PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)

Slides:



Advertisements
Similar presentations
Soil Preparation Expectations Maintenance Examples.
Advertisements

NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Introduction to Windbreaks This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service.
Tree Planting MMXI.
WILLOW HARVESTING & BIOENGINEERING BASICS. BIOENGINEERING: The use of living plant materials to stabilize streambanks Most bioengineering gives Mother.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
THE BENT WILLOW POLE METHOD. BIOENGINEERING: The use of living plant materials to stabilize streambanks Most bioengineering gives Mother Nature a jump.
Structure and Function
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WATER CONSERVATION PRINCIPLES AND PRACTICES. Water conservation “ The conservation treatment meant to reduce or prevent sheet erosion while achieving.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Introduction to Planting In Dry Areas This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
Ms. Gripshover Landscaping Unit 16. » Identify the different methods of harvesting plant materials used by the nursery » trade. » Prepare for planting.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Where Living Things are Found.
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
New Adventures in Bioengineering, Willow Curtains & Willow Poles Note: REM put out an album a few years called “New Adventures in Hi-Fi” and I firmly believe.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
SOIL-CHOKED STONE KEYS WITH VEGETATION
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
GRADE CONTROL.
ONONDAGA CREEK, NEAR SYRACUSE, NY
Black Creek Streambank Stabilization Projects
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)

LEARNING OBJECTIVES: The student will be able to articulate the general purpose and functions of how plants stabilize banks, and how bioengineering projects should function. The student will be able to conceptually design a bank protection scheme using any of three bioengineering methods (two of which are WES developed and experimental) that employ the branches, trunks, and/or roots of willow trees to reduce streambank erosion.

Now that’s a crib!

U.S ARMY CORPS OF ENGINEERS - Woven willow mattress, Missouri River, circa , note brush layering up bank

BIOENGINEERING *** ??WHAT ARE YOU TRYING TO DO?? *** DID I MENTION, FUNCTION-BASED DESIGN????? PROBLEMS: For rills & gullies from overland flow, strong and dense rooted ground covers or grasses might function well. Use pioneer species that will stabilize the bank and evolve into a climax forest? Plant specific plants for use by specific fauna? Do you need an understory, mid-story and overstory? Or not? Do you need no mid-story for woodpecker flyways? Will the overstory shade out the understory? Vegetative roughness or living dikes to reduce flow velocities & catch sediment? Do you need shade and canopy over the stream? Microhabitats? Insect production for the stream? Tall veg and canopy to keep cool moist air over the stream? Flood concerns? Use herbaceous plants!?!?

VEGETATION CAN HOLD YOUR WORLD TOGETHER !!!

Conceptually, LIST PLANT CHARACTERISTICS NEEDED (not a specific plant) to satisfy performance goals

What’s the effective root depth??

Bioengineering Planting Considerations First look up, then look down, (up to analyze for amount of light and overhead power lines, down for suitable soil & pipeline right-of-ways), then look around for exotic plant competition, and where (or if) the plants of choice are growing naturally. Plants on opposite banks might grow in different elevation bands. If plants are not found naturally, why? Plant materials can be obtained through commercial growers, NRCS plant material centers, grown in-house, or harvested from the wild. Harden-off rooted-stock plants (place outside greenhouse) before planting. Harvested cuttings should be kept moist and out of direct sunlight. Some cuttings benefit from soaking (up to 31 days for Black Willow). Water that plants are soaked in should be fresh. Very important to have good soil-to-stem contact, this must be carefully specified in contracts Plantings need to be closely monitored for insect infestation and mortality, some replanting can be expected during the second growing season. Is irrigation needed? Weed control? Browsing control?

Consider the effects of canopy and shade Picture from Dave Derrick

How Vegetative Treatments Stabilize Banks Foliage slows floodwaters on and near the eroding bank. Root network helps to bind soil together. Trunks and stems can trap debris and upslope failed material. Vegetation removes soil moisture through transpiration. Larger branches/trunks planted deep can sometimes mechanically stabilize soil, and could possibly pin shallow failure faults. Can induce sedimentation. Most importantly, the resulting stable bank allows for the establishment of volunteer plant growth and subsequent vegetative succession.

Cotton losing the competition for water, nutrients & sun with a large Oak Tree.

Adventitious Rooting Material Planting Considerations Should be harvested & planted when dormant IF PLANTED DURING THE NON- DORMANT Or refrigerated at 28 degrees (wrapped in plastic so material will not dry out and boxed in waxed cardboard boxes) and kept frozen until planted Or soaked for 10 days if harvested & planted when not dormant (expect about 25% to live)

Harvesting Pole- sized Adventitious Rooting Material

Matt Horvat with safety glasses & ear plugs cutting willows with chainsaw CONSTRUCTION-TOLEDO OHIO PROJECTS. PIX BY KRIS PATTERSON

Teen volunteers cutting branches & leaves from poles CONSTRUCTION-TOLEDO OHIO PROJECTS. PIX BY KRIS PATTERSON

Use stout twine to bind a set number of poles into a manageable bundle. Twine should be looped & tied at one end, then looped & tied at the opposite end, thus providing a carrying handle CONSTRUCTION-TOLEDO OHIO PROJECTS. PIX BY KRIS PATTERSON

Soaking willow, half out of water, half of the pole should be submerged with butt ends underwater. Research by Dr. Doug Shields showed that soaking Black Willow 10 days will increase root production by 2,600%, 100% flushed out, & twice as many survived. Fence is to protect from beaver browse. CONSTRUCTION-TOLEDO OHIO PROJECTS. PIX BY JOHN MCCULLAH 2010

Onondaga Nichol Road Bridge, LaFayette, NY – project planted TWO-STAGE SLIT TRENCH TECHNIQUE

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at right bank. Pix by Derrick

Stream was straightened & stacked stone walls built along the red lines, all without a permit!!

Some stone was removed from the walls, then trenches dug, (brown lines), live poles placed in the trenchs, then stone added to provide a “funnel” effect to prevent the stream from flanking the project & bridge.

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Rubber tired backhoe digs 4-5 ft deep trench with a narrow bucket. Pix by Bill Frederick

TWO-STAGE SLIT TRENCH TECHNIQUE Water table Dig the trench down into the permanent water table} Spoil

TWO-STAGE SLIT TRENCH TECHNIQUE The capillary (Vadose) zone {moist area above the water table} is shown in pink. Water table Butt ends of willows need to be in the vadose zone.

TWO-STAGE SLIT TRENCH TECHNIQUE Take the last scoop of soil dug from the trench & place it back into the trench (soft Material to place butt ends of poles into.

TWO-STAGE SLIT TRENCH TECHNIQUE Place willows & other water-loving species into loose soil at bottom of trench. They are then less likely to fall over when trench is backfilled.

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Many hands get things done quickly, 2,740 plants planted in about 6 hours. Pix by Derrick

TWO-STAGE SLIT TRENCH TECHNIQUE Partially backfill the trench.

TWO-STAGE SLIT TRENCH TECHNIQUE Plant other species that require less water than the willow. In this case Sycamore & Red Osier Dogwood

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Partially backfill, then plant species that require less water (Red Osier Dogwood & Sycamore). Pix by Derrick

TWO-STAGE SLIT TRENCH TECHNIQUE Completely backfill trench & water plants in DONE

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Backfill using either the bulldozier or hoe. Pix by Derrick

PLANT PLANTS ON A GRID (PERPENDICULAR & PARALLEL TO THE DIRECTION OF HIGH FLOW)

Black Willow, Streamco Willow, Red Osier Dogwood & Sycamore were planted using the Slit Trench bioengineering method. 40 RPM container plants (7 species of trees & shrubs) were planted in the green oval areas. Plantings form a grid to flow. No matter how water flows through the project, it encounters rows of vegetation (Living Dikes)

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Slit Trenches on the grid pattern. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted LET’S SEE HOW IT GROWS

Onondaga Nichol Road Bridge, LaFayette, NY – project planted BEFORE :00am. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted AFTER Noon. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Aug 3, 2007 Less than 3 months after installation. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Creek-Year 2 July 10, {middle of second growing season} Looking at Slit Brush Layering (left bank). Pix by Derrick

Onondaga Creek-Year 2 July 10, {middle of second growing season} Right overbank lush growth, average height is 7 to 9 ft tall. Pix by Derrick

2 YEARS & 1 MONTH LATER-Mark with ft tall willow. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 21, YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS LATER-Looking robust floodplain bench growth 3 YEARS LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS LATER-Robust streamside growth!!! 3 YEARS LATER-Onondaga Nichol Rd Bridge-DERRICK

WHY WILLOW?? Willows, dogwoods, alders, & cottonwoods (early pioneer species) hold the bank together & provide roughness until other slower growing species or the seed bank kicks in. Willows will not be long-term dominants, they are short-term aggressors that stabilize banks quickly post-construction. Paraphrased from Paul Fuhrmann, Ecology & Environment

Onondaga Nichol Road Bridge, LaFayette, NY – project planted TWO LAYERS OF “SLIT” BRUSH LAYERING

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Two rows of Slit Brush Layering located along black lines. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted This is almost a Live Siltation retrofit. Pix by James Bennett

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Slit Brush Layering the Streamco Willow close to water surface. Pix by Kathy Blaisure

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at both layers of completed Slit Brush Layering. Pix by Bill Frederick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at both layers of Slit Brush Layering. Pix by Bill Frederick

Onondaga Creek-Year 2 July 10, Looking at Slit Brush Layering. Pix by Derrick

Onondaga Creek-Year 2 July 10, Looking at Slit Brush Layering. Pix by Derrick

2 YEARS & 1 MONTH AFTER PROJECT COMPLETION Photos by Derrick JUNE 18, 2009

2 YEARS & 1 MONTH left bank Slit Brush Layering. Vegetation is robust & lush & fully functioning. Red Osier Dogwood is dominating the Slit Brush Layering on the bank 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Looking 2 rows of Slit Brush Layering. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

Tree eaters can cause problems, but usually of a cyclic nature Beaver damage Rocky the Dog damage

Clear Creek, Bovina, MS. Another shot of beaver- browsed willow resprouting

Beware invasive exotics, 7 million acres of Kudzu down south (small patch shown here)

Adventitious Rooting Plants (when trunk or branches are in contact with soil the plant will sprout roots) Banker’s Willow- Salix x cottetii, Streamco Willow- Salix purpurea, Black Willow- Salix nigra, Pussy Willow- Salix discolor, & Crack, Autumn etc. Red Osier Dogwood- Cornus stolonifera Silky Dogwood- Cornus amomum Buttonbush- Cephalanthus occidentalis Sycamore- Platanus occidentalis Cottonwood- Populus deltoides Box Elder- Acer negundo Speckled Elder-(bark was scarred)- Alnus rugosa Elderberry- Sambucus Canadensis Elm- Ulmus Americana Bois d'arc, Mock Orange, Bow Wood, Hedge Apple, Horse Apple, Osage Orange- all are Maclura pomifera. River Birch- (Betula nigra) Black Locust- (Robinia psedoacacia) Northern Catalpa- (Catalpa speciosa) Mulefat- (Baccharis salicifolia) Anyone know of any others???

ADVENTITIOUS ROOTING PLANTS NEED TO BE PLANTED WHEN THE PLANTS ARE DORMANT {AFTER THE LEAVES HAVE DROPPED & BEFORE THE LEAF BUDS APPEAR IN THE SPRING}

TRANSPLANT A BIG CLUMP OF STUFF

TRANSPLANTED LIVING WILLOW RETARDS MONKEY RUN STREAM REALIGNMENT PROJECT, ARCADE, NY THINK BIG!!!! THINK INSTANT!!! Transplanting an entire big clump of willows (roots and all) a track hoe bucket (4 ft wide) at a time Multi-function, used to weigh down bank protection and provide bank protection, shade, cover, insect habitat, etc

Looking US at Pool #1, log revetment in place and anchored with duckbill anchors Mini case study: 1 of 4

Grab a scoop of willows Mini case study: 2 of 4

More willows Mini case study: 3 of 4

Looking US at Living Willow Retard two growing seasons after planting Aug 24, 2006 Pix by Derrick Mini case study: 4 of 4

TRANSPLANT A LITTLE BITTY CLUMP OF STUFF MONKEY RUN, ARCADE, NY Mini case study: 1 of 5

Looking DS. Creeping bent grass sod transplantation to define channel width-Nov 5, 2006 Mini case study: 2 of 5

Aug 24, Looking DS at the Bend #2 pointbar Pix by Derrick Mini case study: 3 of 5

Watercress, mint, creeping bentgrass, etc Plants that occupy that occupy edge between terra firma & water with much mass in the water, good refugia for bugs, and juvenile & young-of-year fishes

Aug 24, Great diversity & shallow areas on the pointbar. Almost a hemi-wetland!!!! Pix by Derrick Mini case study: 4 of 5

Aug 24, Looking DS at Bend #2, note nice growth on pointbar Pix by Derrick Mini case study: 5 of 5

Half-Drowned Bushes with Traffic Control Stones & additional plantings.

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Pre-dig and Over-dig pool.

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig, place veg, & fill keys with stone.

Dig hole for Traffic Control Stone (TCS), place willow against bank, push TCS into position, backfill. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig holes for Traffic Control Stones, place live poles against bank, set TCS’s. TCS

Half-Drowned Bush with Traffic Control Stones Flow Pre-dug & Overdug Pool Key Dig hole for Half Drowned Bush. TCS

Track hoe carrying the Half-Drowned Bush. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY DERRICK

Half-Drowned Bush with Traffic Control Stones Flow Key TCS Place Half-Drowned Bush. Roots should be at proper level relative to needs of plant. Bushes should be angled downstream & partially in water.

Hole was dug in bank, then Half-Drowned Bush is planted deep. McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

Half-Drowned Bush with Traffic Control Stones Flow If needed, stabilize Half-Drowned Bush & roots with additional stones. TCS

the transplanted Half-Drowned Willow Bush McKINSTRY CR. DOT MITIGATION – 7/10/ PIX BY JOE GALATI

This bush never lost its leaves even though it was transplanted in summer. McKINSTRY CR. DOT MITIGATION – 10/23/ PIX BY JOE GALATI

2 Years later. Looking Half-Drowned Bush. Note shade, cover, & branches dragging in water. McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

2 years later. Looking Half-Drowned Bush McKINSTRY CR. NY. DOT MITIGATION – 6/6/ PIX BY DERRICK

4 YEARS LATER-McKINSTRY CR. NYS-DOT MITIGATION - DERRICK – 7/11/ YEARS LATER-Half-Drowned Bush & Lesta Ammon’s head

BIOENGINEERING INFO SOURCES Federal Interagency Stream Restoration Working Group, Stream Corridor Restoration: Principles, Processes, and Practices. National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia Gray, Donald H. & Sotir, Robin B. (1996) Biotechnical and Soil Bioengineering Slope Stabilization: A Practical Guide for Erosion Control. John Wiley & Sons, Inc. New York, NY Schiechtl, Hugo, (1980) Bioengineering For Land Reclamation & Conservation. The University of Alberta Press Schiechtl, Hugo M., & Stern, R. (1996) Water Bioengineering Techniques for Watercourse Bank and Shoreline Protection. Blackwell Science, Inc. GOOGLE: F. Douglas Shields; Donald Roseboom; Andrew Leiser; Robin Sotir; John McCullah; Phillip Balch; S.R.Pezeshki

LEARNING OBJECTIVES: The student will be able to articulate the general purpose and functions of how plants stabilize banks, and how bioengineering projects should function. The student will be able to conceptually design a bank protection scheme using any of three bioengineering methods (two of which are WES developed and experimental) that employ the branches, trunks, and/or roots of willow trees to reduce streambank erosion.

Clean Fun in AR