Chain Surveying:Chain surveying is a simpllest type of survey in whice is divided into a number of well condition tringles and only linner measurments.

Slides:



Advertisements
Similar presentations
SURVEYING It is the technique, profession, and science of accurately determining the terrestrial or three-dimensional position of points and the distances.
Advertisements

CHAPTER 3: Drafting Equipment
Chapter 9 Route Surveying – Part 3
Surveying Chain Surveying
Errors and Horizontal distance measurement
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Architectural Drafting Equipment
PERPENDICULAR AND PARALLEL LINES PARALLEL LINES Parallel lines are lines that do not intersect. No matter how far you extend them, they will never meet.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Faculty of Applied Engineering and Urban Planning Civil Engineering Department First Semester 2010/2011 Surveying Chain Surveying Part I Lecture 4 - Week.
Chemical Department. Guided by- prof D.M Prajapati. Prof. J. M. Jadav
Unit 2: Chain Surveying 25 November 08 Unit 2 :Chain Surveying.
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Faculty of Engineering Technology
CHAPTER 2 CHAIN SURVEYING Tape Measurements
1.Meet B Parmar ( ) 2.Swapnil A Parmar ( ) 3.Pratik C Patel ( ) B.E- 2 SEM MECHANICAL ENGINEERING LINEAR MEASUREMENTS.
TRUE MERIDIAN The line passing through the geographical north pole ,geographical south pole and any point on the sourface of the earth,is known as true.
Pacific school of engineering
1 Area Calculations. 2 Introduction Determining the boundaries and size of an area is a common occurrence. Chemical spill Wet land Watershed Etc.  For.
TECHNICAL DRAWING. Unit 2.Drawing applied to technology.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
1 Area Calculations. 2 Introduction  Determining the size of an area is a common problem of landscaping. Application of chemicals Amount of sod Number.
GRAPHICS EQUIPMENT. Tasks Using a piece of A3 paper make a mind map of all the piece of graphics equipment that you can think of. Write down the name.
Dimensioning & Scaling
Chapter 2 Architectural Drafting Equipment. 2 Links for Chapter 2 Drafting Supplies Drafting Instruments Drafting Machines.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Compass Survey Part 1: Conducting a compass.
AutoCAD …. Lecture 2 Dr. Steve Ramroop 9/12/2015 GEM Lecture 2 Content Drawing environment – Drawing equipment – Drawing setup.
STUDENTS NAMEID.NO.ENROLLMENT NO. MOD. JISHAN KHAN13PES NEEL SUTHAR13PES MILAN LAKHANI13PES GUJARAT TECHNOLOGICAL.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
TECHNIQUES IN BASIC SURVEYING
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
Area Measurements.
Area Measurements.
Geometric Construction & Modeling Basics. Points A point represents a location in space or on a drawing. It has no width, height or depth. Sketch points.
Module 3 Drafting Equipment Identify Basic Drafting Equipment.
Geology and Surveying (Part B - Surveying) Distance Measurement.
SUBJECT - SURVEYING – I SUB.CODE - CE6304
TESTING A CHAIN: When a tension of 8kg is applied at the ends of a chain and compared against a certified steel band standardized at 20°C, every meter.
CHAPTER 3 LINEAR MEASUREMENTS
Lesson Applying Differential Leveling Techniques.
Mapping Unit Review. Problem 1 1. A level is set up on a job site and a reading is taken off the benchmark. The reading on the rod is found to be 3’-
ENGINEERING GRAPHICS By R.Nathan Assistant Professor Department of Mechanical Engineering C.R.ENGINEERING COLLEGE Alagarkovil, Madurai I - SEMESTER.
1 TOPIC:- COMPUTATION OF BOUNDARY AREA NAMEPEN NO 1.RUCHIR MISTRY MIYANI DIKEN MOHIT KHANPARA MANSUR ADIL
Objectives To develop knowledge of the vocabulary and terminology of shape. To consider activities to develop children's understanding of shape. To examine.
PLANE TABLE SURVEYING SURVEYING – I
INSTRUMENTS USED IN PLANE TABLE SURVEYING.
MINE AUTOMATION AND VIRTUAL REALITY PROJECT By Prof D Chakravarty, Prof B Samanta, Prof A Bhattacherjee, Prof J Bhattacharya Department of Mining Engineering.
CIVIL DEPRATMENT.
Made by- Civil 3rd semester
GOVERNMENT ENGG. COLLEGE B.E Semester III :- Civil Engineering
Handled by, R.PRADEEPA, M.E Assistant Professor, Department of Civil Engg, PITS.
Mr. Vedprakash Maralapalle, Asst. Professor
Investigation of Road Project By S.N. Nanaware
Chain survey
DRAFTING TOOLS AND USES Standard AC-IDD-4- Demonstrate the correct use and management of all drafting tools and supplies. 4.1 Identify and demonstrate.
Chapter 5: Locating and setting out
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
DIFFERENTIAL – PROFILE LEVELING
Chain surveying Notes.
Investigation of Road Project
Visit for more Learning Resources
Unit 5: Locating and setting out Dr
Chapter 5: Locating and setting out
Engineering surveying : Compass surveying
Plane table surveying with contouring
Sometimes it will be observed that many obstructions like rivers, canals, ponds. thick jungles, ditches, buildings, etc. lie on the chain line. These.
Chain survey By :- Parveen Kumar.
Objective Describe the drawing equipment needed to produce a scaled drawing of an agricultural engineering project.
Landscape Design Tools
Engineering Surveying Linear Survey
Presentation transcript:

Chain Surveying:Chain surveying is a simpllest type of survey in whice is divided into a number of well condition tringles and only linner measurments are ment in the field When suitable 1.When the sourface is more or less level 2.A small area is to be surveyed 3.A small scale map is to be prepared 4.The formation of well-conditioned triangles is easy When unsuitable 1.The area is too large 2.The area is consists of too many undulations 3.The area is crowded 4.The formation of well-conditioned triangles is not easy

Large scale map: when 1cm of a map represent a small distance Large scale map: when 1cm of a map represent a small distance.it is said to be a large scale map.Having an RF less than 1/500. Small scale map: when 1 cm of a map represent a large distance.it is said to be a small scale map.Having an Rf more than 1/500.

Well conditioned triangles A triangle is called well-conditioned triangle when no angle in it is less than 30 degree or large than 120 degree. Ill conditioned triangles A triangle is called ill-conditioned triangle when a angle is less than 30 degree or a angle is large than 120 degree.

Survey stations Main stations Subsidiary stations Tie stations

Survey stations The biggining and the end points of the chain line are called survey stations. 1.Main stations. which stations are taken along the boundary of an area as controlling points are known as main station. 2.Subsidiary stations. Which stations are taken on the main survey lines or other chain line are known as subsidiary station. 3.Tie stations. Which stations are taken on the main survey lines are known as tie stations.

Base line:The line on which framework of the survey is build is known as base line. Check line:The line which is used for Checking the accuracy of the triangle is called Check line. Offsets:Offsets is the lateral shortest distance of an object measured from a survey line.

Offsets Parpendicular offsets Oblique

Perpendicular Offsetes:The parpendicular shortest distance of an object measured from a survey line is called parpendicular offsetes. Oblique Offsetes:The oblique shortest distance of an object measured from a survey line is called oblique offsetes.

2.By setting a right angle in the ratio 3:4:5. Ways of taking parpendicular offsets 1.By setting a parpendicular by sawing a tape from the object to the chin line. 2.By setting a right angle in the ratio 3:4:5. 3.By setting a right angle by tri-square. 4.By setting a right angle by optical-square.

RUET Whey perpendicular offsets are preferred 1.They can be taken very quickly 2.The progress of the survey is not hampered 3.The entry in the field book becomes easy 4.The plotting of the offsets also becomes easy

Number of offsets 1.When the boundary of the object is approxiomately parallel to the chain line,parpendicular offsets are taken at regular intervals.

Number of offsets 2.When the boundary is straight,parpendicular offsets are taken at both ebds of it.

Number of offsets When the boundary of the object is circular, parpendicular offsets are taken at regular intervales.

Number of offsets When the boundary of the object is zigzag,parpendicular offsets are taken at every bend point.

Number of offsets When road cross the chain line parpendicularly,the chainage of the intersection point is to be noted.

Number of offsets When the road cross the chain line obliquely,the chainage of the intersection point is to be noted,and at least one parpendicular offset is taken.

Number of offsets When the building is small,every corners of the building is fixed by parpendicular or oblique offsets. Other diimension are taken directly at the field.

Number of offsets When the building is large,every corners of the building is fixed by parpendicular or oblique offsets.The full plan of the building is drawn in a separet page , and add it at the right place of the field book

Slection Of Survey Station 1.The base line should be longest of the main survey line. 2.The survey line should be taken through fairly level ground. 3.The main survey line should pass close to the boundary line of the area. 4.The survey line should be close to the object. 5.The survey line should not pass through the main road. 6.The stations should be so selected that the general principle of srveying may be followed. 7.The stations should be intervisible. 8.The stations should be selected in such a way that well conditioned triangles may be formed. 9.Station should be selected in such a way that it avoid chaining obstacle. 10.The tie station should be slected carefully. 11.The subsidiary station should be slectd correctly.

Equipment For Chain Survey 1. Field book 2. Good pencil 3. Rubber 4 Equipment For Chain Survey 1.Field book 2.Good pencil 3.Rubber 4.Sharpner 5.Chain 6.Tape 7.Arrows 8.Ranging rods . 9.Offsets Rod 10.Mallet 11.Pages 12.Clinometer 13.Prismatic compass 14.Optical square

Field Book The note book in which field measurments are noted is known as the field book.The size of the note book is 20cm×12cm.There are two kinds of field book . 1.Single-line 2.Double-line Single-line field book:In this type of book,a single red line is drawn through the middle of the each page.The line represent the CHAIN LINE. Double-line field book:In this type of book, double red line are drawn through the page.This column represent the CHAIN LINE.

Equipments for plotting 1. Drawing board 2. Tri-square 3. Set-square 4 Equipments for plotting 1.Drawing board 2.Tri-square 3.Set-square 4.Protactor 5.Cardboard scale 6.Instrument box 7.French curve 8.Offset scale 9.Dtawing 10.Good pencil 11.Good eraser 12.Board clip 13.Ink 14.Colour 15.Inking pen 16Knife 17.Mini drafter

Cross-staff: The cross-staff is a simple instrument for setting out right angles.There are three kinds of cross-staff 1.Open 2.French 3.Adjustable Optical-square:Optical-square is also a instrument for setting out right angles.