common-cause variation, which is the responsibility of the management.

Variables Control Charts: R Chart Monitors Variability in Process Characteristic of interest is measured on numerical scale Is a variables control chart Shows Sample Range Over Time Difference between smallest & largest values in inspection sample E.g., Amount of time required for luggage to be delivered to hotel room

R Chart Control Limits From Table Sample Range at Time i or Subgroup i # Samples

R Chart Example You’re manager of a 500-room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control?

R Chart and Mean Chart Hotel Data Sample Sample Day Average Range 1 5.32 3.85 2 6.59 4.27 3 4.88 3.28 4 5.70 2.99 5 4.07 3.61 6 7.34 5.04 7 6.79 4.22

R Chart Control Limits Solution From Table (n = 5)

R Chart Control Chart Solution Minutes UCL 8 6 _ 4 R 2 LCL 1 2 3 4 5 6 7 Day

Variables Control Charts: Mean Chart (The Chart) Shows Sample Means Over Time Compute mean of inspection sample over time E.g., Average luggage delivery time in hotel Monitors Process Average Must be preceded by examination of the R chart to make sure that the process is in control

Mean Chart Computed From Table Sample Mean at Time i Sample Range at Time i # Samples

Mean Chart Example You’re manager of a 500-room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control?

R Chart and Mean Chart Hotel Data Sample Sample Day Average Range 1 5.32 3.85 2 6.59 4.27 3 4.88 3.28 4 5.70 2.99 5 4.07 3.61 6 7.34 5.04 7 6.79 4.22

Mean Chart Control Limits Solution From Table E.9 (n = 5)

Mean Chart Control Chart Solution Minutes UCL 8 _ _ 6 X 4 2 LCL 1 2 3 4 5 6 7 Day

R Chart and Mean Chart in PHStat PHStat | Control Charts | R & Xbar Charts … Excel Spreadsheet for the Hotel Room Example

Process Capability Process Capability is the Ability of a Process to Consistently Meet Specified Customer-Driven Requirements Specification Limits are Set by Management in Response to Customer’s Expectations The Upper Specification Limit (USL) is the Largest Value that Can Be Obtained and Still Conform to Customer’s Expectation The Lower Specification Limit (LSL) is the Smallest Value that is Still Conforming

Estimating Process Capability Must Have an In-Control Process First Estimate the Percentage of Product or Service Within Specification Assume the Population of X Values is Approximately Normally Distributed with Mean Estimated by and Standard Deviation Estimated by

Estimating Process Capability (continued) For a Characteristic with an LSL and a USL where Z is a standardized normal random variable

Estimating Process Capability (continued) For a Characteristic with Only a LSL where Z is a standardized normal random variable

Estimating Process Capability (continued) For a Characteristic with Only a USL where Z is a standardized normal random variable

Process Capability Example You’re manager of a 500-room hotel. You have instituted a policy that 99% of all luggage deliveries must be completed within 10 minutes or less. For 7 days, you collect data on 5 deliveries per day. Is the process capable?

Process Capability: Hotel Data Sample Sample Day Average Range 1 5.32 3.85 2 6.59 4.27 3 4.88 3.28 4 5.70 2.99 5 4.07 3.61 6 7.34 5.04 7 6.79 4.22

Process Capability: Hotel Example Solution Therefore, we estimate that 99.38% of the luggage deliveries will be made within the 10 minutes or less specification. The process is capable of meeting the 99% goal.

Capability Indices Aggregate Measures of a Process’ Ability to Meet Specification Limits The larger (>1) the values, the more capable a process is of meeting requirements Measure of Process Potential Performance Cp>1 implies that a process has the potential of having more than 99.73% of outcomes within specifications

Capability Indices Measures of Actual Process Performance (continued) Measures of Actual Process Performance For one-sided specification limits CPL (CPU) >1 implies that the process mean is more than 3 standard deviations away from the lower (upper) specification limit

Capability Indices For two-sided specification limits (continued) For two-sided specification limits Cpk = 1 indicates that the process average is 3 standard deviations away from the closest specification limit Larger Cpk indicates larger capability of meeting the requirements

Process Capability Example You’re manager of a 500-room hotel. You have instituted a policy that all luggage deliveries must be completed within 10 minutes or less. For 7 days, you collect data on 5 deliveries per day. Compute an appropriate capability index for the delivery process.

Process Capability: Hotel Data Sample Sample Day Average Range 1 5.32 3.85 2 6.59 4.27 3 4.88 3.28 4 5.70 2.99 5 4.07 3.61 6 7.34 5.04 7 6.79 4.22

Process Capability: Hotel Example Solution Since there is only the upper specification limit, we need to only compute CPU. The capability index for the luggage delivery process is .8337, which is less than 1. The upper specification limit is less than 3 standard deviations above the mean.

Thank You